LOC, COCOMO I & COCOMO II Subject: Software Engineering Coordinator: Mr Anoj Kumar Presented By: Kamal Kishore (2012ca34) Jyoti Shrivastava (2012ca52)

Slides:



Advertisements
Similar presentations
Software Cost Estimation
Advertisements

COST ESTIMATION TECHNIQUES AND COCOMO. Cost Estimation Techniques 1-)Algorithmic cost modelling 2-)Expert judgement 3-)Estimation by analogy 4)-Parkinsons.
Estimation using COCOMO More Science, Less Art. COCOMO History COCOMO History Constructive Cost Model Dr. Barry Boehm TRW in 1970s COCOMO
Cocomo II Constructive Cost Model [Boehm] Sybren Deelstra.
Software Project Management Lecture 3 Size and Cost Estimation.
Ch8: Management of Software Engineering. 1 Management of software engineering  Traditional engineering practice is to define a project around the product.
1 COST ESTIMATION Basics, COCOMO, FP. 2 What is estimated? TIME MONEY TIME: –duration, chronological weeks, months, years –effort, person-month (man-month)
SOFTWARE PROJECT MANAGEMENT AND COST ESTIMATION © University of LiverpoolCOMP 319slide 1.
April 27, 2004CS WPI1 CS 562 Advanced SW Engineering Lecture #3 Tuesday, April 27, 2004.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 23Slide 1 Chapter 23 Software Cost Estimation.
Chapter 23 – Project planning Part 2. Estimation techniques  Organizations need to make software effort and cost estimates. There are two types of technique.
1 Cost Estimation CIS 375 Bruce R. Maxim UM-Dearborn.
Cost Estimation Van Vliet, chapter 7 Glenn D. Blank.
Information System Economics Software Project Cost Estimation.
Software Engineering: A Practitioner’s Approach
1 ECE 453 – CS 447 – SE 465 Software Testing & Quality Assurance Lecture 22 Instructor Paulo Alencar.
COCOMO Models Ognian Kabranov SEG3300 A&B W2004 R.L. Probert.
Estimation Why estimate? What to estimate? When to estimate?
Dr. M. Shamim HossainSWE 211 Effort, Duration and Cost Lec 3 1.
Project Management Estimation. LOC and FP Estimation –Lines of code and function points were described as basic data from which productivity metrics can.
CEN th Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Effort estimation.
By K Gopal Reddy.  Metrics in software are of two types.direct and indirect.  Function points as indirect metrics.  Function points are used to measure.
A Brief Introduction to COCOMO Hossein Saiedian EECS810: Software Engineering.
University of Southern California Center for Systems and Software Engineering Cost Estimation with COCOMO II Barry Boehm CS 510, Fall 2015 v3: Slide 10.
T. E. Potok - University of Tennessee CS 594 Software Engineering Lecture 3 Dr. Thomas E. Potok
10/27/20151Ian Sommerville.  Fundamentals of software measurement, costing and pricing  Software productivity assessment  The principles of the COCOMO.
Cost Estimation. Problem Our ability to realistically plan and schedule projects depends on our ability to estimate project costs and development efforts.
Cost Estimation What is estimated? –resources (humans, components, tools) –cost (person-months) –schedule (months) Why? –Personnel allocation –Contract.
Project Estimation Model By Deepika Chaudhary. Factors for estimation Initial estimates may have to be made on the basis of a high level user requirements.
Project Planning and Estimation
Software Project Planning Part II. Troutman's Postulates Profanity is the one language understood by all programmers. Not until a program has been in.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 26 Slide 1 Software cost estimation 2.
SFWR ENG 3KO4 Slide 1 Management of Software Engineering Chapter 8: Fundamentals of Software Engineering C. Ghezzi, M. Jazayeri, D. Mandrioli.
Software Project Estimation IMRAN ASHRAF
Effort Estimation Has been an “art” for a long time because
©Ian Sommerville, adapted by Werner Wild 2004Project Management Slide 1 Software cost estimation u Predicting the resources required for a software development.
University of Southern California Center for Systems and Software Engineering © 2010, USC-CSSE 1 Trends in Productivity and COCOMO Cost Drivers over the.
Estimation using COCOMO
Function Points Synthetic measure of program size used to estimate size early in the project Easier (than lines of code) to calculate from requirements.
Estimating “Size” of Software There are many ways to estimate the volume or size of software. ( understanding requirements is key to this activity ) –We.
Effort Estimation In WBS,one can estimate effort (micro-level) but needed to know: –Size of the deliverable –Productivity of resource in producing that.
The COCOMO model An empirical model based on project experience. Well-documented, ‘independent’ model which is not tied to a specific software vendor.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 26 Slide 1 Software cost estimation.
Rating Very Very Extra Cost Drivers Low Low Nominal High High High Product Attributes Required software reliability Database size.
1. 2 Software Project Planning After the finalization of SRS, we would like to estimate size, effort cost and development time of the project. Also, in.
بشرا رجائی برآورد هزینه نرم افزار.
CS223: Software Engineering
THE FAMU-CIS ALUMNI SYSTEM
Project Cost Management
SOFTWARE PROJECT MANAGEMENT AND COST ESTIMATION
PROJECT LIFE CYCLE AND EFFORT ESTIMATION
Tutorial: Software Cost Estimation Tools – COCOMO II and COCOTS
Constructive Cost Model
Pongtip Aroonvatanaporn CSCI 577b Spring 2011 March 25, 2011
SOFTWARE PROJECT MANAGEMENT AND COST ESTIMATION
Cost Estimation with COCOMO II
Software Systems Cost Estimation
COCOMO Model Basic.
Chapter 5: Software effort estimation- part 2
Cost Estimation with COCOMO II
Cost Estimation with COCOMO II
Activities During SPP Size Estimation
More on Estimation In general, effort estimation is based on several parameters and the model ( E= a + b*S**c ): Personnel Environment Quality Size or.
COCOMO Models.
Cost Estimation Van Vliet, chapter 7 Glenn D. Blank.
COCOMO 2 COCOMO 81 was developed with the assumption that a waterfall process would be used and that all software would be developed from scratch. Since.
Chapter 23 Software Cost Estimation
COnstructive COst MOdel
Software cost estimation
COCOMO MODEL.
Presentation transcript:

LOC, COCOMO I & COCOMO II Subject: Software Engineering Coordinator: Mr Anoj Kumar Presented By: Kamal Kishore (2012ca34) Jyoti Shrivastava (2012ca52) Kalyan Mondal (2012ca49) Jyotsna Agnihotri (2012ca66) Karishma Gupta(2012ca55)

Contents Software Planning LOC: Lines of Code Function Point Cost Estimation Development Mode COCOMO I Basic COCOMO Intermediate COCOMO Detailed COCOMO COCOMO II Application Composition Early Design Model Post Architecture Model References

SOFTWARE PLANNING Software planning begins before technical work starts, continues as the software Evolves from concept to reality, and culminates only when the software is retired. Fig:- Activities during software project planning Created by:- Kamal kishore(2012ca34) Ref :-software engineering by K.K.Agrawal, yogesh singh

LINES OF CODE(LOC) A Line of code is any line of program text that is not a comment or blank line, regardless of the number of statements or fragments on the line. This specifically includes all lines containing program header, declarations, and executable and non-executable statements. While line of codes have their uses, their usefulness is limited for other tasks like functionality, complexity, efficiency, etc. Created by:- Kamal kishore(2012ca34) Ref :-software engineering by K.K.Agrawal, yogesh singh

Internal Logical Files External Interface Files FUNCTION POINT Function point measures functionality which is a solution to the size measurement problem. It is decomposed into following functional units Inputs Outputs Enquiries Internal Logical Files External Interface Files Created by:- Kamal kishore(2012ca34) Ref :-software engineering by K.K.Agrawal, yogesh singh

FUNCTIONAL UNITS WITH WEIGHTING FACTORS Low Average High External Inputs 3 4 6 External Outputs 5 7 External Inquiries Internal logical files (ILF) 10 15 External interface files (EIF) The procedure for the calculation of UFP in mathematical form is given below 5 3 UFP = ∑ ∑ 𝑍 𝑖𝑗 WijUFP : Unadjusted Function Point i=1 j=1 Where i indicates the row and j indicates the column of table. Wij : It is the entry of ith row and jth column of the table. Zij: It is the count of the number of functional unit of type i that have been classified as having the complexity corresponding to column j Created by:- Kamal kishore(2012ca34) Ref :-software engineering by K.K.Agrawal, yogesh singh

An example Consider a project with the following functional units: 50 user inputs,40 user outputs, 35 user enquiries,6 user files,4 external interfaces. Assume all complexity adjustment factors and weighting factors are average. Compute the function points for the project. Suppose that program needs 70 LOC per FP. Find out the size of complete project. Solution: 5 3 UFP = ∑ ∑ 𝑍 𝑖𝑗 Wij i=1 j=1 UFP= 50 * 4 + 40 * 5 + 35 * 4 + 6 * 10 + 4 * 7 = 200+200+140+60+28 = 628 CAF= (0.65 + ∑ 𝐹 𝑖 ) =(0.65 + 0.01 (14 * 3 )) = 1.07 FP= UFP * CAF =628 * 1.07 = 672 Size = FP * (LOC per FP) = 672 * 70 = 47040 LOC Created by:- Kamal kishore(2012ca34) Ref :-software engineering by K.K.Agrawal, Yogesh Singh

Cost Estimation Approximate judgement of the costs for a project. It should be done throughout the entire life cycle. Why we need? To determine how much effort and time a software project requires. Important for making good management decisions. It facilitates competitive contract bids. It affect the planning and budgeting of a project. Ref: Software Engineering By K.K.Aggarwal & Y. Singh Created by: Jyoti Shrivastava

Development Mode of S/W Projects Size Nature of Project Innovation Deadline Organic Typically 2-50 KLOC Small size project, Experienced developers. Little Not Tight Semi Detached 50-300KLOC Medium size project and team. Medium Embedded Typically over 300KLOC Large project, Real-time systems Significant Tight

Constructive Cost Model(COCOMO ) The COCOMO model is a single variable software cost estimation model developed by Barry Boehm in 1981. The model uses a basic regression formula, with parameters that are derived from historical project data and current project characteristics. Hierarchy of Cocomo Model Basic COCOMO model Intermediate COCOMO model Detailed COCOMO model Ref: Software Engineering By K.K.Aggarwal & Y. Singh Created by: Jyoti Shrivastava

Basic COCOMO Model It take the form: Effort(E) = ab * (KLOC)bb(in Person-months) DevelopmentTime(D) = cb * (E) db (in month) Average staff size(SS) = E/D (in Person) Productivity(P) = KLOC / E (in KLOC/Person-month) Project ab bb cb db Organic 2.4 1.05 2.5 0.38 Semidetached 3.0 1.12 0.35 Embedded 3.6 1.20 0.32 Ref: Software Engineering By K.K.Aggarwal & Y. Singh Created by: Jyoti Shrivastava

What is Person-Months ? The area under the curve Ref: Fundamentals of Software Engineering By Rajib Mall Created by: Jyoti Shrivastava

Basic cocomo: Example A project size of 200KLOC is to be developed.S/W development team has average experience on similar type of projects.The project schedule is not very tight.Calculate the effort and development time of the project. Ans: 200 KLOC implies semi-detached mode. Hence, E= 3.0 * (200)1.12 = 1133.12 PM D=2.5 * (1133.12)0.35 = 29.3 M Avg. staff size(SS) = E/D = 1133.12/29.3=38.67 Persons. Productivity (P) = KLOC/E = 200/1133.12=0.1765 KLOC/PM. Ref: Software Engineering By K.K.Aggarwal & Y. Singh Created by: Jyoti Shrivastava

Intermediate COCOMO Extension of Basic COCOMO Why Use ? Basic model lacks accuracy Computes software development effort as a function of program size and set of 15 Cost Drivers Cost Driver: A multiplicative factor that determines the effort required to complete the software project. Why Cost Drivers? Adjust the nominal cost of a project to the actual project Environment. For each Characteristics, Estimator decides the scale factor Ref: Software Engineering By K.K.Aggarwal & Y. Singh Created by: Kalyan Mondal Very Low Low Nominal High Very High Extra High

Cost Drivers Required Software Reliability (RELY) Database Size (DATA) Product Attributes Required Software Reliability (RELY) Database Size (DATA) Product Complexity (CPLX) Computer Attributes Execution Time Constraint (TIME) Main Storage constraint (STOR) Virtual Machine volatility (VIRT) Computer turnaround time (TURN) Personnel Attributes Analyst Capability (ACAP) Application Experience (AEXP) Programmer Capability (PCAP) Virtual Machine Experience (VEXP) Programming language Experience (LEXP) Project Attributes Modern programming practices (MODP) Use of Software tools (TOOL) Required development schedule (SCED) Ref: Software Engineering By K.K.Aggarwal & Y. Singh Created by: Kalyan Mondal

The Calculation Project ab bb cb db Multiply all 15 Cost Drivers to get Effort Adjustment Factor(EAF) E(Effort) = ab(KLOC)bb * EAF(in Person-Month) D(Development Time) = cb(E)db (in month) SS (Avg Staff Size) = E/D (in persons) P (Productivity) = KLOC/E (in KLOC/Person-month) Project ab bb cb db Organic 3.2 1.05 2.5 0.38 Semidetached 3.0 1.12 0.35 Embedded 2.8 1.20 0.32 Ref: Software Engineering By K.K.Aggarwal & Y. Singh Created by: Kalyan Mondal

Intermediate COCOMO : Example A new project with estimated 400 KLOC embedded system has to be developed. Project manager hires developers of low quality but a lot of experience in programming language. Calculate the Effort, Development time, Staff size & Productivity. EAF = 1.29 * 0.95 = 1.22 400 LOC implies Embedded System Effort = 2.8*(400)1.20 * 1.225 = 3712 * 1.22 = 4528 person-months Development Time = 2.5 * (4528)0.32 = 2.5 * 14.78 = 36.9 months Avg. Staff Size = E/D = 4528/36.9 = 122 persons Productivity = KLOC/Effort = 400/4528 = 0.0884 KLOC/person-month Cost Drivers Very Low Low Nominal High Very High Extra High AEXP 1.29 1.13 1.00 0.91 0.82 -- LEXP 1.14 1.07 0.95 Ref: Software Engineering By K.K.Aggarwal & Y. Singh Created by: Kalyan Mondal

Detailed COCOMO Detailed COCOMO = Intermediate COCOMO + assessment of Cost Drivers impact on each phase. Phases Plans and requirements System Design Detailed Design Module code and test Integrate and test Cost of each subsystem is estimated separately. This reduces the margin of error. Ref: Software Engineering By K.K.Aggarwal & Y. Singh Created by: Kalyan Mondal

The Calculation Multiply all 15 Cost Drivers to get Effort Adjustment Factor(EAF) E(Effort) = ab(KLOC)bb * EAF(in Person-Month) D(Development Time) = cb(E)db (in month) Ep (Total Effort) = µp * E (in Person-Month) Dp (Total Development Time) = τp * D (in month) Ref: Software Engineering By K.K.Aggarwal & Y. Singh Created by: Kalyan Mondal

Detailed COCOMO : Example Consider a project to develop a full screen editor. The major components identified and their sizes are (i) Screen Edit – 4K (ii) Command Lang Interpreter – 2K (iii) File Input and Output – 1K (iv) Cursor movement – 2K (v) Screen Movement – 3K. Assume the Required software reliability is high, product complexity is high, analyst capability is high & programming language experience is low. Use COCOMO model to estimate cost and time for different phases. Size of modules : 4 + 2 + 1 + 2 + 3 = 13 KLOC [Organic] EAF = 1.15 * 1.15 * 0.86 * 1.07 = 1.2169 Cost Drivers Very Low Low Nominal High Very High Extra High RELY 0.75 0.88 1.00 1.15 1.40 -- CPLX 0.70 0.85 1.30 1.65 ACAP 1.46 1.19 0.86 0.71 LEXP 1.14 1.07 0.95 Ref: Software Engineering By K.K.Aggarwal & Y. Singh Created by: Kalyan Mondal

Example (Contd.) Initial Effort (E) = ab(KLOC)bb * EAF = 3.2*(12)1.05 * 1.2169 = 52.9 person-months Initial Development Time = cb(E)db =2.5*(52.9)0.38 = 11.29 months Phase value of µp and τp Phase wise effort & development time distribution Plan & Reqr System Design Detail Design Module code & test Integration & Test Organic Small µp 0.06 0.16 0.26 0.42 Organic Small τp 0.10 0.19 0.24 0.39 0.18 E D Ep (in person-months) Dp (in months) Plan & Requirement 52.9 11.29 0.06*52.9 = 3.17 0.10*11.29=1.12 System Design 0.16*52.9=8.46 0.19*11.29=2.14 Detail Design 0.26*52.9=13.74 0.24*11.29=2.70 Module code & test 0.42*52.9=22.21 0.39*11.29=4.40 Integration & test 0.18*11.29=2.03 Ref: Software Engineering By K.K.Aggarwal & Y. Singh Created by: Kalyan Mondal

WHY COCOMO-II ?  The changes in s/w development techniques included a move away from mainframe overnight batch processing to desktop- based real-time turnaround. These changes and others began to make applying the original COCOMO model problematic. The model is tuned to the life cycle practices of the 21st century. Ref: Software Engineering By K.K.Aggarwal & Y. Singh and csse website by : Jyotsna Agnihotri

Categories Identified By Cocomo II End User Programming Infrastructure Sector Intermediate Sectors Application Generators And Composition Aids Application Composition Sector System Integration Stages Of Cocomo-II Application Composition Earlier Design Post Architecture Ref: Software Engineering By K.K.Aggarwal & Y. Singh by : Jyotsna Agnihotri

Application Composition Assess Object Counts Classification Of Complexity Levels Assign Complexity Weight To Each Object Determine Object Points Compute New Object Points Calculation Of Productivity Rate Compute The Effort In Person Months.

Classification of complexity levels: Assess object counts: Estimate the number of screens, reports and 3 GL components that will comprise this application. Classification of complexity levels: We have to classify each object instance (depending on values of its characteristics) into :- simple medium Difficult Assign complexity weight to each object : The weights are used for three object types :- screen report 3GL components Ref: Software Engineering By K.K.Aggarwal & Y. Singh by : Jyotsna Agnihotri

Object Points * (100 - %reuse) Determine object points: Add all the weighted object instances to get one number and this known as object-point count. Compute new object points: We have to estimate the percentage of reuse to be achieved in a project. Depending on the percentage reuse, the new object points (NOP) are computed. Object Points * (100 - %reuse) NOP = --------------------------------------------- 100 NOP are the object points that will need to be developed and differ from the object point count because there may be reuse( percentage of the Product development which is accomplished by exploiting the existence of existing component's design-or-development effort). Ref: Software Engineering By K.K.Aggarwal & Y. Singh&gilb.com by : Jyotsna Agnihotri

Productivity rate (PROD) = NOP/Person month Calculation of productivity rate: The productivity rate can be calculated as: Productivity rate (PROD) = NOP/Person month Compute the effort in Persons-Months: When PROD is known, we may estimate effort in Person- Months as: NOP Effort in PM = ------------ PROD Ref: Software Engineering By K.K.Aggarwal & Y. Singh by : Jyotsna Agnihotri

Example Example: Consider a database application project with the following characteristics: The application has 4 screens with 4 views each and 7 data tables for 3 servers and 4 clients. The application may generate two report of 6 sections each from 07 data tables for two server and 3 clients. There is 10% reuse of object points. The developer’s experience and capability in the similar environment is low. The maturity of organization in terms of capability is also low. Calculate the object point count, New object points and effort to develop such a project. Ref: Software Engineering By K.K.Aggarwal & Y. Singh by : Jyotsna Agnihotri

Solution : Lets have a look on the tables for screens, for reports , for complexity weights for each level No. Of Views Contained in a screen Total<4 (<2 servers <3 clients) Total<8 (2-3 servers 3-5 clients) Total 8+ (>3 servers >5 clients) <3 Simple Medium 3-7 Difficult >8 No. Of Sections Contained in a report Total<4 (<2 servers <3 clients) Total<8 (2-3 servers 3-5 clients) Total 8+ (>3 servers >5 clients) 0 or 1 Simple Medium 2 or 3 Difficult 4+

Object Type Simple Complexity Medium Complexity Difficult Complexity This project comes under the category of application composition estimation model. Number of screens = 4 with 4 views each Number of reports = 2 with 6 sections each From Table we know that each screen will be of medium complexity and each report will be difficult complexity. Using Table of complexity weights, we may calculate object point count = 4 x 2 + 2 x 8 = 24 Object Type Simple Complexity Medium Complexity Difficult Complexity Screen 1 2 3 Report 5 8 3GL - 10 Ref: Software Engineering By K.K.Aggarwal & Y. Singh by : Jyotsna Agnihotri

Using the formula NOP is calculated as: NOP= 24 * (100-10)/100=21.6 Low value of productivity is given in above Productivity table = 7 Efforts in PM=NOP/PROD=21.6/7=3.086 PM Developer’s Experience And Capability PROD (NOP/PM) Very low 4 Low 7 Nominal 13 High 25 Very high 50 Ref: Software Engineering By K.K.Aggarwal & Y. Singh by : Jyotsna Agnihotri

Early Design Model Used in the early stages of a software project when very little may be known about: the size of the product to be developed, the nature of the target platform, the nature of the personnel to be involved in the project. Uses Unadjusted Function Points (UFP) as the measure of size. Based on a standard formula for COCOMO-II models: Where PMnominal = Effort of the project in person months A = Constant representing the nominal productivity, provisionally set to 2.5 B = Scale factor Size = Software size Created by- Karishma Gupta (2012CA55) Ref: Software Engineering By K.K. Aggarwal & Yogesh Singh

Early design cost drivers The Scaling Factors that COCOMO-II model uses for the calculation of B are: Precedentness (PREC) Development flexibility (FLEX) Architecture/ Risk Resolution (RESL) Team Cohesion (TEAM) Process maturity (PMAT) Early design cost drivers There are 7 early design cost drivers and are given below: Product Reliability and Complexity (RCPX) Required Reuse (RUSE) Platform Difficulty (PDIF) Personnel Capability (PERS) Personnel Experience (PREX) Facilities (FCIL) Schedule (SCED) Created by- Karishma Gupta (2012CA55) Ref: Software Engineering By K.K. Aggarwal & Yogesh Singh MNNIT ALLAHABAD, INDIA

Data for the Computation of B (Scalar Factor) Scaling Factors Very Low Low Nominal High Very High Extra High Precedentness 6.20 4.96 3.72 2.48 1.24 0.00 Development Flexibility 5.07 4.05 3.04 2.03 Architecture/ Risk Resolution 7.07 5.65 4.24 2.83 1.41 Team Cohesion 5.48 4.38 3.29 2.19 1.10 Process Maturity 7.80 6.24 4.68 3.12 1.56 Created by- Karishma Gupta (2012CA55) Ref: Software Engineering By K.K. Aggarwal & Yogesh Singh

Calculate the scalar factor B If B=1.0, then Linear relationship b/w Effort & Size. If B 1.0, then Non-Linear relationship b/w Effort & Size. If B<1.0, then the rate of increase of effort decreases as the size of the product increases. If B>1.0, then the rate of increase of effort increases as the size of the product increases. B = 0.91 + 0.01 * (Sum of rating on scaling factors for the project) When all the scaling factors of a project are rated as extra high, then the best value of B= 0.91 (for COCOMO II.2000) when all the scaling factors of a project are rated as very low, Then the worst value of B= 1.23 (for COCOMO II.2000) Hence, the value of B may vary from 0.91 to 1.23 Created by- Karishma Gupta (2012CA55) Ref: Software Engineering By K.K. Aggarwal & Yogesh Singh

Early Design Model: Example Question: A software project of application generator category with estimated 50 KLOC has to be developed. The scale factor (B) has low precedentness, high development flexibility and low team cohesion. Other factors are nominal. The early design cost drivers like platform difficult (PDIF) and Personnel Capability (PERS) are high and others are nominal. Calculate the Effort in person-months for the development of the project. Early Design Cost Drivers Extra Low Very Low Low Nominal High Very High Extra High RCPX 0.73 0.81 0.98 1.0 1.30 1.74 2.38 RUSE - 0.95 1.07 1.15 1.24 PDIF 0.87 1.29 1.81 2.61 PERS 2.12 1.62 1.26 0.83 0.63 0.50 PREX 1.59 1.33 1.12 0.71 0.62 FCIL 1.43 1.10 SCED 1.14 Created by- Karishma Gupta (2012CA55) Ref: Software Engineering By K.K. Aggarwal & Yogesh Singh

Solution : B = 0.91 + 0.01 * (Sum of rating on scaling factors for the project) = 0.91 + 0.01 * (4.96 + 2.03 + 4.24 + 4.38 + 4.68) = 0.91 + 0.01(20.29)=1.1129 = 2.5 * (50)1.1129 = 194.41 Person-months here A=2.5 (for COCOMO II.2000) predefined The 7 cost drivers are: PDIF = high (1.29) PERS = high (0.83) RCPX = nominal (1.0) RUSE = nominal (1.0) PREX = nominal (1.0) FCIL = nominal (1.0) SCEO = nominal (1.0) = 194.41 * [1.29 x 0.83] = 194.41 x 1.07 = 208.155 Person months Created by- Karishma Gupta (2012CA55) Ref: Software Engineering By K.K. Aggarwal & Yogesh Singh

Post Architecture Model Most detailed estimation model. Used when a software life cycle architecture has been completed. Used in the development and maintenance of software products in the application generators, system integration or infrastructure sectors. Lines of Codes Counting Rules Function Points Cost Drivers Where EM : Effort multiplier which is the product of 17 cost drivers. PMnominal = Effort of the project in person months. Created by- Karishma Gupta (2012CA55) Ref: Software Engineering By K.K. Aggarwal & Yogesh Singh

Cost Drivers of Post Architecture Product Attributes Required Software Reliability (RELY) Database Size (DATA) Product Complexity (CPLX) Documentation (DOCU) Required Reusability (RUSE) Computer Attributes Execution Time Constraint (TIME) Platform Volatility (PVOL) Main Storage constraint (STOR) Personnel Attributes Analyst Capability (ACAP) Personnel Continuity (PCON) Programmer Experience (PEXP) Programmer Capability (PCAP) Analyst Experience(AEXP) Language & Tool Experience (LTEX) Project Attributes Use of Software tools (TOOL) Required development schedule (SCED) Site Locations & Communications Technology b/w sites (SITE) Created by- Karishma Gupta (2012CA55) Ref: Software Engineering By K.K. Aggarwal & Yogesh Singh

Added Cost Drivers Deleted Cost Drivers 7 cost drivers 5 Cost Drivers DOCU RUSE PVOL PLEX LTEX PCON SITE 5 Cost Drivers VIRT TURN VEXP LEXP MODP Created by- Karishma Gupta (2012CA55) Ref: Software Engineering By K.K. Aggarwal & Yogesh Singh

17 Cost Drivers Cost Drivers Very Low Low Nominal High Very High Extra High RELY 0.75 0.88 1.00 2.48 1.24 0.00 DATA 0.93 2.03 CPLX 2.83 1.41 RUSE 0.91 2.19 1.10 DOCU 0.89 0.95 3.12 1.56 TIME 1.11 1.31 1.67 STOR 1.06 1.21 1.57 PVOL 0.87 1.15 1.30 ACAP 1.50 1.22 0.83 0.67 PCAP 1.37 1.16 0.74 PCON 0.92 0.84 AEXP 0.81 PEXP 1.25 1.12 LTEX TOOL 0.86 0.72 SITE 0.78 SCED 1.29 Created by- Karishma Gupta (2012CA55) Ref: Software Engineering By K.K. Aggarwal & Yogesh Singh

Schedule Estimation Size Measurement Development time can be calculated using PMadjusted as a key factor and the desired equation is: Where = constant, provisionally set to 3.67, B = Scaling factor TDEVnominal = calendar time in months with a scheduled constraint PMadjusted = Estimated effort in Person months (after adjustment) Size Measurement Size can be measured in any unit and the model can be calibrated accordingly. However, COCOMO II details are: Application composition model uses the size in object points. The other two models use size in KLOC. Created by- Karishma Gupta (2012CA55) Ref: Software Engineering By K.K. Aggarwal & Yogesh Singh

Post Architecture: Example Ques: A software project of application generator category with estimated 50 KLOC has to be developed. The scale factor (B) has low precedentness, high development flexibility and low team cohesion. The identified 17 Cost drivers are high reliability (RELY), very high database size (DATA), high execution time constraint (TIME), very high analyst capability (ACAP), high programmers capability (PCAP). The other cost drivers are nominal. Calculate the effort in Person-Months for the development of the project. Here B = 1.1129 PMnominal = 194.41 Person-months = 194.41 x (1.15 x 1.19 x 1.11 x 0.67 x 0.87) = 194.41 x 0.885 = 172.05 Person-months Solution : Created by- Karishma Gupta (2012CA55) Ref: Software Engineering By K.K. Aggarwal & Yogesh Singh

Created by- Karishma Gupta (2012CA55). Ref: Software Engineering By K Created by- Karishma Gupta (2012CA55) Ref: Software Engineering By K.K. Aggarwal & Yogesh Singh

Final Word “The models are just there to help, not to make the management decisions for you.” --Barry Boehm Ref: https://cs.uwaterloo.ca/~apidduck/se362/Lectures/cocomo.pdf

References Software Engineering (Third Edition) By K.K.Aggarwal & Y. Singh Fundamentals of Software Engineering (Third Edition) By Rajib Mall Software Engineering , 6th Edition By Ian Sommerville Software Engineering (Sixth Edition) by Roger S. Pressman https://cs.uwaterloo.ca/~apidduck/se362/Lectures/coco mo.pdf