Off-grid Dendro Power.

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

PEIP Project Tariff Policy for Water and Wastewater Services.
Ministry of Electricity and Energy General Authority for Rural Electricity Rural Energy Access Project OFF GRID RURAL ELECTRIFICATION Summary of The Project.
Universitas Sumatera Utara Team TWG IV:Renewable Energy Project Development.
WASH Cluster – Groundwater Pumping GWP GWP3 1 Groundwater Pumping Session 3 Pump Selection.
Outline of Feasibility Study on Safer Conventional Housing in Developing Countries in 2005/06 and Proposal of R&D activities Workshop on Safer Conventional.
- P G Ajith kumara.  Introduce strong community/ business concept  Build capacity of non technical aspects  Build capacity of technical Aspects  Identify.
Project ideas for Mozambique Country Context Project 1. Integrated project of electrification using low cost technologies for rural villages and biomass.
Climate Investment Funds SCALING-UP RENEWABLE ENERGY IN LOW- INCOME COUNTRIES (SREP) Investment Plan for Solomon Islands June 2014 Government of Solomon.
DEVELOPMENT AND ENERGY IN AFRICA CASE STUDY FOR ZAMBIA GVEP M&EED Meeting UNEP Risø Center 7 December 2006.
A SUSTAINABLE IMPLEMENTATION OF RURAL ELECTRIFICATION BY GENERATING ELECTRICITY FROM BIOGAS Nelson Mukwaya David Wakyiku Mid-Term Project Presentations.
Master Plan of Electricity Supply for off-grid islands in Sundarbans Indradip Mitra November 2005.
Barriers to Greenhouse Gas Mitigation Options in Developing Economies like Sri Lanka and Strategies to Overcome them Professor Priyantha D.C. Wijayatunga.
Cambodian Energy Sector Development Ministry of Industry, Mines and Energy Vietnam, Ho Chi Minh, 11 November, 2011 Greater Mekong Subregion Fifth Meeting.
2nd International Conference on Micro Perspectives for Decentralized Energy Supply February 27 – March 1,Berlin Germany Designing a Sustainable Model for.
UNCLASSIFIED Department of Economic Development, Jobs, Transport and Resources Victorian Energy Efficiency Target Forum 16 April 2015 Village Roadshow.
The role of community organizations and NGOs in the energy sector Asoka Abeygunawardana Treasurer, Bio Energy Association of Sri Lanka Program Coordinator,
Energy Access in Remote Areas Are Micro & Pico Grids Workable ? Presented By: Ashok Madhukar & Shweta Agarwal Afro-Asian Development Consortium New Delhi.
1.The Background 2.Success stories of darewadi in pune 3.village identified “Bazar Kanung” 4.Requirements 5.Goals 6.Technical Details 7.Benefits 8.Economics.
GreenNet-EU27 Results on WP5: Case studies on RES-E grid integration 1 RES-E Case Study Analyses and Synthesis of Results Dr.-Ing. Derk J. Swider Institute.
 Dr. Ibrahim Togola The challenges of African Energy Policy in the 2010 Berlin,14th June 2010.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Rural Electrification Institutional Experience: Case of TUNISIA Ahmed Ounalli(*) Director, Strategic Studies Group-STEG Energy Week at the World Bank 6-9.
The 8-7 National Poverty Reduction Program in China: the National Strategy and its Impact Wang Sangui, Li Zhou, Ren Yanshun.
Tutorial: IEEE CSI Business Development Workshop Green Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria Ifeanyi.
Exploring Energy Opportunities In India NABC Conference June 29, 2006.
Environment and Energy Htun Paw Oo 1 June Content Environment and Energy Ecosystem services The role of energy Myanmar energy context Way forward.
E8-GEF-UNDESA-UNESCAP Financing Sustainable Electrification South-East Asia Dialogues Bangkok, Thailand, September 8-10, 2009 Pro-Poor Public-Private Partnership.
Energy poverty: Definition No universally accepted definition of minimum energy access Affordability definition: –British: A household is said to be in.
OPPORTUNITIES AND CHALLENGES OF POLICY AND REGULATORY REFORMS IN THE POWER SECTOR IN UGANDA (Cogeneration Development and the Private Forestry Sector Participation.
AFREPREN/FWD Summary of the UPEA II Research Findings By Stephen Karekezi, John Kimani and Oscar Onguru.
Energy Policy and Planning Office The Energy Conservation Promotion Fund for Developing RE Projects in Thailand Pinnara Premcharoen Policy and Plan Analyst.
1 9/15/2015 Gogita Todradze National Statistics Office of Georgia Institutional Arrangements for Energy Statistics in Georgia.
Uzbekistan: towards a employment generation programme Notes for presentation Eduardo Zepeda IPC.
Lilit Melikyan and Hasmik Ghukassyan Almaty 13 April
Energy – Current Status and Policies Shuba V. Raghavan CSTEP Center for Study of Science Technology and Policy 1.
NATUR NÜTZEN. NATUR SCHÜTZEN. Wood Energy – Contracting Projects in the Province of Styria, Austria EUROFORENET Conference, Brussels, 20 th November 2007.
1 Development of Renewable Energy Application in Vietnam Energy and Petroleum Department MINISTRY OF INDUSTRY.
The Three Fundamental Questions What gets produced, and in what quantities? How are these goods produced? For whom are these goods produced ? : We can’t.
Rural Electrification Access by Department of Rural Development
ELECTRIFICATION FOR DEVELOPMENT C T Gaunt University of Cape Town.
EMPLOYMENT CREATION FUND Presented by Burnett Marais.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
1 Introduction on GEOSIM© Vientiane 03 April 2007 Denis RAMBAUD-MEASSON, IED Capacity & Institutional strengthening for rural electrification & development.
Mainstreaming Environment and Poverty Reduction into National Development Process in Kosovo UNDP – UNEP POVERTY AND ENVIRONMENT INITIATIVE Inception Workshop.
Increasing Access to Energy for poor and rural development Dr. Jyoti Parikh IRADe 28 th July 2006.
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
Distributed Generation and Energy Storage in the Philippines Rafael L. Abergas Manager Planning and Technical Services Department Small Power Utilities.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Presentation to Joint Budget Committee on: Urban Renewal and Rural development NATIONAL DEPARTMENT OF HOUSING.
Gender Equality and Energy: Opportunities for Accelerated Sustainable Development Dominique Lallement World Renewable Energy Congress Glasgow. July 20.
CSD-14 Partnerships Fair – May 2006 Global Village Energy Partnership ENERGY FOR POVERTY REDUCTION IN FRANJA TRANSVERSAL DEL NORTE - GUATEMALA.
INTERNATIONAL RENEWABLE ENERGY AGENCY IRENA Renewables Readiness Assessment Comparative Analysis Silia Kilepoa Ualesi Suva, Fiji Islands 13 November 2015.
Cash for Repair & Reconstruction Project, Sri Lanka 1 November 16 / 2006 Cash for Rehabilitation Home owner driven housing reconstruction project in Sri.
Myanmar: Toward Universal Access to Electricity by Role of Minihydro Xiaoping Wang Senior Energy Specialist World Bank July 30, 2015.
GOVERNMENT OF THE KINGDOM OF LESOTHO Water and Sewerage Company (WASCO) Greater Maseru Water Supply Feasibility Study & Preliminary Design Results of Financial.
Rural Electrification Programme
Economic Comparison off Grid System. Q1 : Sizing of Solar Panel System Let us consider that one house needs following loads; 10W, 2 lamps for 3 hours.
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
PROJECT PROFILE Name of the ProjectDir Area Support Project (DASP) Name of the ProjectDir Area Support Project (DASP) Project Area7 Tehsils of District.
Current Electrified Villages Sagaing Region Townships - 11 Villages - 91 Households Kayin State Townships - 5 Villages Households
Support for the SDDX Program: Training for Renewable Energy Service Companies Beijing JKD Renewable Energy Development Center 8 th June, 2005.
Prof. Anoja Wickramasinghe University of Peradeniya
Monkey Point Case Study June 2009.
1 KNOWLEDGE SHARING ON SOME COMMUNITY BASED RENEWABLE ENERGY PROJECTS IN THAILAND CHARTDANAI.
Regional Perspectives of Community-Based Energy
Rwanda: Energy Access Diagnostic Results Based on Multi-Tier Framework
Vivekananda Institute of Biotechnology Sri Ramkrishna Ashram, Nimpith South 24-Parganas, West Bengal Phone: ; Fax: ,
Economic Energy: Ensuring Access to Energy
Isaac Sokopo Group Electrification Planning Manager
Presentation transcript:

Off-grid Dendro Power

Sri Lanka About 1 - 1.5 million households in Sri Lanka will be left without grid-connected electricity.

Off-grid electricity generating technologies The approximate cost comparison Installation costs per 1kW Micro-hydro Rs 200,000 Dendro Rs 300,000 Bio-gas Rs 300,000 Wind Rs 600,000 Solar PV Rs 1,000,000

Step 1: Moneragala District participatory workshop for sensitising the district government officials, community based organisations and farmer groups - Nov 2001 Step 2: Pre-feasibility studies in four off-grid villages Step 3: Cross checking with CEB grid extension plans Step 4: Selection of a village for the feasibility study

Pilot Dendro Power Project in Wadakahakiula

Overall objective of the feasibility study To examine whether necessary social conditions for setting up the proposed pilot plant exist in the village of Wadakahakiula. An implementation plan should be developed with the active participation of intended beneficiaries and other stakeholders. Wadagahakiula Project feasibility study: 2002 December

Necessary conditions Social acceptability of the community Availability of the infrastructure for operation and maintenance of the plant, Affordability of majority of the population to pay for electricity, Enthusiasm of the community To identify fuel-wood species To assess the availability of fuel-wood in required quantities for operation of the dendro power plant. To assess the potential for growing the fuel-wood if required

Necessary conditions To review and select the most appropriate energy conversion technology To develop preliminary design of the dendro powered electrification system To develop, the institutional mechanisms necessary for implementation and post implementation management To prepare cost estimates of the project To establish a tariff structure for sustainable operation and management of the power plant

Study Methodology Social assessment – 2day participatory workshop with 60 households Questionnaire based survey of all households – survey carried out by selected village members Fuelwood survey – based on field assessment. Distribution system design – based on field survey Siting of powerhouse – based on technical and social concerns Institutional and management system – developed through a participatory workshop

Profile of the Village Suggested by CEB Uva office Situated in Badalkumbura DS area 3 km away from grid Permanent houses – 38% Semi-permanent houses – 36% Temporary houses – 26% Main source of income – Pepper cultivation (68% of households) Land ownership – 1 to 3 acres per household (74%) Average monthly income – Rs.6000 per household Current monthly expenditure on energy – approximately Rs.500 per household

Project Profile No. of beneficiary households – 100 Max. demand – 250W per house Period of electricity demand – 5 to 7am and 6 to 10pm Main uses of electricity – lighting, TV, Radio, iron Technology – Gasifier system Mode of operation – 100% gas Fuelwood type – Gliricidia (Nanchi) Fuelwood availability – widely grown in the village for fencing and pepper planting

Major Conclusions from the Feasibility Study Community participation is active however there are no well established CBOs exist in the village. Priority list 1- education 2- unemployment 3- electricity Willingness to obtain electricity – 94% of the households. Opportunities exist to initiate income-generating activities. Affordability of households to pay for electricity is high. At least 90% of the households are able become its direct beneficiaries. Availability of natural, human and financial resources is high. Fuelwood supply from existing plantations is more than enough for the plant. Dendro technology is mature for deployment in a village scheme.

Social Risks predicted Grid electricity may come to the village through political interventions. In the event of grid electricity is provided to the village, potential to access grid electricity is high because of the high affordability among people.

Project Parameters Buildings Power house (L x W x H) - 18m x 6m x 6m

Project Parameters Buildings Fuel wood store - 12m x 6m x 4m

Project Parameters Buildings Well (Diameter x depth) - 5m x 6m

Project Parameters Distribution lines Concrete Poles - 450 nos. Three phase length - 600 m Two phase length - 400 m Single phase length - 8100 m Service cables (Insulated) - 4000 m Area targeted electrified - 2 km radius Distribution losses @ 15% net - 4.5 kW Per h/h power allocation - 250 W Cables 1,352,622.00 Poles 1,021,500.00 Labor 112,935.00 Other 51,926.00 Total 2,538,983.00

Project Parameters Power plant capacity - 35 kW Net out put - 30 kW Prime Generator - 10 kVA Machinery System Installation Electrical equipment and installation Accessory Diesel Gen set

Summary - Project Expenses (SLRs) A. Feasibility study 778,077.43 B. Building construction 1,480,939.40 C. Distribution lines 2,538,983.00 D. Machinery installation 3,416,400.00 E. Administrative expenses 1,222,078.30 Total 9,436,478.13 E. Community Contribution 393,950.00

Contributors SLRs 1. UNDP - GEF/SGP 4,226,284.81 2. Ministry of Science and Technology (Machinery) 2,660,000.00 3. RERED 1,800,000.00 Project Preparation 600,000.00 Co-financing 1,200,000.00 4. Uva PC (Cables) 500,000.00 5. EF 250,193.32 Total 9,436,478.13

Dendro Power plant

Project Parameters No of households Planned - 100 Currently connected - 58 Total h/h requirements - 25 kW Operation hours per day - 6 hours (4.45 a.m. to 6.45 a.m. & 6.30 p.m. to10.30 p.m.) Fuel wood species - Gliricidia Sepium Fuel wood requirement - 60kg/ hr Fuel wood supplying area (Existing Plantations) - 2 km radius

Running Cost 1. Month - 15th April to 14th May 2005 (58 families) Operating hours - 4 hours (6.30 pm to 10.30 pm) Fuel wood - Rs. 11,250 Diesel (3Lts / hr) - Rs. 2,000 Wages - Operator & Helper - Rs. 11,000 Maintenance fund - Rs. 5,000 Society - Rs. 1,000 Total - Rs. 30,250 Monthly Electricity bill per household - Rs. 356 (84 houses) Average income per household for supplying fuel wood - Rs. 70 2. Estimated cost for the month 15th May 2005 to 14th June 2005 Operating hours - 6 hours Fuel wood - Rs. 16,875 Diesel (3Lts / hr) - Rs. 4,000 Wages - Operator & Helper - Rs. 15,625 Maintenance fund - Rs. 5,000 Society - Rs. 1,000 Total - Rs. 42,500

Fuel wood Monthly Electricity bill per household - Rs. 500 Price of fuel wood at Farm gate - Rs. 200/ m3; Rs. 1/ kg Price of fuel wood at Power house gate - Rs. 375/m3; Rs 1.88/kg Monthly payment for fuel wood transportation - Rs. 7,875 Average income per household for supplying fuel wood - Rs. 106

Issues The confrontation between the fuel wood supplier and the farmers. President of the society did not get the electricity from the system Rumor - politicians promises for grid electricity supply Plant is not for the community but for the EF -being a fully funded project The consumers concerns on high electricity bill Resentment among some of the consumers regarding the operator and helper The enthusiasm among the others in the dendro sector regarding the project

Affordability of the households to pay for electricity Total monthly cost incurred by a rich family on three energy items (Kerosene, dry battery and car battery) is approximately Rs.563/- An average family, the monthly cost is around Rs.521/-. The poor families spend approximately Rs.293/- per month. At least the rich and the average families who constitute the majority of the families in the three hamlets are able to afford to pay for their electricity consumption if the cost to be incurred by them is in the range of Rs.400-500 per month. If other social benefits that a household would accrue from using electricity such as better lighting, reduced risks of accidents, use of other electric appliances, social status etc. are also added to this economic cost, household expenditure on electricity is very much compensated and justified.

Possible options Allow the community to explore the possibility of grid extension Allow the community to explore the possibility of getting subsidy from any agency Forget injustice and have a compromise with the supplier Explore the possibility of introducing an income generating activity using day time power to lift the burden on the consumer Please give us 3 more months to rectify the situation.

Possible future options for off-grid dendro power (We have a market of 20,000 villages) Try to establish a household level electrical appliance package to reduce the capacity Try to integrate an income generating activity at the initial stage itself Follow the grid connected dendro and approach the off-grid villages which provide fuel wood to grid dendro plant