Status of Tracker Power supply electronics Mauro Menichelli,Sandor Blasko,Lucio Accardo INFN Perugia.

Slides:



Advertisements
Similar presentations
6.1 Synchronous Computations ITCS 4/5145 Cluster Computing, UNC-Charlotte, B. Wilkinson, 2006.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
Link Board Upscope Frascati group Napoli group Warsaw group.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
TDR2 FM board tests D. Haas Test Setup Test Procedure Functional tests Results Test Schedule.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
EKT214 - ANALOG ELECTRONIC CIRCUIT II
Applied Technology High School ATE 1012 Grade 10 Eng. Rose Hasan.
October 2010 When should I consider a DC/DC Power Module Regulator?
Presented by:- NAME : Sanjay Kumar Pani BRANCH : Electrical & Electronics GROUP : ‘B1’ ROLL NO. : E/04/14.
Final-Presentation Project “Kuala” Winter 2014 High Speed Digital Systems Lab Presented by: Stephen Taragin Supervisor: Boaz Mizrachi.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
Seog Oh/ Duke University/September, 2003 TRT Workshop/ Peniscola, Spain Duke TRT Progress.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
FEE Electronics progress Mezzanine manufacture progress FEE64 testing and VHDL progress Test mezzanine. Trial mechanical assembly 10th November 2009.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
A.Kounine 13 Jan 2007Flight Software Status1 JSC 13 January 2007 Andrei Kounine / MIT.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
3 rd Work Meeting of CBS-MPD STS, Karelia, 2009 Towards CBM STS Volker Kleipa, GSI Darmstadt.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Mid-Presentation Project “Koala” Winter 2014 High Speed Digital Systems Lab Presented by: Stephen Taragin Supervisor: Boaz Mizrachi Single semester project.
Linear Regulator Fundamentals
Chapter 6 Voltage Regulators By En. Rosemizi Bin Abd Rahim EMT212 – Analog Electronic II.
The power supply system of the AMS experiment M. Menichelli, L. Accardo, G. Ambrosi, R. Battiston, M. Bizzarri, S. Blasko, D. Cosson, E. M. Fiori, O. Maris,
UG-crate status AMS TIM - CERN - 15/4/2008 A.Bartoloni, B.Borgia, F.R.Spada* INFN Roma.
Status of PDS A.Lebedev MIT AMS TIM Meeting, Houston, January 2007.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Tracker meeting – July, 2006 TBS – TPSFE FM/FS tests Lucio Accardo, INFN Perugia.
AMS TRD meeting Electronics 17th July 2002, CERN G. Schwering: Overview M. Capell: Crate Mechanics/Arrangement W. Karpinski: Front End – Status C.H. Chung:
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
HV boards 1.FIRST ASDBLR HV PROTO BOARD: leakage currents on 100nA CH, humidity at cern. 2. TRIAL 1 Encapsulate caps in Printed Circuit Board C schock,
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
DOM Electronic Reliability Progress Report S.Colonges 09/04/2014.
EMT212 – Analog Electronic II
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Section 1: Mission Overview Mission Statement Mission Objectives Section 2: The Payload! User’s Guide Compliance Beta Prototype Testing Section 3: Check-In.
Status of the TTCE-EGSE and Power Supply Mauro Menichelli INFN Perugia.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
TRD Electronics Flight Production Wim de Boer, Kai Gassmann, Florian Hauler, Andreas Sabellek, Mike Schmanau IEKP - Universität Karlsruhe (TH)
RockSat-C 2012 LRR Launch Readiness Review University of Minnesota Alex Richman, Jacob Schultz, Justine Topel, Will Thorson 5/27/2012.
Como, Oct 20017th Conf. on Advanced Technology and Particle Physics Radiation tolerance and magnetic field behavior of CAEN HV and LV boards for.
Section 1: Mission Overview Mission Statement Mission Objectives Expected Results System Modifications Functional Block Diagrams 2.
Status of the TileMuon Digitizer Board Victor Ferraz.
Actel re-programming at CERN Actels on S9011AT, TPSFE and TBS boards have been re-programmed with new specifications / new implementations from Vladimir.
PCB Assembly. INTRODUCTION  PCB abbreviation is a printed circuit board,also known as a printed wiring board.  For electronics PCB is used to build.
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
Report on tests ongoing in Perugia
SMPS.
Electricity – what’s it about?
Preproduction Status & Results
AMS 02 Electronics TRD Crate Arrangement
I I I I \ \ \ \ ' Belly Fat Burning Foods.
Outsourcing Strategies
GLAST Large Area Telescope:
GLAST Large Area Telescope:
CMS Perugia Modules Production Review
Classic Linear Design Process
VCC Hardware Production Status
Quadro DRF 40E NF How to fix the display flickering.
Circuits _____________ ______________
Rebuilding the ON0EME power amplifier
Definitions Quiz (1-10) PLTW Terms PLTW Vocabulary Set #12.
Presentation transcript:

Status of Tracker Power supply electronics Mauro Menichelli,Sandor Blasko,Lucio Accardo INFN Perugia

Summary DC-DC converters Linear regulator boards (TBS and TPSFE)

Tracker, TRD and others I 9 samples S samples S samples S samples S9053U 10 samples S samples S samples S9056

Tracker, TRD and others II Converter type Total number ESS test passed Passed functional (no ESS) Broken not fixed Broken, fixed and passed ESS NCR S S S S9053U S S S Total

Tracker, TRD and others III Errors Error in documents: 2 Broken components: 6 Wrong mounting:4 Mechanical and electrical failures: 2 Unknown: 7 3 boards (2 S9053, 1 S9051) returned from CAEN.

Overall situation TBS

Overall situation TBS 20 / 20 boards are waiting to be re-worked: New Actels need to be burned and mounted on board. TPSFE 28 / 40 boards are waiting to be reworked: New Actels need to be burned and mounted on board. C5, C6, C7, C8, C9, C10, C11, C12, C13, C14, C15, C16 must be replaced and mounted up/down. 12 / 40 boards need to be assembled from scratch: It is needed to take into account i) and ii)

Forthcoming steps Presently the EMI/EMC tests is performed in Terni on the QM2 electronics (TPD+T-crate) New Actels will be burned at CERN and sent to CSIST New capacitors (about 350) TSMD CWR11 2.2UF 10V 10% SIZE A need to be sent to CSIST CSIST will go ahead with FM/FS production once the material will arrive to them After all the PCAs on the 40 TPSFE + 20 TBS will be finished, functional tests will be performed by Lucio at board level....