[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 05 Overall Project Objective : Dynamic Control.

Slides:



Advertisements
Similar presentations
Programmable FIR Filter Design
Advertisements

Status Specification definition (done) Architecture
M2: Team Paradigm :: Milestone 6 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
WaitLess*: Presentation #5 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan Overall Project Objective: Table/bar service interface.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 29 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 19 Overall Project Objective : Dynamic Control.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions.
E-Voting Machine - Design Presentation Group M1 Bohyun Jessica Kim Jonathan Chiang Chi Ho Yoon Donald Cober Mon. Oct 13th Beginning Gate Level Layout Secure.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Sep 17 Overall Project Objective : Dynamic Control.
Noise Canceling in 1-D Data: Presentation #9 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 23 rd, 2005 Full chip.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 01 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 22 Overall Project Objective : Dynamic Control.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage VI: February 25 h 2004.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 10: April 5th Chip Level Simulation Overall Project Objective: Design an.
Noise Canceling in 1-D Data: Presentation #10 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 28 rd, 2005 Chip Level.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Camera Auto Focus Presentation 4, February 14 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 27 Overall Project Objective : Dynamic Control.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis April 4, 2005 MILESTONE 11 LVS & Simulation DSP 'Swiss.
M3: ProDiver 525 *Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 2 Feb 04 Size Estimates/ Floor Plan Overall.
Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 4 MAD MAC th February, 2006 Gate Level Design.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Mon. Nov. 11 Overall Project Objective : Dynamic Control.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
E-Voting Machine - Design Presentation Group M1 Bohyun Jessica Kim Jonathan Chiang Chi Ho Yoon Donald Cober Mon Oct 6 th Floorplan again Structural Verilog.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Dynamic Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Dec. 3 Project Objective : Dynamic Control.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis March 16, 2005 MILESTONE 8 Functional Blocks DSP 'Swiss.
1 Team M1 Enigma Machine Milestone April, 2006 Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design Manager: Prateek Goenka.
E-Voting Machine - Design Presentation Group M1 Bohyun Jessica Kim Jonathan Chiang Chi Ho Yoon Donald Cober Mon, Nov 10 Functional Layout Blocks Floor.
Sprinkler Buddy Presentation #8: “Testing/Finalization of all Modules and Global Placement” 3/26/2007 Team M3 Kartik Murthy Panchalam Ramanujan Sasidhar.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Sep 15 Overall Project Objective : Dynamic Control.
Sprinkler Buddy Presentation #7: “Redesign of Adder Parts And Layout of Other Major Blocks” 3/07/2007 Team M3 Kalyan Kommineni Kartik Murthy Panchalam.
Noise Canceling in 1-D Data: Presentation #5 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 21 st, 2005 Component.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis March 23, 2005 MILESTONE 9 Chip level LVS DSP 'Swiss Army.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
E-Voting Machine - Design Presentation Group M1 Bohyun Jessica Kim Jonathan Chiang Chi Ho Yoon Donald Cober Mon, Nov 10 Analog Simulation for ExtractedRC.
Viterbi Decoder: Presentation #6 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 5: 23 rd Feb Component Simulation Design.
Noise Canceling in 1-D Data: Presentation #6 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 23 rd, 2005 Functional.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 5: Feb. 18 th Component Layout Overall Project Objective: Design an Air-Fuel.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 20 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Sep 29 Overall Project Objective : Dynamic Control.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: February 4 th 2004.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: 26 th January 2004.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage III: February 9 h 2004.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 06 Overall Project Objective : Dynamic Control.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Camera Auto Focus Presentation 6, February 28 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Sprinkler Buddy Presentation #9: “Layout and a New Feature” 4/4/2007 Team M3 Panchalam Ramanujan Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik.
Noise Canceling in 1-D Data: Presentation #4 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 14 th, 2005 Gate Level.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Sep 24 Overall Project Objective : Dynamic Control.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Mon. Nov. 24 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 15 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 06 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 11 Overall Project Objective : Dynamic Control.
Viterbi Decoder: Presentation #3 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
Virtual Wallet Gates Winkler Yin Shen Jordan Fei Project Manager: Prajna Shetty /02/2009 A handheld device that saves time and money through smart.
Group M1 - Enigma Machine Design Manager: Prateek Goenka Adithya Attawar (M1-1) Shilpi Chakrabarti (M1-2) Zavo Gabriel (M1-3) Mike Sokolsky (M1-4) Milestone.
Howd - Zur Hung Eric Lai Wei Jie Lee Yu - Chiang Lee Design Manager: Jonathan P. Lee [M2] Huffman Encoder Project Presentation #3 February 7 th, 2007 Overall.
Alpha Blending and Smoothing
Presentation transcript:

[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 05 Overall Project Objective : Dynamic Control The Traffic Lights

Status  Design Proposal  Chip Architecture  Behavioral Verilog Implementation  Size estimates  Floorplanning  Behavioral Verilog simulated  Gate Level Design  Component Layout/Simulation  Chip Layout  Complete Simulation

Data Input Initial Values Clock Operation T, Left-Turn Counter R, r, R_ L, r_ l Flow Control FSM Light Contro l FSM Selection

Old Version Wire routing on each block

Old Version.2

Current Version

16:1 MUX (11bits)

Data Input Routing

 We think the current layout of 16:1MUX (11bits) is not good enough.  Because of the Data Inputs Routing, it is very complex, now. (you can see the Data input routing picture)

 Maybe, we should refine the layout to this way. (16 inputs can pass thru single one 16:1 MUX,  Using the same metal for inputs (should be M3, Vertically. ) The overall size should be bigger than version_1, but it might decrease the complexity of global routing.  The floorplan would be a little bit different. 16:1 MUX X 11bits

Some Global Routing Issues  The outputs of Shift Registers are not fit the inputs of 2:1 MUX  It may waste some areas when we route the wires between this two blocks

Tom’s FSM  Large blocks LVS, but not too significant, because they don’t have too much interconnect  What is significant is wiring it all together  Floorplan done for wiring the whole FSM together  Inputs from bottom, outputs bottom or left

Tom’s FSM

Layout for Light Control FSM  All blocks are connected together and try to make them as compact as possible.  Need some time to do another layout for counter reset to fit in light control FSM.  DRC and LVS clean.

FSM Next State Fatter and shorter. Waste some area for routing but make the whole FSM more compact. Previous Updated Height:85.86um Width:6.48um Height:46.26um Width:17.28um

FSM TOP Revised layout for light control FSM. Height=68.94,Weight= Need some time to fit counter reset block into the FSM to make it more compact.

FSM TOP More detail in the layout. (Some additional lines are used for passing LVS) DRC and LVS clean. User defined inputs Global signals CLK,RESET etc. Inputs from previous FSM Outputs Combinational Part Sequential Part

Issue  Maybe I can use the counter reset block to fill the space to make it more compact. Need some time to modify it.  Maybe I should help others first before optimizing this FSM.

ALU Update  RCA Adder – 100%  DRC + LVS completed  Array Multiplier – 65%  Scrapped old one, too many wiring mistakes/missing many wire interconnects, seemed more efficient to work from scratch  What ’ s left?  A few more AND Gates connections to Full Adders  Only left enough room for 5-7 wires height wise … really need to get 12 wires(at worst) in there  Increasing Height => No, not going to double to height given Area is already close to initial estimate  Weird/Messy Wiring =>Yes, no otherway around it and it works  Attach HalfAdders+and to Array of Full adders+And  Bus wire around the array to inputs

RCA Adder(DRC + LVS Clean)

4xRow Full Adder(Array Mult) DRC=Clean LVS = Clean (minus AND Gates)

Close up on AND

Question ?