The German Critique  Narrow rather than comprehensive  Uses wrong cost drivers  Unwillingness to rely on statistical cost measures and estimates  Poor.

Slides:



Advertisements
Similar presentations
Building Competitive Advantage through Functional Level Strategy
Advertisements

Inventory Management, Just-in-Time, and Simplified Costing Methods
Strategic Decisions (Part II)
Reengineering Infsy 540 Dr. R. Ocker. Reengineering n "Reengineering is the fundamental rethinking and radical redesign of business processes to achieve.
Inventory Management, Just-in-Time, and Simplified Costing Methods
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Enterprise Resource Planning MPC 6 th Edition Chapter 1a.
17–1. 17–2 Chapter Seventeen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
PERFORMANCE MEASUREMENT SYSTEMS Responsibility Budgeting & Accounting.
INTRODUCTION TO BUSINESS
Operations Management Just-in-Time Systems Supplement 12
Strategy & Structure Aligning administrative, responsibility, and account structures to accomplish organizational purpose in big organizations.
4. Building Competitive Advantage Through Functional-Level Strategy
MARKETING INFORMATION PERFORMANCE MEASUREMENT SYSTEMS.
Next page ALTERNATIVE BUDGET FORMATS AND BUDGET & CONTROL REFORMS BUDGETING & PERFORMANCE RESPONSIBITY BUDGETING ENTERPRISE RESOURCE PLANNING BALANCED.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
© 2007 Prentice Hall, Inc. All rights reserved.7–1 Chapter 7 Operations Management and Quality.
MARKETING INFORMATION PERFORMANCE MEASUREMENT SYSTEMS.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Management 11e John Schermerhorn
Chapter 18 Exercises Process Costing. In-Class Exercise (Form groups and work exercise): Exercise No. Page Handout Equivalent Units (Use the format,
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
Management Accounting in a Changing Environment Chapter Fourteen.
Management Accounting in a Changing Environment
1 TRADITIONAL PRODUCT COSTING METHODS Accounting Principles II AC Fall Semester, 1999.
Operations Management
Lean Systems and Six-Sigma Quality
Managing Quality and Time to Create Value
PowerPoint Presentation by Charlie Cook Copyright © 2005 Prentice Hall, Inc. All rights reserved. Chapter 7 Managing Operations and Improving Quality “There.
Value Analysis/ Flow Analysis
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
Cost in the Long Run How does the isocost line relate to the firm’s production process? 56.
JIT and Lean Operations
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Costing and the Value Chain Chapter 18.
So What? Operations Management EMBA Summer TARGET You are, aspire to be, or need to communicate with an executive that does not have direct responsibility.
Value-Based Systems: ABM and Lean 22. Value-Based Systems and Management OBJECTIVE 1: Explain why managers use value-based systems and discuss their relationship.
Job-Order Costing for Manufacturing & Service Companies
Chapter 7 The Cost of Production. ©2005 Pearson Education, Inc. Chapter 72 Topics to be Discussed Measuring Cost: Which Costs Matter? Cost in the Short.
Organizational Agility Chapter 09 Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Ch. 9: Organizational Agility: The Responsive Organization
- For 6 th Semester Job Design, Production and Operations Standards, and Work Measurement.
Organizational Agility Chapter 09 Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
Operations Management $100 Production Method Cost and Revenue Quality Assurance Location Production Planning $200 $300 $400 $500 $400 $300 $200 $100 $500.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 Lean Operations.
LEAN MANUFACTURING.
 Copyright, Ansari, Bell, Klammer and Lawrence, Management Accounting: A Strategic Focus, Irwin-McGraw-Hill, Production Methods v Craft v Mass v.
7 chapter Business Essentials, 7 th Edition Ebert/Griffin © 2009 Pearson Education, Inc. Operations Management and Quality Instructor Lecture PowerPoints.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
Chapter 16 Managing costs and quality
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
Lean Production. Lean production Lean production refers to the range of measures that can be put in place in the workplace to help reduce waste. Although.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
Level 2 Business Studies AS90843 Demonstrate understanding of the internal operations of a large business.
Configuration of Elements COMPETITIVE STRATEGY MANUFACTURING STRATEGY STRUCTUREENVIRONMENT PERFORMANCE.
MANAGEMENT ACCOUNTING
The nature of operations
Inventory Management, Just-in-Time, and Simplified Costing Methods
Management Accounting in a Changing Environment
ISA 201 Intermediate Information Systems Acquisition
Lean Production.
Lean Production.
Basic Concept of 5S-KAIZEN-TQM Approach
MGS 4020 Business Intelligence LSS Jul 19, 2018
Activity-Based Systems
Fundamental Cornerstones of Managerial Accounting Chapter Six
PRODUCTION AND OPERATIONS MANAGEMENT
Organizational Agility
Lean Production.
Presentation transcript:

The German Critique  Narrow rather than comprehensive  Uses wrong cost drivers  Unwillingness to rely on statistical cost measures and estimates  Poor averaging, especially temporal averaging  Failure to distinguish between needs of financial reporting and management control

The Japanese Critique I  Importance of inventories and overheads, insignificance of labor hours  Quality – Solution: manage process through product design and process value management so as to minimize the discrepancy between Process time and Cycle time [inefficiency = 1 – (PT/CT)]

Process value analysis (PVA) Chart the flow of activities needed to design, create, and deliver a service For each activity and step within the activity determine its associated cost and its cause Determine how the step adds value or, if it is non-value adding, identify ways to eliminate it and its associated cost; Determine the cycle time of each activity and calculate its cycle efficiency (value-added time/total time); and Seek ways to improve cycle efficiency and reduce associated costs due to delays, excesses, and unevenness in activities.

Business Process Reengineering Jobs should be designed around an objective or outcome instead of a single function; Functional specialization and sequential execution are inherently inimical to expeditious processing; Those who use the output of activity should perform the activity and the people who produce information should process it, since they have the greatest need for information and the greatest interest in its accuracy; Information should be captured once and at the source; Parallel activities should be coordinated during their performance, not after they are completed; The people who do the work should be responsible for decision making and control built into job designs

Reflects Assumptions of Flexible Production  Nobody but the front-line worker adds value,  Front-line workers can perform most functions better than specialists (lean manufacturing),  Every step of the service delivery process should be done perfectly (TQM)  This reduces the need for buffer stocks (JIT) and produces a higher quality end-product.

Modern IT: reduced economies of scale and scope –Multidisciplinary teams, members work together from start of job to completion –push exercise of judgment down to teams that do an organization's work –more equal distribution of knowledge, authority, and responsibility –average firm size falling for the last twenty years