Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 3:  Progress Update  Specifications 

Slides:



Advertisements
Similar presentations
Lance Control System Thomas Gradwohl / Alexander Haug.
Advertisements

Justin Akerman (CE) Chris Hoerbelt (ME) Hersh Anand (EE) Anthony Poli (ME) Greg Mucks (ME) Jon Notaro (EE) Eric Tripp (EE) Customer: Stan Rickel.
Physiological Simulator
Vacuum Box Systems.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall.
30 th August 2006 ALTERNATIVE OPTIONS FOR SOLAR SERVICE DELIVERY Saliya J. Ranasinghe.
1 Dept. of Energy Technology, Div. of Applied Thermodynamics and Refrigeration Tube diameter influence on heat exchanger performance and design. Single.
P08026: Modular Hemodynamic Flow Simulator Jason Brown Mechanical Engineering Amanda Clark Mechanical Engineering Matthew Hicks Electrical Engineering.
Mobile Environment Chamber End of Term Progress Report Team members: Tuan Ngo ( presenter 1) Giang Nguyen (presenter 2) Duc Tran Peter Elabd Thien Nguyen.
P08009 Audible Memo Board Phase II Friday, February 22, 2008 P08009: Audible Memo Board Phase II Sponsor: Dr. Hopkins Advisor: Professor Slack Jon GosligaElectrical.
Lecture 3411/30/05. Vapor pressure vs. boiling point?
Binary Decision Diagrams1 BINARY DECISION DIAGRAMS.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 4 Presentation:  Selected Concepts  Engineering.
Unbreak My Heart. THIS WEEK’S PROBLEM:  How can human-made materials solve heart related problems?
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 2 Presentation:  Work Breakdown Structure.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 4 End of Day Presentation:  Design Review.
Risk Scoring Parameters Severity (choose most severe) Risk Ranking Likelihood ProductProjectInjury 3 Highly Likely > 50% Complete product failure, does.
Phase Difference = Phase Difference = 0.05.
Reservoir LVAD PVS / Booster Physiological Simulator Valve Automated Resistance Valve Three Loops Blood Extraction Standard Pressure Sensor Temperature.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 2 – End Of Day:  Progress Update  Concept.
Jon Klein Project Manager Kyle Menges Technical Lead Priya Narasimhan Electrical Engineer Julie Coggshal Industrial and Systems Engineer Christine Lowry.
Six Steps to a Better WBS Presented by 41 Bloomfield Street Lexington, MA USA © 2011 Project Management Partners.
Project Name Steering Committee Meeting Project Manager: Project Manager Name Program Manager: Program Manager Name Project Sponsor: Project Sponsor Name.
GARLOCK EXPANSION JOINT (MSDI-P13671) Systems Design Review II January 18 th, 2013 Friday, January 18, 2013P Garlock Expansion Joint 1.
Update Small Projects Group Facilities Division Capital Projects Team Meeting 14 July 2011 Glen Langstaff.
Leaving Certificate Biology Excretion 2 EQ iQuiz SECOND Press the F5 Key to Begin, Then click on this Blue Box FIRST In PowerPoint 2007 if you see a Security.
Jon KleinISEProject Manager Nguyen VuMETechnical Lead Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer Priya NarasimhanEEElectrical.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
TEAM 2: John Kumuyi, Chris Regan, Kristi Hey, John Hey.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Hemodynamics Purpose of control mechanisms of blood flow? Maintain homeostasis Purpose of blood flow? Nutrient and waste exchange Blood flow to brain and.
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
Important Idea, Skill or Attitude I learned from this course which I can use in my job: The advance facilitation processes (only stage 2: Clarify desired.
Bob Travica MIS 2000 Class 9 Group Processes and Group Support Systems Updated: 7 October 2012.
Jon KleinISEProject Manager Nguyen VuMETechnical Lead (MSD1) Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer.
WEEK 1 You have 10 seconds to name…
PTCS Commissioning, Controls & Sizing Update of UES Measure Category and/or Status Regional Technical Forum July 15, 2014.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall.
How do You Fit within the Process? Roles and Responsibilities – Pre CAB (1/2) 1 Change Requestor Initiates the Change Request (CR) in Service-now Includes.
The lymphatic system collects fluid that leaks out of the capillaries.
Gatekeeper Plan features that support person-centered planning.
M M M M 5. Not Listed
Intelligence and Information Systems 1 3/17/2004 © 2004 Raytheon Company USC/CSE Executive Workshop on Agile Experiences March 17, 2004 A Raytheon Agile.
ICU Patient Transfers to Floors. Wholeness Stewardship Excellence Respect Response to Need 2 Michelle Blakely Team Leader Cheryl Stensrud Director Brittany.
COMET Working Group Progress Report. Purpose of Report Provide Team Updates Potential Future Voting Items Draft Competitive Meter Ownership Timeline.
SYSTEM LEVEL DESIGN REVIEW P16318 Gaseous Mass Flow Rate Controller Luke McKean, Lianna Dicke, Selden Porter, Schuyler Witschi ?
Marketing 2 The Apprentice Challenge #2. Marketing 2 February 21 st & 22nd Reminders: 1.Mentors forms due on Feb. 23 & 24 _________________________________________________________________.

实验十四 紫外线灭菌  一、实验背景及目的:  灭菌是一种杀灭微生物的措施。紫外线灭菌 是物理灭菌因素之一。  1. 了解紫外线灭菌的原理;  2. 学习、掌握紫外线灭菌的方法。 版权所有 未经作者同意 请勿使用.
The reading is 7.38 mm. The reading is 7.72 mm.
TEXAS NODAL (ERCOT REVISIONS)
Midpoint Project Review P10454 VAD Test Loop
به نام خدا Blood Circulation 2

Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Circulatory System Section 14.1.
Pressure-Sensing Catheter Calibration
(TYPE HOTEL NAME HERE) HOUSEKEEPING HEROES International Housekeeping
(TYPE HOTEL NAME HERE) HOUSEKEEPING HEROES International Housekeeping
Physical principles of hemodynamic and bioreology
Modify a Worksheet Updated July 29, 2010.
End point Net change with soy supplements vs control (95% CI) p
[ Add your slogan ] PowerPoint Template.
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
A 5. 0 L container has a pressure of 750 mm Hg
Display Week 2017 Exhibitor Survey Revised
(TYPE HOTEL NAME HERE) HOUSEKEEPING HEROES International Housekeeping
(TYPE HOTEL NAME HERE) HOUSEKEEPING HEROES International Housekeeping
2019 Boeing Innovation Challenge
Presentation transcript:

Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 3:  Progress Update  Specifications  Issues

Revised Customer Needs Revised Specifications Began Concept Generation Phase Created list of concept options identifying necessary system “boxes” System sketches incorporating “boxes” Identified key decision areas

Removed specifications with binary measurement Biocompatibility – measure blood damage Drabkin’s Method (g Hgb/100 ml) Arteriole Compliance 2.2 mL/mm P fluid = 100 mm Hg

Specifications: Vascular Resistance Arteriole Compliance System Leak Test Accuracy Concept Generation: 1 Loop vs. 2 Loops Temperature Control Valves – biocompatible, blood damage