MPE, 4th of May 2006 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 4th of May 2006.

Slides:



Advertisements
Similar presentations
XMM XMM-NEWTON TTD Meeting: 8 April OPS-OAX (J. Martin) Autocommanding J.Martin, XMM-Newton SOE.
Advertisements

January 6. January 7 January 8 January 9 January 10.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.
M. Kirsch, XMM-Newton European Space Operations Center Page 1 ESOCESOC XMM Operations Marcus G. F. Kirsch with Inputs from the Flight Control Team at ESOC.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting November 6, 2007, Mallorca María Santos-Lleó (XMM-Newton Science Support.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group MPE, 4 th.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
XMM-Newton Status of EPIC Operations Guillermo Buenadicha & Pedro Calderón Mallorca 8-April-2008.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing.
XMM-Newton 1SCI-SA Populating the CCF Immediate needs are driven by the requirement to test the SAS over the summer before public release. (A release called.
XMM-Newton 1 M.Stuhlinger/P.Calderon, ESAC Re-appearance of the MOS1 CCD1 meteorite column during revs Madrid, 23. March 2010.
XMM-Newton 1SCI-SA Status of MOS and PN Realtime Operations 1) Current Operations Status 2) Eclipse preparation improvements 3) Slew Exposures 4) Offset.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
XMM 1 MOS2 CCD5 anomaly Status of the investigations.
I. de la Calle Astronomy Science Operations Division Science Operations Department Background Working Group Meeting, Mallorca – 30/03/2009 XMM-Newton ESAC.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Status of EPIC time jump problems Marcus.
Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Pedro Calderón Riaño Guillermo Buenadicha.
1 XMM-Newton Extended Source Analysis Software Steve Snowden & Kip Kuntz  Publicly Released 5 April 2006  XMM-Newton Extended Source Analysis Software.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Cross calibration PKS
Slews: Fast and Slow. Fast Slew Status  XMMSL1: catalogue of slew sources released May 2006 Revs , 5180 detections, 2692 Revs , 5180 detections,
7 January 2005MDI Workshop M. Breidenbach1 SLD VXD3 Pickup Experience.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting Mallorca, Spain 26-27/10/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded.
Tony Abbey XMM Cal/Ops meeting – MPE, Garching – 5 May 2006 Tony Abbey – University of Leicester Reducing MOS data rate.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group Palma de.
Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.
Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Martin Stuhlinger X-Ray Universe 2005, Sep.26-30, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
Figure Figure 18-1 part 1 Figure 18-1 part 2.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha PALERMO 11/04/07.
XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.
Guillermo Buenadicha / Neil Cheek SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha Neil Cheek MALLORCA 26/10/2006.
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting MPE, Germany 04-05/05/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded (~1.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010.
XMM-Newton EPIC OCB, 6-Nov-2007 EPIC OCB, 6-Nov XMM-Newton Future Instrument Operations Mallorca, 6 th -7 th November 2007 M. Casale, J.R. Muñoz.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
PACS IBDR 27/28 Feb 2002 PACS Data Flow1 PACS Data Flow, Instrument Modes and Operations Helmut Feuchtgruber MPE.
Torsten Böker TIPS May 2, 2002 NICMOS post-cooldown detector performance 1) SMOV status 2) Dark current 3) Quantum efficiency 4) “First light”, focus and.
SS Space Science MO&DA Programs - August Page 1 ACE Instrument Status Report Cosmic Ray Isotope Spectrometer (CRIS) Normal Operation. Electron Proton.
LEADS/EMS DATA VALIDATION IPS MeteoStar December 11, 2006 WHAT IS VALIDATION? From The Dictionary: 1a. To Make Legally Valid 1b. To Grant Official.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
M. Pilar Esquej, XMM-Newton European Space Astronomy Centre Page 1 Status of the XMM-Newton Slew Survey P. Esquej, R. Saxton, B. Altieri, A. Read, M. Freyberg,
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
1 EOS Aqua Mission Status at AMSR Science Team Meeting September 16, 2015 Huntsville, Alabama Bill Guit Aqua/Aura Mission Director - Code 584 phone
STIS STATUS Charles Proffitt TIPs May 21, STIS Status - Status of Repair Results of FT Amp B Bias Anomaly Changes to SMOV Plan.
NICMOS Suspend Event STB 632 “MECH_2_MAX_RETRIES_EXCEEDED” 2008/069.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
Date of download: 6/2/2016 Copyright © 2016 SPIE. All rights reserved. View of the XMM-Newton spacecraft subsystems, with external shrouds and structure.
1 Computer Based Procedure(CBP) System 백승민.
C osmic R Ay T elescope for the E ffects of R adiation 27 June 2005 Digital Engineering Digital Sub-System Bob Goeke.
SQL Database Management
Software Overview Sonja Vrcic
CONTOUR NGIMS PRE-SHIP REVIEW
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
ISCUSflex New Software Version September 2016
ISCED 2011 joint operational manual: Update
Motorola Solutions Internal Information
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2007.
Presentation transcript:

MPE, 4th of May 2006 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 4th of May 2006

MPE, 4th of May 2006 Page 2 XMM-Newton Introduction 1) MOS/PN related issue 2) MOS specific 3) SCOS2000

MPE, 4th of May 2006 Page 3 XMM-Newton MOS-PN Bit Rate reallocation Experience showed that some bandwidth could be reallocated from MOS to PN –Improve PN science production without affecting MOS science quality –The following table is now used by default: –OM = 1000 kb/s –RGS1 = 1500 kb/s –RGS2 = 1500 kb/s –MOS1 = kb/s (16000 before) –MOS2 = kb/s (16000 before) –PN = kb/s (15888 before)

MPE, 4th of May 2006 Page 4 XMM-Newton Substitution heater LCL Trip-on Rev. 1114, 7 th of January 2006, spurious switch-on of the nominal substitution heater, within one exposure: - PN: degC < T < degC - MOS1: degC < T < degC - MOS2: degC < T < degC Recovered by the corresponding contingency procedure Explanation: SEU –14 th LCL trip off/on since the BOL –11 occurrences in the last 2 years

MPE, 4th of May 2006 Page 5 XMM-Newton Redundancies documents One document per instrument has been produced to analyze the redundancy cases: –Electronic boxes –Filter wheel –Thermal subsystem Baseline in case of future failures, and possible further tests

MPE, 4th of May 2006 Page 6 XMM-Newton MOS specific – new fixed offset tables In order to compensate the long term drift in the MOS background, the overall fixed offsets has been lowered by 1 ADU for: - MOS1 CCDs 2, 4 and 7 - MOS2 CCDs 3, 4, 5 and 7 Change available with the new database release as of the 27 th of April, rev for manual commanding, ~ 1 month later for timeline commanding

MPE, 4th of May 2006 Page 7 XMM-Newton MOS 1 total loss of telemetry In rev. 1140, on the 28 th of February: 20:46z, MOS1 stopped sending Telemetry –Instrument in IDLE mode, FW closed –SW cold reset did not work –A hard reset was finally –After the reset, the functioning of the instrument was fully nominal

MPE, 4th of May 2006 Page 8 XMM-Newton MOS 1 total loss of telemetry Explanations –EMDH crash followed by a failure of the RBI –RBI stuck in INIT mode after the EMDH crash –No explanation other than the SEU one proposed so far –NCR#118 raised to trace the problem

MPE, 4th of May 2006 Page 9 XMM-Newton SCOS 2000 SCOS 2000 is now validated and used as our new control system Still one release to come to be in line with the “maintainable” version for the infrastructure