August 11, 2004SPEAR3 Chicane Lattice Review Lifetime and injection efficiency vs. Dynamic and physical aperture; Measurement & simulation.

Slides:



Advertisements
Similar presentations
Short bunches in SPEAR J. Safranek for the SPEAR3 accelerator group November 2, 20101J. Safranek CLS THz Workshop.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Injection System with a Booster in Separate Tunnel T. Shaftan for the NSLS-II team.
SESAME – TAC 2012: M. Attal Maher Attal SESAME Booster Characterization.
Ultra Low Vertical Emittance at the Australian Light Source Mark Boland on behalf of Rohan Dowd 1.
1 BROOKHAVEN SCIENCE ASSOCIATES Considerations for Nonlinear Beam Dynamics in NSLS-II lattice design Weiming Guo 05/26/08 Acknowledgement: J. Bengtsson.
Beam dynamics in IDsBeam-based Diagnostics, USPAS, June 23-27, 2003, J. Safranek Beam dynamics in insertion devices m Closed orbit perturbation m Linear.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Beamline 12 Project BL12 In-vacuum Undulator Source August 11, 2004 Andy Ringwall BL12 In-vacuum Undulator Source August 11, 2004 Andy Ringwall.
SPEAR3 Chicane, Accelerator Physics Update, February 10, 2005 Electron optics design review August 11, 2004 –“… no show stoppers. However, …” Additional.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Optimization of dynamic aperture for the ESRF upgrade Andrea Franchi on behalf of the ASD Beam Dynamics Group Workshop on Accelerator R&D for Ultimate.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Vacuum Issues from the Beam Dynamics Point of View Marc Muñoz.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
“Beam Losses” Christian Carli PSB H - Injection Review, 9 th November 2011 Several topics more or less related to beam losses, a study still somewhat at.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Lattice DSB (new version in progress) S. Guiducci Webex 8 February 2011.
DR 3.2 km Lattice Requirements Webex meeting 10 January 2011.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
Managed by UT-Battelle for the Department of Energy SNS Injection and Extraction Systems Issues and Solutions by M. Plum for the SNS team and our BNL collaborators.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Frequency Map Analysis Workshop 4/2/2004 Peter Kuske Refinements of the non-linear lattice model for the BESSY storage ring P. Kuske Linear Lattice My.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
ILC Damping Ring Alternative Lattice Design ( Modified FODO ) ** Yi-Peng Sun *,1,2, Jie Gao 1, Zhi-Yu Guo 2 Wei-Shi Wan 3 1 Institute of High Energy Physics,
E Levichev -- Dynamic Aperture of the SRFF Storage Ring Frontiers of Short Bunches in Storage Rings INFN-LNF, Frascati, 7-8 Nov 2005 DYNAMIC APERTURE OF.
02/04/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
1 EMMA Tracking Studies Shinji Machida ASTeC/CCLRC/RAL 4 January, ffag/machida_ ppt & pdf.
Frequency map analysis workshop - Orsay 1 - 2/04/04Mahdia Belgroune 1 Role of the frequency map analysis in the choice of the working point of SOLEIL M.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
PEP-X Ultra Low Emittance Storage Ring Design at SLAC Lattice Design and Optimization Min-Huey Wang SLAC National Accelerator Laboratory With contributions.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
CEPC Booster Zhang Chuang, Cui Xiaohao September 11,2015.
Damping Ring Specifications S. Guiducci ALCPG11, 20 March 2011.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Single particle dynamics in the ThomX ring Jianfeng zhang 12/02/2015 LAL.
Wakefield effect in ATF2 Kiyoshi Kubo
Plans for Diamond-II ESLSXX Workshop, Bessy II, 19 November 2012 R. Bartolini Diamond Light Source and John Adams Institute for Accelerator Science University.
Injection scheme for ultimate storage ring with double RF system Bocheng Jiang SSRF AP group SINAP. CAS LOWεRING 2014.
Status of the electron cloud test-bench in LSS5 G. Arduini SL/OP Crash programme in collaboration with LHC/VAC,SL/AP,SL/BI,SL/MR,SL/MS,SL/OP,…
Beam test of slow extraction from the ESR
Oleksiy Dolinskyy 1st December, 2014
Off-axis injection lattice design studies of HEPS storage ring
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Jim Crittenden CHESS Simulation Working Group 30 March 2015
Sextupole calibrations via measurements of off-energy orbit response matrix and high order dispersion Nicola Carmignani.
NSLS-II Lattice Design Strategies Weiming Guo 07/10/08
Cui Xiaohao, Zhang Chuang,Bian Tianjian January 12,2016
Proposal for a Transparent Off-Axis Injection Scheme for BESSY II
Low Emittance Tuning in CESR TA
Beam Injection and Extraction Scheme
Magnetic gap calculation
The new 7BA design of BAPS
R. Bartolini Diamond Light Source Ltd
Startup program, 1 Machine setup (i.e. R:\Controls\matlab\acceleratorcontrol\docs\SRSetupUsingMatlab_ALS.doc) Bergoz BPM/orbit checks: monbpms, correct.
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
Status of Low Emittance Tuning at CESR TA
SPEAR3 Lower Emittance & Nonlinear Dynamics
Compensating Parasitic Collisions using Electro-Magnetic Lenses
PEPX-type BAPS Lattice Design and Beam Dynamics Optimization
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Transfer Line for EIC.
First Look at Error Sensitivity in MEIC
DYNAMIC APERTURE OF JLEIC ELECTRON COLLIDER
Presentation transcript:

August 11, 2004SPEAR3 Chicane Lattice Review Lifetime and injection efficiency vs. Dynamic and physical aperture; Measurement & simulation

August 11, 2004SPEAR3 Chicane Lattice Review Touschek and brehmsstrahlung lifetime reduction For 0.04 % decrease in Bremsstrahlung lifetime decreases by 0.5 %; ~ln(  p/p). Touschek lifetime decreases by 4 %; ~(  p/p) 3. Bremsstrahlung & Touschek decreases by ~2 %.

August 11, 2004SPEAR3 Chicane Lattice Review Dynamic aperture simulations Baseline opticsChicane optics Plots show median over many error seeds.

August 11, 2004SPEAR3 Chicane Lattice Review Measured dynamic aperture Measured dynamic aperture better than median tracking on energy, and worse off energy.

August 11, 2004SPEAR3 Chicane Lattice Review Kicker calibration Simulations indicate injection efficiency should drop off, if beam is kicked ~1 mm closer to septum. Measurements show expected drop off. This indicates injection bump is indeed kicking beam to 22 mm (3 mm from septum). Kicker calibration from this measurement within 6% of design. Kickers are designed to kick the beam to 3 mm from septum chamber. Stored beam starts scraping if beam is pushed ~1 mm closer to septum. simulationmeasurement

August 11, 2004SPEAR3 Chicane Lattice Review Kicker calibration, 2 Decking, Portmann calibration. Kicker amplitude to loose stored beam on septum vs. septum closed orbit. Calibration within 5 % of previous method.

August 11, 2004SPEAR3 Chicane Lattice Review Measured energy aperture Lifetime vs. V gap 8 mA, single bunch –Touschek regime –  1/3 ~ rf acceptance 2 % energy aperture (agrees w/ measured dynamic aperture). ID gaps closed

August 11, 2004SPEAR3 Chicane Lattice Review Coulomb scattering; BL12 gap BL9 aperture scans –Lifetime vs. vertical orbit –Lifetime ~ constant over 4 mm –Systematic errors –Re-measure with scrapers, 11/2004 BL12 gap, conservative –12 – 2 = 10 mm at BL9 –Scales to 6.2 mm at BL12 BL12 gap, aggressive –12 – 4 = 8 mm at BL9 –Scales to 5.0 mm at BL12 Orbit bump at BL9 12 mm aperture.

August 11, 2004SPEAR3 Chicane Lattice Review Aperture scans, systematic errors Bump increases coupling (optimistic gap) –Included coupling correction in bump –Filled low current/bunch Bump degrades vacuum (pessimistic gap) –Lifetime vs. bump in other straights also drops off. –Scans with low current, turned off ion pumps Need scrapers

August 11, 2004SPEAR3 Chicane Lattice Review Aperture scans, conclusions BL9 gap from 12 mm to 10 mm very likely OK. –12 mm to 8 mm may be OK. –Further reduction not out of the question Aperture scans plagued with systematic errors. Scraper measurements this fall.

August 11, 2004SPEAR3 Chicane Lattice Review Dynamic aperture required for injection Baseline optics (IDs closed) 20 mm dynamic aperture should be more than enough for injection. Should still get good injection with a 5 mm reduction in dynamic aperture. septum magnet iron Stored beamInjected beam

August 11, 2004SPEAR3 Chicane Lattice Review Measured injection efficiency Simulate dynamic aperture reduction with closed orbit bump at septum. Efficiency decreases sooner than expected. –Poor control/understanding of BTS optics. –Optics distortion from bump. –Possible obstacle. Nonetheless, expected ~1 mm decrease in dynamic aperture is OK. Red = control study

August 11, 2004SPEAR3 Chicane Lattice Review Possible obstacle? septum magnet iron Mirror plate –Downstream of septum and phosphor screen –Upstream of window –Same x-section as septum –Last minute addition –Was not aligned

August 11, 2004SPEAR3 Chicane Lattice Review Injection with reduced y-aperture Tracking says not a problem. Measurement shows efficiency reduction. Need scraper! Injection rate vs. BL9 y-bump

August 11, 2004SPEAR3 Chicane Lattice Review Conclusions Chicane lattice dynamic aperture meets requirements –Sufficient for injection –Minimal reduction in beam lifetime Measurements show simulations (mostly) accurately predict optics performance BL12 gap –Expect small lifetime and injection reduction. –Needs further measurements with scraper.