1 Feb 2011 Actuators (4) Optical sensors DIFFUSER CM29 Irises.

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
PRESENTED BY: NEHA SAMDANI PRAJJWAL DEWASKAR M.ftech-3 rd sem PRESENTED BY: NEHA SAMDANI PRAJJWAL DEWASKAR M.ftech-3 rd sem.
A Presentation on Milling Machine Submitted by: Nikhil Nama Nikhlesh Sharma Nischal Rao Jaipur Engineering College And Research Centre.
IRIS Diffuser V. Blackmore MICE Analysis Meeting: 24/08/10 IRIS: Incredibly Redesigned Intrinsic Scatterer 1/9.
D IFFUSER S TATUS : MICO M EETING, 16 TH N OV V. Blackmore.
Heavy Engineering & Reclamation Specialists. Baker & Provan Capability Heavy Engineering –Reclamation Specialists –Machining, –Fabrication, –Assembly.
CM30 University of Oxford Engineering session Peter Ford Tim Hayler Eddie Holtom Roy Preece Jason Tarrant Steve Virostek.
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Water Tests of Hg System V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting Dec 8, 2006.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Production of precise large PCB’s Introduction to the problem Achievement in collaborating with industry (Print Electronics in IL and MDT in Italy). Conclusions.
Manufacturing Techniques
AIDA Infrastructure for very forward calorimeters 13/11/2012 In collaboration with: François-Xavier Nuiry Andrea Catinaccio Konrad Elsener 113/11/2012AIDA.
Department of Mechanical and Aerospace Engineering, The Ohio State University ME 4900 Intro. to Design Studies ME 4902 Motor Sports Competitions ME 4901.
Manufacturing of Mac Pro By Gabriele Deep draw stamping. The enclosure is drawn through a series of dies that progressively stretch the aluminum.
Harry McMullan. Design brief In my project I am manufacturing a tipping swarf bin/ dumper for workshop in Bangor There are many others on the market although.
Anduze – 03/09/ Alveolar Structure - Towards ordering of pieces.
Schedule meeting May May 2011 THE DIFFUSER 1.Requirements 2.Description 3.Components 4.Trials 5.Schedule.
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
FLUID POWER Christopher Peterson Intro to Tech and Science Education.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Waveguide for Station 5 M. Yoshida (Osaka Univ.).
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
The HCAL barrel absorber structure
Si sensors for LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
Application: Telecommunications Electronics Housing Functional Requirements: Magnetic isolation, heat dissipation, easy assembly Competing Technologies:
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
PRESENTED BY SUBMITTED TO ANUJ KUMAR SRIVASTAVA Mr. DEEPAK SHARMA ME-1 3 rd YEAR COORDINATOR AND FACCULTY ROLL NO IMSEC MILLING.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
Downstream Cherenkov Gh. Grégoire University of Louvain MICE collaboration meeting RAL, October 28, 2004 Design study for the Technical Reference Document.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
Gears By: Student Name Class: 8D Date: April, 30, 2003.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
W Prototype Simulations Linear Collider Physics & Detector Meeting December 15, 2009 Christian Grefe CERN, Bonn University.
EIFELWERK Präzisionsgusstechnik GmbH, Thomas Croy (11) © 2011 Eifelwerk-Gruppe 1 Quality out of one hand.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
435B Transport Container Fabrication Challenges and Solutions
First Wall Panel - Overview
Baby-MIND Modules & Services
Mold base production solutions
Commercially available Tungsten Plates
How I Made My Bustier….
Hadronic Shower Structure in WHCAL Prototype
C.Clerc ILD session, ALCPG /03/2010
Chamber Design and Integration RE3/1 and RE4/1
My engineering project tipping swarf bin
New Design for Beam Test Structure
Diffuser V. Blackmore CM32, RAL, 10/02/
Call to Fix Dell Printer Error Code
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

1 Feb 2011 Actuators (4) Optical sensors DIFFUSER CM29 Irises

2 Feb 2011 About 75 – 80 percent complete –Materials in hand –All Tufnol cassettes made –2 sets brass petals (3mm & 6mm) made –6mm brass cassette assembled & tested by hand –Drum being machined –Four home-made non-magnetic actuators made; one tested –PCBs for opto-sensors made & stuffed –Mods to electronics crate ~ finished Not committed to final front panel yet (cosmetics) –Still to finalise design of air crate Need some experience of pneumatic actuators Progress limited by –Availability of effort / CNC machines / my availability to chase

3 Feb 2011 Technical problems 1.Proved tricky to machine 4mm thick SS “inner rings” Aluminium not good enough Need to grind machined SS flat 2.Tolerances of slots in petals are tricky Long lever arm to centre 0.05 mm gets multiplied by ~8 when closed Unsightly gaps at centre (bad teeth!) ~1% physics problem Mainly annoying But may be worse with Tungsten Examining solutions We want to play with some slots & holes in some gash tungsten before cutting the petals – expensive material

4 Feb 2011 SCHEDULE Main hold up is availability of effort (including me & V.B.) & machines Mechanics finished “not before Easter” (24 April)