Frank Hartmann 10.04.03 Module Construction Meeting1 Analysis on TEC Expressline II modules Two different topics: Strip defects (3 modules) Global IV (2.

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik1 Organigram of the CMS hardware group in Karlsruhe Sensor quality test Frank Hartmann Stefanie.
January 22, Run IIB Silicon workshop Purdue University Bortoletto Daniela, Bolla Gino, Canepa Anadi Hamamatsu testing I-V characteristics up to 1000V.
Frank Hartmann IEKP TEC Meeting July 03 Ring 6 mechanical Qualification In a nutshell: rel. precision agreement (Aa-Ka): 3-5µm (  rot.) abs precision.
Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) QTC Instruments: HP4274A (LCR), K6517 (electrometer), HP6614C (voltage supply), K595 (quasistatic.
128 September, 2005 Silicon Sensor for the CMS Tracker The Silicon Sensors for the Inner Tracker of CMS CMS Tracker and it‘s Silicon Strip Sensors Radiation.
Sensor meetingF. Hartmann 1 Status report St & HPK plus add. Scratch tests. IEKP – University of Karlsruhe Frank Hartmann.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
Workshop on CMS irradiation sensor Qualification&Assurance 1 Final set of measurement for the irradiation quality assurance. What test do we need? EFFICIENT.
Sensor meetingA. Furgeri 1 Status report IEKP – University of Karlsruhe Alexander Furgeri.
6/22/2015Tracker Week April 2002IEKP 1 Summary of IQC-workshop IEKP - Universität Karlsruhe (TH)
General Tracker meetingA. Furgeri 1 Irradiation results and Annealing scenarios for HPK IEKP – University of Karlsruhe Alexander Furgeri
1 Hybrid & Module Testing Status Week of 6/6-6/10.
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
Test Results Highlighted Material Batches tested 6WA –263(1) 230(1) 265(2) 272(1) 273(3) (3) 305(1) (6) (2) 6WB –278(1) 279(9) 282.
Manuel FahrerCMS Week TB Meeting /6 1-Shot Test Beam CERN CMS: M.Huhtinen, R.Hammarstrom, A.Macpherson CERN ATLAS, PS, Karlsruhe CMS  Overview.
DPG 2001 Frank Hartmann (IEKP) P-irradiated-oxygenated Non-irradiated-oxygenated Non-irradiated-non-oxygenated P-irradiated-non-oxygenated sensors put.
First Proton Irradiation of CMS Sensors W. de Boer, A. Dierlamm, A. Furgeri, E. Grigoriev, F. Hartmann, F. Hauler, L. Jungermann, Ch. Piasecki.
CDF sensors processed on 6” wafers OUTLINE: zMaterial description zMasks layout zSensor performances zProcess related problems zConclusions DPG Frühjahrstagung.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
Sensor meetingA. Furgeri 1 Status report IEKP – University of Karlsruhe Alexander Furgeri.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Frank Hartmann --- Karlsruhe 2 nd bond test 2nd bond test pieces received from institutes sent in their 2nbond sample Torino, Wien, Karlsruhe, FNAL,
October 2001General Tracker Meeting IEKP - Universität Karlsruhe (TH) 1 Results on proton irradiation tests in Karlsruhe F. Hartmann IEKP - Universität.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Dahee Kim (Ewha womans university) for MPC-EX collaboration TEST OF MINI-PAD SILICON SENSOR FOR PHENIX MPC-EX.
Guido_Tonelli _Tracker_Week_April_21_ ORIGIN OF THE CMN IN TOB/TEC MODULES A PLAUSIBLE EXPLANATION BASED ON MEASUREMENTS PERFORMED ON 1 (AND ONLY.
Frank Lehner U Zurich Characterization of inner layer sensors DØ Inner Layer Sensor Production Readiness Review FNAL, 8/8/2003 M. Demarteau, R. Demina,
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
Full-size ATLAS Sensor Testing On behalf of the ATLAS R&D group Development of n-in-p Silicon Sensors for very high radiation environment Jan Bohm Institute.
Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University.
Quality Test of L1 sensors HPK 10 sensors –Tested all, 6 sent to Fermilab – Test structures, HPK 133 L00 CDF ELMA 9 sensors –Tested 6 of 9.
P. Riedler- GGT Meeting 3/4/20061 Status of Sensor Irradiation and Bump Bonding P. Riedler, G. Stefanini P. Dalpiaz, M. Fiorini, F. Petrucci.
QA Workshop at CERN 3-4 November Hamamatsu silicon detectors for high energy physics experiments Kazuhisa Yamamura*, Shintaro Kamada.
Examples and disciptions for measurements On pixel and strip sensors.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Minni Singla & Sudeep Chatterji Goethe University, Frankfurt Development of radiation hard silicon microstrip detectors for the CBM experiment Special.
Testing Site Qualification Purpose: –Perform detailed scans of the silicon microstrips to make sure they all work. –Check HPK. Candidates for Certification:
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Paul Dolejschi Progress of Interstrip Measurements on DSSDs SVD.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
Strasbourg status Ring 7 pilot run François Didierjean.
Central European Consortium R&D of Central European Consortium (CEC) Status & Plans (Sensor Technology) Georg Steinbrück, Hamburg University Aachen DESY.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Paul Dolejschi Characterisation of DSSD interstrip parameters BELLE II SVD-PXD Meeting.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
Karlsruhe probe equipment and QA proposals/expertise
Pilot run – matrix measurements after first metal
Status of PQC Florence, Strasbourg, Vienna
Unexpected Failures of Modules on Rods
Recent TOB Developments
Module Failures on RODs
Module Failures on RODs
Module Production Status in Florence
Module production in Italy
Noise in TOB modules and sensor quality
Sensor probing (Summary)
Passitivation Location
Module Testing in Florence Carlo Civinini INFN-Florence
Noise in TOB modules and sensor quality
Isolated Bad-CAC Strip at UCSB
Hybrid & Module Testing Status
Module Failures on Rods
Hybrid & Module Testing Status
Hybrid & Module Testing Status
On this basis, a new geometry with silicon short strip sensors (strixels) is proposed. In order to understand the behaviour of such devices, test geometries.
IEKP - Universität Karlsruhe (TH)
Lateral Marks with ESS A test version is available in since the end of September. Several laboratories.
Presentation transcript:

Frank Hartmann Module Construction Meeting1 Analysis on TEC Expressline II modules Two different topics: Strip defects (3 modules) Global IV (2 modules)

Frank Hartmann Module Construction Meeting Good & Bad news: Add. Pinholes No problem due to bonding! 3 (+2 later) additional pinholes were reported by Aachen wrt QTC in Vienna! Investigated in KA with QTC and DAQ! 1. 3 pinholes were related to deep scratches! 2. 1 burn!?! 3. 1 misstag Module 644 strip 358 Reported add. pinhole!

Frank Hartmann Module Construction Meeting Scratches: sensor defects (mod 642) Strip 330: pinhole Strip 328: leaky 1 Scratch from strip 327 to 331 produced 2 different defects! Module 642 strip 329,330,331

Frank Hartmann Module Construction Meeting Module strip scan on module Coupling capacitances: all in specs strip 330  pinhole Rpoly: all in specs NB. Strip 1 reported as a pinhole: 1.is dubious in the DAQ, but not clearly identifiable as pinhole! 2.shows no damage! 3.is no pinhole according to the Idiel measurement at QTC!

Frank Hartmann Module Construction Meeting Mod 643 add pinholes between DEC02 to JAN03 Strip 221 Strip 511 More on this one later This happened somewhere after the first module tests!

Frank Hartmann Module Construction Meeting IV

Frank Hartmann Module Construction Meeting IV problems reported by Aachen For a “good” IV evaluation (with a dubious first one) one should take at least fast 2-3 IV ramps OR ramp up – wait – IV during ramp down. The stepping of 100V done in Aachen was not suited for full modules (there’s a chance for higher values)  Module 642 is fine (more on this)  (mod 503 fine up to ~500V, then fast increase to ~10µA to be investigated).  Module 643: early breakdown at V (more on this one)

Frank Hartmann Module Construction Meeting Module 642 High IV + early soft breakdown Slight but non-critical increase in IV! Compare to the 40µA limit! Initial current decrease with time! Known IV behaviour of sensors! 4µA 2µA

Frank Hartmann Module Construction Meeting Mod 643 High IV + early soft breakdown

Frank Hartmann Module Construction Meeting IV reported by Aachen Mod 643 First IV is fine! ´What happened?

Frank Hartmann Module Construction Meeting Module 643 (history) Full module shows high global IV Optical inspection showed possible candidates for the high IV, –NO candidates on the edges –NO; on the visible part of the backplane. –Yes; on strip level –Yes; on bias / guard region Strip scan (leakage current) on W6A (on module) show nominal currents (W6B not accessible)  Removal of bonds (for further deep investigation on indiv. Sensors.)

Frank Hartmann Module Construction Meeting Module 643 history (cont.) IV on W6A is ok, IV on W6B shows early breakdown as full module! Cleaning improved the current but did not solve the problem: –A) Isoprop, B) isoprob plus tissue, ( C) ultrasonic bath ) Strip scans (leakage current) on both sensors show nominal currents!   IV problem is NOT located in the strip region!  Remaining defect location: Backside, Guard-, Bias, n++ -region!  Removal of W6B with a scalpel  no further increase in IV!  NO visible breaks on the backplane (add. inspection on the edges)  Remaining defect location: Guard-, Bias, n++ -region!

Frank Hartmann Module Construction Meeting IV on module 643  Closer investigation on W6B SENSOR Starting assumption: 1. indiv. strip failure as seen on sensors 2. backplane cracks/chips 3. guard scratches 4. bias scratches 5. contact of guard and n++

Frank Hartmann Module Construction Meeting Module 643 Strip leakage current Individual strip currents are as expected for HPK (very low)! Other strip parameters checked for are in specs! Sum of individual currents is way below the total current! (Nominal values)

Frank Hartmann Module Construction Meeting Backside – not critical Non critical scratches on the backside compare with scratch tests on the backside and scalpel scratches (during removal), which did not increase the current. Exististing scratch Non-destructive test on mini sensor Scalpel wounds during removal  Non-destructive! Scratches on the back are probably not critical.

Frank Hartmann Module Construction Meeting Scratch on n++,guard and bias Scratch exists before end of bonding! Possible defect candidate: Metal overhang defect!

Frank Hartmann Module Construction Meeting Scratch test on bias & guard (minisensor) Artifical: Metaloverhang defect

Frank Hartmann Module Construction Meeting Preliminary field simulations (with ISE TCAD)

Frank Hartmann Module Construction Meeting Module 643 (strange) On strip On n++ Possible defect candidate: Short: n++ and guard Most probable candidate!

Frank Hartmann Module Construction Meeting IV with “shorts” in the outer sensor areas

Frank Hartmann Module Construction Meeting Repair of module 643 Repair is feasible but not applicable as standard procedure! Not fully bonded yet.

Frank Hartmann Module Construction Meeting x3 x 70 Total current Single strip current GENERAL: Global IV and Individual strip IV (sensors) Scratches on QTC level! (e.g. from company or artificial)

Frank Hartmann Module Construction Meeting General comment on scratches! During Assymbly, Bonding, Testing DO NOT SCRATCH SENSORS / DO NOT POLLUTE THEM!! –especially not the guardring ! –especially not the strips ! –do not break the edges ! –do not break any border line ! SMALL SUPERFICIAL scratches are enough to change sensor/module characteristics! 1.Local & global HIGH increase of current 2.Add shorts, breaks, pinholes! Contrary to older experiments: The high voltage sensor design is good but vulnerable to scratches! Pollution: Use Facemasks everywhere working with open sensors/modules!

Frank Hartmann Module Construction Meeting W5 prototype production (manual)

Frank Hartmann Module Construction Meeting IV on W5