Doc.: IEEE 802.11-15/0699r0 Submission May 2015 Jonathan Segev (Intel Corporation)Slide 1 NGP SG May 2015 Closing Report Date: 2015-05-15 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0520r0 Submission Apr Jonathan Segev (Intel)Slide 1 NGP SG Apr. 15 th Telecon Agenda Date: Authors:
Advertisements

March 2015doc.: IEEE /0471r0 SubmissionDonald Eastlake, Huawei TechnologiesSlide 1 TGak March Closing Report Date: Authors:
Doc.: IEEE /0217r2 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG March 2015 Agenda Date: Authors:
Doc.: IEEE /0217r0 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG March 2015 Agenda Date: Authors:
Doc.: IEEE /0242r2 Submission March 2015 Jonathan Segev (Intel)Slide 1 NGP SG January Agenda Date: Authors:
Doc.: IEEE /1561r3 Submission Jan Jonathan Segev (Intel)Slide 1 NGP SG January Agenda Date: Authors:
Doc.: IEEE /1561r1 Submission November 2014 Jonathan Segev (Intel)Slide 1 NGP SG January 2015 Agenda Date: Authors:
Next Generation Positioning Project Proposal
Doc.: IEEE /01552r1 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Agenda Date: Authors:
Doc.: IEEE /01552r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Agenda Date: Authors:
Doc.: IEEE /0095r18 Report Feb 2015 Adrian Stephens, Intel CorporationSlide REVmc Editor’s Report – Feb 2015 Date: Authors:
Doc.: IEEE /1514r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Closing Report Date: Authors:
Doc.: IEEE /0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: Authors:
Doc.: IEEE /1301r0 Submission September 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG September 2014 Closing Report Date: Authors:
Doc.: IEEE /0015r0 Submission January January 2015 WG Motions Date: Authors: Dorothy Stanley, Aruba Networks.
Doc.: IEEE /01313r5 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Agenda Date: Authors:
Doc.: IEEE /0747r7 Submission July July 2015 WG Motions Date: Authors: Dorothy Stanley, HP-Aruba NetworksSlide 1.
Doc.: IEEE /1227r0 Submission Nov 2012 Adrian Stephens, Intel CorporationSlide Sept 2012 Motions Date: Authors:
Doc.: IEEE /0499r4 Submission May 2015 Jonathan Segev (Intel)Slide 1 NGP SG May Agenda Date: Authors:
Doc.: IEEE /0217r9 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG March 2015 Agenda Date: Authors:
Doc.: IEEE /01552r5 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Agenda Date: Authors:
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /0616r2 Submission May 2013 Phillip Barber (Huawei Technologies)Slide 1 HEW Project Plan Discussion Date: Authors:
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
July 2015doc.: IEEE /0954r0 SubmissionDonald Eastlake, Huawei TechnologiesSlide 1 TGak July Closing Report Date: Authors:
Submission doc.: IEEE /1003r0 NGP SG Sep. Agenda Date: Slide 1Jonathan Segev, Intel Corporation Sep Authors:
Doc.: IEEE /01541r0 Submission November 2014 Jonathan Segev (Intel)Slide 1 NGP SG January 2015 Agenda Date: Authors:
Doc.: IEEE /1269r1 Submission aa – Robust Audio Video Transport Streaming Atlanta Closing Report Date: Authors: Nov 2009 Ganesh.
Doc.: IEEE /0333r1 Submission May 2014 TGaj Editor Report Jiamin Chen, HuaweiSlide 1 Date: Author:
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Doc.: IEEE /0499r0 Submission May 2015 Jonathan Segev (Intel)Slide 1 NGP SG January Agenda Date: Authors:
Doc.: IEEE /0616r0 Submission May 2013 Phillip Barber (Huawei Technologies)Slide 1 HEW Project Plan Discussion Date: Authors:
TGaz Next Generation Positioning Mar Closing Report
IEEE TGa Project Timeline
NG60 SG March 2015 Agenda Date: Authors: March 2015
802.11REVmd Editor’s Report – April 2018
VHT SG September 2008 Closing Report
May 2013 doc.: IEEE /xxxxr0 January 2015 Motion #8: PAR
<month year> doc.: IEEE < e> <January 2018>
Next Generation Positioning Project Proposal
802.11REVmd Editor’s Report – July 2018
Light Communications Study Group March 2018 Closing Report
802.11REVmc Editor’s Report – May 2014
JTC1 Ad Hoc January 2009 Closing Report
802.11REVmc Editor’s Report – Nov 2014
VHT SG July 2008 Closing Report
802.11REVmc Editor’s Report – Feb 2015
Wake-up Radio (WUR) SG November 2016 Closing Report
<month year> doc.: IEEE < e> <January 2018>
802.11REVmc Editor’s Report – Sept 2014
VHT SG November 2008 Closing Report
IEEE SGa Project Timeline
TGad March 2011 Closing Report
VHT SG January 2008 Closing Report
S1G Closing Report – May 2010 Date: Authors: May 2010
802.11REVmd Editor’s Report – May 2018
VHT SG March 2008 Closing Report
Wake-up Radio (WUR) SG July 2016 Closing Report
NGP SG January 2015 Agenda Date: Authors: Jan. 2015
DLS SG Closing Report Date: Authors: March 2007 Month Year
TGad January 2009 Closing Report
IEEE LRLP TIG Long Range Low Power January 2016 Closing Report
EHT SG formation Motion
Task Group BA - January 2017 Since the last (November) F2F meeting
ISG SG Closing Report Date: Authors: January 2012
PAR Extension Motions Date: Authors: July 2016 Name Company
EHT SG formation Motion
BCS SG Closing Report Date: Authors: September 2018
TGaz Next Generation Positioning Jan Closing Report
Presentation transcript:

doc.: IEEE /0699r0 Submission May 2015 Jonathan Segev (Intel Corporation)Slide 1 NGP SG May 2015 Closing Report Date: Authors:

doc.: IEEE /0699r0 SubmissionSlide 2 Abstract This document is the NGP SG short overview as of May Jonathan Segev (Intel Corporation) May 2015

doc.: IEEE /0699r0 Submission NGP SG – May 2015 Status: –Group met for three sessions now. –SG has approved a motion for PAR and CSD for WG review and approval to submit to EC. –Main goals met this meeting: PAR and CSD approval. Continued development of use case document. Continued review of technical material. Supporting material: NG Positioning Overview and Challenges Beyond Indoor Navigation Scalable location Simulation results on AoA accuracy in 2.4/5GHz bands May 2015 Jonathan Segev, Intel CorporationSlide 3

doc.: IEEE /0699r0 SubmissionSlide 4 May 2015 Jonathan Segev (Intel) Study Group Timeline MonthMilestone / Plan of Action January (i)Formation meeting Initial discussion on PAR and CSD Presentations on use cases, usage models. March (p)Continue discussion on PAR and CSD Discussion supporting presentations. Study Group extension May (i)SG Final version of PAR and CSD Discussion on supporting presentations Working Group Approval on PAR and CSD PAR circulated amongst other WGs. July (p)Presentations. Resolve EC feedback on PAR and CSD. Executive Committee Approval on PAR and CSD Study Group extension July (i)NesCom Approval on PAR and CSD Sep. (targeted)Task Group formation meeting

doc.: IEEE /0699r0 Submission What’s next then? Some of the usages NGP SG explores: Micro geo-fencing moving from <1m to <0.1m. Direction finding. Improving scalability and reducing overhead. Slide 5 Nov Jonathan Segev, Intel * /01 – Beyond Indoor Navigation by Jonathan Segev, Carlos Aldana et-al /r0 – Scalable Location by Brian Hart, Peter Thornycroft and Mark Rison /r0 – Direction Finding Positioning by James Wang, Gabor Bajko et-al High Accuracy Positioning

doc.: IEEE /0699r0 Submission January 2015 Donald Eastlake, Huawei TechnologiesSlide 6