Fatality (Friday 4 th May 2007 ) not recorded in ARUP Assessment of risk ‘Escape Route’ for traffic to Springfields Nuclear Facility to avoid delays due.

Slides:



Advertisements
Similar presentations
OR 42: County Line Curves Environmental Assessment Purpose and Need February 17, 2009.
Advertisements

Physical activity and the environment Implementing NICE guidance January 2008 NICE public health guidance 8.
DustScan Ltd Planning Consent for Mineral Works Oliver Puddle 25 September 2013.
Traffic and routing. Network Queueing Model Packets are buffered in egress queues waiting for serialization on line Link capacity is C bps Average packet.
Havant Retail Park Introduction Havant Retail Park is currently occupied by Homebase and AMF The site trades poorly and both are expected to vacate by.
Highways and Highway Components
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Chilterns Tunnel Vent Shafts
Neveen Shlayan PhD Student Transportation Research Center University of Nevada, Las Vegas.
Factors to Consider in Innovative Contracting Doyt Bolling and Jared Holland Utah Technology Transfer Center.
Lec 28: Ch3.(T&LD): Traffic Analysis – Traffic assignment Learn how to assign generated and distributed trips to the street system approaching the site.
> >
1 Statistics of Freeway Traffic. 2 Overview The Freeway Performance Measurement System (PeMS) Computer Lab Visualization of Traffic Dynamics Visualization.
Droitwich South Ward Meeting Yew Tree Development Community Hall 29 th June 2011 Facilitated by Cllr Richard Morris Neil Pearce, Development Manager Andrew.
Mass Fatality Management Guide for Healthcare Entities TRIAGE TAGS Based on the START system – S imple T riage A nd R apid T ransport Used by field personnel.
Optimization of Societal Risk in Tunnels Outline of the presentation Directives on minimum safety Risk analysis using BBN Societal risk optimization A.
GIS-based Routing of Hazardous Material Cargoes Considering Incident Cost after Accidental Release of Chemicals Bahareh Inanloo, Berrin Tansel and Xia.
The Bicycle Policy of Copenhagen Clean Air Conference Turin, 25 and 26 Octobre 2002 Thomas Krag Mobility and bicycle planning advice.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
Module 1 Introduction & Crashes and Safety MOT Training for Incident Responders in Florida.
Australian study tour Service d’études sur les transports, les routes et leurs aménagements Hervé GUIRAUD Division.
Road Crash and Victim Information System (RCVIS) Mr Panhavuth SEM RCVIS Manager Handicap International Belgium Cambodia 1.
HPV Route Assessment The South Australian Experience John Olson Managing Director HDS Australia Pty Ltd.
Triumphs on the Road to Quality Improvement Urology Service NRH Bernie Lee, Kelley Lennon & Eva Wallace.
2011/10/03 許志明 林意淳. Introduction to Lane-Position Detection Jun. 30, 2010 Lane-Position Detection Lane-Departure- Warning Systems Automated Vehicle- Control.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
Diversity Outreach Program Second Session Collaboration – The Key to Success September 24, 2014.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Logistics Workshop Summary Mike Headley August 19, 2015.
Work Zone Rule Virtual Workshop – Rule State of the Practice Overview.
CEMEX Open Discussion March 10, Outline Background Background Issue Issue Proposed Actions Proposed Actions.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Cork City  Corks transport management has developed dramatically over recent decades  It suffers from severe traffic congestion because of the number.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
Slower vehicle speeds (under 30 mph) means less severe crashes 90% reduction in fatalities, 76% reduction in injury crashes 75% fewer vehicle conflict.
ERCOT Change Management Trey Felton – ERCOT IT. 2 Change Management ERCOT Operating Procedure describes the required steps for initiating, tracking,
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Safety Data Initiatives in Reauthorization – What Can We Expect? Kathy Krause, FHWA Office of Safety 30 th Annual International Traffic Records Forum July.
Jim McCarthy.  Longmeadow is a town in Western Massachusetts. It has a population of about 16,000. The town was settled in 1644 and was originally farmland.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
A road to nowhere? Chris Todd Campaign for Better Transport.
June 13th, 2006 Henk Jansma (Advisor road safety) HGV lane Motorway A16 Evaluation study.
(c) International Road Transport Union (IRU) 2010 Attacks on International Drivers Joint ITF-IRU Survey th Symposium of Lawyers Geneva, 26 February.
Kensington and parts of west Kinsgford PAMP Workshop: 22 nd June 2010.
Pedestrian Facility Improvement Program
DIRECTOR, ROAD SAFETY ANALYSIS
Žilinská univerzita v Žiline Fakulta špeciálneho inžinierstva
HPV Route Assessment The South Australian Experience
County of Santa Barbara Coastal Resiliency Project Central Coast Sustainability Summit October 11, 2017 Selena Evilsizor, AICP County of Santa Barbara.
Florida LEL Program Traffic Safety Meeting December 2016
Work Zone Safety Review – District 1 - Duluth
This Christmas, you don’t Have to Be Stuck at Home
بسم الله الرحمن الرحيم قَالُوا سُبْحَانَكَ لا عِلْمَ لَنَا إلاَّ مَا عَلَّمْتَنَا إنَّكَ أَنتَ العَلِيمُ الحَكِيمُ صدق الله العظيم ( البقرة 32 )
A Sensor Location Decision Model for Truck Flow Measurement: Kyung (Kate) Hyun, UC Irvine Previous studies Goal Identifiability of ODs and routes (i.e.,
Tam O’Shanter Rezoning
47b. Fatal injuries at road construction sites, by major industry, total (All employment)
بسم الله الرحمن الرحیم.
Traffic Accidents caused by Lane Departure in Japan
LONDON NEW SOUTHGATE SUMMARY
Safe, Smooth, Sustainable Access Can we really have it all?
Map Analysis – Topic 5 Figures
Lesson 2 Risk Management Issues.
12. Network Analysis 12.1 Network dataset 12.2 Closest facility
Design Standards.
Recorder Visual Identification Test
32900 Pitcher Road, Springfield, Louisiana, Phone: (225) Fax: (225)
Parks Highway Reconstruction: Lucas Road to Big Lake Road
Capacity/Quality Improvement Project
Presentation transcript:

Fatality (Friday 4 th May 2007 ) not recorded in ARUP Assessment of risk ‘Escape Route’ for traffic to Springfields Nuclear Facility to avoid delays due to increased HGV trafic down Dagger Lane Treales Primary School ‘Escape Route’ for traffic to Preston to avoid delays due to increased HGV trafic down Dagger Lane (Roseacre Road is single track) Identification of Fatality Location and Additional Impact of Proposed Route on Treales Primary School and Surrounding Road Network not included in ARUP EA

Benzene