March 2015doc.: IEEE 802.11-15/0471r0 SubmissionDonald Eastlake, Huawei TechnologiesSlide 1 TGak March Closing Report Date: 2015-03-12 Authors:

Slides:



Advertisements
Similar presentations
Submission doc.: IEEE 11-13/1230r1 September 2013 Donald Eastlake, Huawei TechnologiesSlide 1 TGak September Closing Report Date: Authors: NameAddressAffiliationsPhone .
Advertisements

Doc.: IEEE /0348r0 Submission March 2015 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 Proposed Tiger Team actions Date: Authors:
Doc.: IEEE P /0498r1 Submission May 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 May ak Agenda Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
March 2015 Agenda doc.: IEEE /0234r2 Mark Hamilton, Spectralink Corp.Slide 1 ARC-agenda-mar-2015 Date: Authors:
May 2015doc.: IEEE /0670r1 SubmissionSlide 1Mark Hamilton, Ruckus Wireless ARC Closing Report Date: Authors:
Doc.: IEEE P /1504r3 Submission January 2014 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 January ak Agenda Date: Authors:
Doc.: IEEE /0925r0 Submission July 2008 John Doe, Some CompanySlide 1 July 2008 Closing Report Date: Authors:
Doc.: IEEE P /0982r5 Agenda September 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 September ak Agenda Date: Authors:
Doc.: IEEE /1444r4 Submission Jan 2013 Adrian Stephens, Intel CorporationSlide Jan 2013 Motions Date: Authors:
Doc.: IEEE P /0982r0 Submission September 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 September ak Agenda Date:
Doc.: IEEE P /1589r4 Submission January 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 January ak Agenda Date: Authors:
Doc.: IEEE P /187r1 Submission January 2009 Donald Eastlake 3rd, MotorolaSlide 1 TGs Los Angeles Closing Report Date: Authors:
January 2015doc.: IEEE /1524r0 SubmissionMark Hamilton, Spectralink, Corp.Slide 1 ARC Closing Report Date: Authors:
Doc.: IEEE P /0734r3 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 July ak Agenda Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE P /1320r6 Submission November 2014 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 November ak Agenda Date: Authors:
Doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 July ak Agenda Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE P /1220r1 Agenda November 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 November ak Agenda Date: Authors:
Doc.: IEEE P /0792r1 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 July ak Ad Hoc Date: Authors: NameAffiliationsAddressPhone .
July 2015doc.: IEEE /0954r0 SubmissionDonald Eastlake, Huawei TechnologiesSlide 1 TGak July Closing Report Date: Authors:
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: IEEE P /0498r10 Submission May 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 May ak Agenda Date: Authors: NameAffiliationsAddressPhone .
November 2015doc.: IEEE /1451r0 SubmissionDonald Eastlake, Huawei TechnologiesSlide 1 TGak November Closing Report Date: Authors:
January 2015 Agenda doc.: IEEE /0234r0 Mark Hamilton, Spectralink Corp.Slide 1 ARC-agenda-mar-2015 Date: Authors:
Submission doc.: IEEE 11-13/0148r1 January 2013 Donald Eastlake, Huawei TechnologiesSlide 1 TGak January Closing Report Date: Authors: NameAddressAffiliationsPhone .
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
March 2015doc.: IEEE /0469r1 SubmissionMark Hamilton, Spectralink, Corp.Slide 1 ARC Closing Report Date: Authors:
Doc.: IEEE /1528r2 Submission January January 2016 WG Motions Date: Authors: Dorothy Stanley (HPE)Slide 1.
Doc.: IEEE /1528r1 Submission January January 2016 WG Motions Date: Authors: Dorothy Stanley (HPE)Slide 1.
Doc.: IEEE /1404r1 Submission aa – Robust Audio Video Transport Streaming Los Angeles, CA Opening Report Date: Authors: Nov 2010.
Doc.: IEEE /0077r1 Submission May 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for May 2013 Notice: This document has been prepared to assist.
Doc.: IEEE P /0229r7 Agenda March 2016 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 March ak Agenda Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0382r0 Submission IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone Hiroshi MANOAlliedtelesis R&D.
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
Doc.: IEEE /1444r1 Submission Jan 2013 Adrian Stephens, Intel CorporationSlide Jan 2013 Motions Date: Authors:
Jan 2013 Motions Date: Authors: Jan 2013 May 2006
155 Beaver Street, Milford, MA USA
November ak Agenda Authors: November 2017 Date:
January ak Agenda Authors: January 2015 Date:
TGaf Waikoloa Closing Report
TGs San Diego Closing Report
November ak Agenda Authors: November 2017 Date:
TGs Atlanta Closing Report
TGs Waikoloa Closing Report
JTC1 Ad Hoc January 2009 Closing Report
January ak Agenda Authors: January 2015 Date:
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
TGaf San Antonio Closing Report
TGaf Waikoloa Closing Report
November ak Agenda Authors: November 2017 Date:
TGu Motions Authors: March 2010 Date: March 2010
TGu Teleconference Motions
TGak November Closing Report
July 2011 Closing Plenary Motions
TGm Closing Report – May 2010
2019 March TGba Closing Report
July 2009 Closing Plenary Motions
TGaf Orlando Closing Report
TGae Closing Report – January 2011
TGu Motions Authors: March 2010 Date: March 2010
May 2008 Closing Plenary Motions
TGs Taipei Closing Report
TGs San Diego Closing Report
IEEE aj May Closing Report
TGak January Closing Report
TGaq Closing Report Date: Authors: March 2015 March 2015
Presentation transcript:

March 2015doc.: IEEE /0471r0 SubmissionDonald Eastlake, Huawei TechnologiesSlide 1 TGak March Closing Report Date: Authors:

March 2015doc.: IEEE /0471r0 Submission Abstract Closing Report of IEEE Task Group AK at the IEEE Meeting, March 2015, held in Berlin, Germany. Donald Eastlake, Huawei TechnologiesSlide 2

March 2015doc.: IEEE /0471r0 SubmissionSlide 3 TGak Closing Report Accomplishments Received and discussed the submissions listed on the next page. Resolved all remaining comments. Motion passed in TGak to direct the Editor to produce D1.0 go to Letter Ballot. Met jointly with 802.1Qbz and ARC SC Thursday AM1. An annotated agenda is in 11-15/0237r11. Donald Eastlake, Huawei Technologies

March 2015doc.: IEEE /0471r0 SubmissionSlide 4 TGak Closing Report Submissions 11-15/116, “Assorted 11ak Improvements” Donald Eastlake (Huawei) 11-15/283, “An adaptation of GCR for GLK links” Ganesh Venkatesan (Intel) 11-15/150, “GCR using SYNRA for GLK” Ganesh Venkatesan (Intel) 11-15/415, “Clause 5 proposed changes” Mark Hamilton (SpectraLink) 11-15/0454r0, “Some more DS architecture concepts” Mark Hamilton (SpectraLink) 11-15/462r1, “Clause 5 Changes for EPD” Mark Hamilton Donald Eastlake, Huawei Technologies

March 2015doc.: IEEE /0471r0 SubmissionSlide 5 TGak Closing Report M otion: Having approved changes to P802.11ak_D0.07, as specified in /237r9, Instruct the Editor to prepare a P802.11ak_D1.0 incorporating the changes, and Approve a 30 day Working Group Technical Letter Ballot asking the question “Should P802.11ak_D1.0 be forwarded to Sponsor Ballot?” –Mover: Mark Hamilton Seconder: Richard Roy –Yes: 5 No: 0 Abstain: 0 Donald Eastlake, Huawei Technologies

March 2015doc.: IEEE /0471r0 SubmissionSlide 6 TGak Closing Report Teleconferences Decided to hold 1 hour teleconferences, to be joint with 802.1Qbz, on Monday, April 6 th, April 27 th, and May 4 th, all at 11am Eastern US time. May 2015 Plans Resolve comments from Letter Ballot or, if the WG does not approve LB, improve the draft. Joint meeting with ARC. Donald Eastlake, Huawei Technologies