Precision Farming and the ISO 9001:2000 Traceability Requirements ISO 9001:2000 Clause 7.5.3 IDENTIFICATION AND TRACEABILITY Where appropriate, The organization.

Slides:



Advertisements
Similar presentations
IND 205 Audit Analysis of an Outcome
Advertisements

Effectively applying ISO9001:2000 clauses 6 and 7.
ISO 9001:2000 Documentation Requirements
Trace concepts & EMRS Fred Bourgeois EMRS National Coordinator Mark Schoenbaum Regional EPI.
DOCUMENTATION REQUIREMENTS Based on ISO 9001:2008
First Article Inspection Report
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
ISO Culture SHOQ Quiz 1. This program must be run in MS PowerPoint and requires sound. 2. Click “View” and then “Slide Show”. 3. Click “Continue”
Quality Objectives How Do We Measure Them? This training aid gives you an overview of how the VSE Quality Objectives are currently measured. To advance.
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
The ISO 9002 Quality Assurance Management System
Evolution of a Process Flow Diagram
Chapter 9 - Quality Systems Team #2: Cindy Guthrie, Amy Randolph and Robin Tomer.
QMS Documentation Click the mouse to advance slides and animations in this slide show…
TEMPUS ME-TEMPUS-JPHES
Technical Communication 1
Milan Janák Field Mapping Training Workshop, 13 – 17 June, 2011 Instructions for field inventory of species in Montenegro listed under Habitats Directive.
… putting the precision in ...
ISO 9000 and Total Quality: The Relationship Eng. Basel F. Qandeel.
Examine Quality Assurance/Quality Control Documentation
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
ISO 9000 Certification ISO 9001 and ISO
SAFETY AUDIT. 2.1 Definition of audit. Critical systematic inspection of an organization‘s activities in order to minimize losses due to accidents.
QMS Orientation Top Level Breakdown  This slide show gives you an overview of how the VSE Quality Management System (QMS) is organized and integrated.
4. Quality Management System (QMS)
The purpose of SOP is to describe the Performance of a controlled process and if it is written to fulfill only that purpose efficiently and effectively,
Training.
4. Quality Management System (QMS)
The Value of Using the Process Approach for Internal Auditing Frank Sidorowicz TL 9000 Program Director Orion Registrar, Inc.
1 Addendum Fall 2006 Limited-Term RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. September 11, 2006.
Company Confidential Registration Management Committee 1 AS9104/1 Certification Structures - Client and CB Agreement July 17, 2014 Tim Lee Chair - IAQG.
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
History of Production Agriculture
Good Hygiene Practices Module 2, Module 11 Recall and Traceability.
SYSTEM PLANNING Addendum FALL 2003 RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. October 2003 PLEASE.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Company Confidential Improvement Opportunities for Audit Reporting Tony Marino and Rick Downs July 19-20, 2012 Registration Management Committee RMC Workshop.
October SYS 1 Quality Audit and ISO9000 Quality Standard Kinnison, Chapter 17.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Non-conformity Reporting
a guidance to conversion
Purpose of audit is to provide assurance that: Procedures for attaining quality are such that, if followed, the intended quality will be obtained.
THIS PRESENTATION IS INTENDED AS ONE COMPLETE PRESENTATION. HOWEVER, IT IS DIVIDED INTO 3 PARTS IN ORDER TO FACILITATE EASIER DOWNLOADING AND VIEWING,
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
QUALITY MANAGEMENT STATEMENT
Group 6 Application GPS and GIS in agricultural field.
Exercise 1 Tor Stålhane IDI / NTNU. Intro The strength of ISO 9001 and many other standards is that they focus on “What shall be done” and leave “How.
FARMWORKS INTRODUCTION Carol Snyder INFORMATION MANAGEMENT WITH FARMWORKS.
QUALITY MANAGEMENT SYSTEM
ISO RECORDS. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Describe.
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
1 Addendum FALL 2004 RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. November 2004.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Workshop on Accreditation of Bodies Certifying Medical Devices Kiev, November 2014.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Final Draft International Standard IS0/FDIS 9001
ISO/IEC
Integrated Consulting Solutions
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Organic Integrity And Record Keeping.
TS Training Presented by: Internal Auditor Training.
ENTERGY SERVICES, INC. February 23, 2006
5.6 ICS Documentation Certain documents must be kept for each farmer and on ICS level (as detailed in the ICS Manual 5.6). These records are inspected.
ISO 9001 – 2008 Changes Summary of Changes
DRAFT ISO 10007:2017 Revision Overview Quality management – Guidelines for configuration management ISO/TC176 TG 01.
Presentation transcript:

Precision Farming and the ISO 9001:2000 Traceability Requirements ISO 9001:2000 Clause IDENTIFICATION AND TRACEABILITY Where appropriate, The organization shall identify the product by suitable means throughout product realization. The organization shall identify the product status with respect to monitoring and measurement requirements. Where traceability is a requirement, the organization shall control and record the unique identification of the product. Left-click mouse to advance slide show

Planter Data: Field Polygons, defined by GPS Co- ordinates, based on crop/variety planted Assign a unique ID to each polygon (field unit). Crop Management Data (e.g., sprayer): GPS coordinates generate polygons for different treatments Use polygon ID (from planter data) to identify treatment for a specific crop/variety. Left-click mouse to advance slide show

Left-click mouse to advance slide show Planter Data: Field Polygons, defined by GPS Co- ordinates, based on crop/variety planted Harvest Data (e.g., Yield Map): Use the same polygon ID to obtain harvest data

1.Polygon IDs can be used to identify separate field units based on crop, variety, separate contracts, etc. 2.Use IDs that describe your fields in both space and time, as this will change from one cropping season to the next. For example, may be used to indicate polygon 004 from the planter map, while 2004 indicates the crop year. 3.Consistently use these IDs, and their GPS coordinates, to select crop management and harvest information from other precision farming data sets. 4.Hmmm… How will you continue to trace the product once it has left the field polygon??? Left-click mouse to advance slide show

? ? Truck A = ? Silo #1 = ? Truck B =? ? Customer’s contract Match? Is it really from ? To the customer Traceability Trail Left-click mouse to advance slide show

1.It is up to you! 2.You need to define your traceability procedures and data/record organization. 3.Documentation regarding your traceability system may be required to control this process! (i.e., written procedures, work instructions, etc.) 4.Test your traceability system. You should be able to identify all of your products (and what has been done to then so far) at any place/time on the farm. 5.Evaluate your method for demonstrating this system to customers and auditors. Keep it as simple and clear as possible. End of slide show