International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.

Slides:



Advertisements
Similar presentations
Global ATM Operational Concept
Advertisements

Block 1 Overview Rubén Oscar González Air Navigation Commissioner
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
System of Systems (DRAFT) To be approved by the ICAO Council
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
ICAO: Global Harmonization Plan
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Information Management The ICAO Perspective
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization ASBU Methodology Summary of Block 0 Modules H. Sudarshan SIP/2012/ASBU/Nairobi -WP/8 Workshop on preparations.
International Civil Aviation Organization Block 0 Overview Halidou Moussa Air Navigation Commissioner International Civil Aviation Organization.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-102 Increased Effectiveness of Ground-Based Safety Nets SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
International Civil Aviation Organization Global Air Navigation Plan (GANP) – Framework for global planning H. Sudarshan SIP/2012/ASBU/Nairobi -WP/7 Workshop.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
ASBUs Block 1 Overview The CANSO Viewpoint Eugene Hoeven Director ICAO Affairs ICAO Liaison Office Pre-AN-Conf/12 Workshop Montreal, November 2012.
International Civil Aviation Organization Airspace Allocation and Use Mitchell A. Fox Chief Flight Operations Section, ANB 10 April 2012 IAOPA World Assembly.
1 The model of integrated use of information for provision of aircraft flights Completed by: Kolosok A. Supervisor: Luppo O.E. Модель інтегративного використання.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
Aviation System Block Upgrades and NAV CANADA Planning
Workshop on preparations for ANConf/12 − ASBU methodology
ASBU Methodology Summary of Block 2 and 3 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
System of Systems (DRAFT) To be approved by the ICAO Council
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/7
Workshop on preparations for ANConf/12 − ASBU methodology
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Global ATM Operational Concept
Block Upgrades Next Steps & AN-Conf/12
Workshop on preparations for ANConf/12 − ASBU methodology
ANConf/12 – Agenda H. Sudarshan
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Trajectory-Based Operations(TBO) Saulo Da Silva
ANConf/12 – Agenda H. Sudarshan
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation Organization

2 A System of Systems Preparatory Workshop for AN-Conf/12

3 Synchronizing the System of Systems RASGS REGIONAL EFFORTS – PIRGS, RASGS, Priorities? Requests? ICAO ASSEMBLY & BUDGET STAKEHOLDE RS DATED/ NON- EXISTENT GLOBAL REPORTS AND PLANS PIRGS REGIONAL EFFORTS – PIRGS, RASGS, Priorities? Requests? ICAO ASSEMBLY & BUDGET STAKEHOLDE RS DATED/ NON- EXISTENT GLOBAL REPORTS AND PLANS Preparatory Workshop for AN-Conf/12

4 ICAO’s Strategic Approach Preparatory Workshop for AN-Conf/12

5 ICAO’s Strategic Approach Preparatory Workshop for AN-Conf/12

Integrated Planning through Block Upgrades 6Preparatory Workshop for AN-Conf/12

Increased Runway Throughput Through Optimized Wake Turbulence Separation Summary Improved throughput on departure and arrival runways through optimized wake turbulence separation minima, revised aircraft wake turbulence categories and procedures. Main performance impact as per Doc 9854 KPA-02 – Capacity, KPA-06 – Flexibility. Operating environment/ Phases of flight Arrival and departure Applicability considerations Least complex – Implementation of revised wake turbulence categories is mainly procedural. No changes to automation systems are needed. Global concept component(s) as per Doc 9854 CM – conflict management Global plan initiatives GPI-13: Aerodrome design GPI 14: Runway operations Main dependenciesNil Global readiness checklistStatus (ready now or estimated date) Standards readiness2013 Avionics availabilityN/A Ground systems availabilityN/A Procedures available2013 Operations approvals2013 Preparatory Workshop for AN-Conf/127

8 Benefiting from All the Modules There is added value in using all modules – States should view modules in B0 & B1 as critical: Formalizing a minimum track – They will allow for benefits down the road in B2 & B3 Preparatory Workshop for AN-Conf/12

9 The Cost of Not Implementing not Focusing on what it will cost if modules are not implemented: – Increased risk of serious incidents and accidents – Negative impact on operations – Environmental repercussions – etc. Preparatory Workshop for AN-Conf/12

10 Reporting Against the Global Plan… Performance Monitoring – of individual modules – Air Navigation Report Form Annual Global Air Navigation Report Compare progress across regions Adjust ICAO work programme Preparatory Workshop for AN-Conf/12

11 …through the Use of GIS Tools Preparatory Workshop for AN-Conf/12

12 Tracking Implementation in States & Regions Preparatory Workshop for AN-Conf/12

13 Aligning the Conference & the Global Air Navigation Plan CHAPTERSAN-CONF/12 WORKING PAPERS WP3 – Revised Global Air Navigation Plan (GANP) – framework for global planning WP5 – High-level Conference on Aviation Security (HLCAS) WP13 – Civil/military coordination/cooperation and flexible use of airspace WP25 – Minimum Path Preparatory Workshop for AN-Conf/12

14 Aligning the Conference & the Global Air Navigation Plan CHAPTERSAN-CONF/12 WORKING PAPERS Aviation System Block Upgrade Modules on: WP4 – Airport Capacity WP7 – SWIM WP8 – FF-ICE WP9 – Service improvement through digital AIM and ATM information WP10 – Network Operations WP11 – Airborne Separation WP12 – Airborne collision avoidance systems and ground-based safety nets WP14 – Integration of RPA into non- segregated airspace WP15 – Meteorological Information WP17 – TBO WP23 – Standardization – in support of One Sky Preparatory Workshop for AN-Conf/12

CHAPTERSAN-CONF/12 WORKING PAPERS 15 Aligning the Conference & the Global Air Navigation Plan WP6 – PBN for terminal and approach operations WP16 – PBN for en-route operations WP18 – CCO & CDO WP19 – Regional Performance Framework – planning methodologies and tools WP20 – Human Performance WP21 – GNSS implementation issues WP22 – Rationalization of terrestrial navigation aids Preparatory Workshop for AN-Conf/12

CHAPTERSAN-CONF/12 WORKING PAPERS 16 Aligning the Conference & the Global Air Navigation Plan WP24 – Regional Performance Framework – alignment of areas of applicability of ANPs and regional SUPPs Preparatory Workshop for AN-Conf/12

17 Desired Outcomes of AN-Conf/12 Endorsement of: – Global Plan, as unified planning mechanism Agreement on: – Integrated work programme – Structure and management of “Expert Groups” Recommendations on ICAO technical work programme: – Endorsement for short term Block Upgrades – Agreement on Block 1 Clear strategic direction for future infrastructure: – Endorsement for medium and long term Block Upgrades – Agreement on Blocks 2 & 3 Preparatory Workshop for AN-Conf/12

18 Further Addressing Technical Issues Aviation Data Link: Now and Tomorrow (2014) – Next steps for Data Link End-to-end System Demonstration of New ATM Concepts (2014) – Flight & Flow Information for a Collaborative Environment (FF-ICE) – Trajectory-based Operations – Human performance aspects Air Navigation Information Management Divisional Meeting (2015) – System Wide Information Management (SWIM) Preparatory Workshop for AN-Conf/12

19 Further Addressing Policies Synergy between 12 th Air Navigation Conference & 6 th Air Transport Conference: – Policy on access and equity – Consideration of possible global mandates for key infrastructure needs such as datalink & SWIM – Funding/financing of ground equipment & avionics for Block Upgrades Preparatory Workshop for AN-Conf/12

20 Summary Follow-up to previous briefing: – Aviation System Block Upgrades Next steps in packaging tomorrow’s aviation system ICAO’s strategic approach Steps leading to 12 th Air Navigation Conference For more information: Preparatory Workshop for AN-Conf/12

21Preparatory Workshop for AN-Conf/12