Action Who Progress made status Implement central repository for drawings -- need detector information to add to official drawing WL Progress on-going.

Slides:



Advertisements
Similar presentations
1 AFSWG Mtg 15 Aug 2003 Elwyn Baynham RAL Safety Overview Work done by RAL Group Contributors Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov.
Advertisements

Liquid Hydrogen Absorber
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
Progress on the MICE Cooling Channel Solenoid Magnet System
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Issues concerning the Design of the Tracker Solenoids Michael A. Green Lawrence Berkeley National Laboratory 17 August 2005.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE RF Module Safety Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting February 12, 2005.
MICE Collaboration meeting at LBNL: 9 ~13 th Feb, 2005 Force reaction analysis Stephanie Yang Feb 10 th, 2005.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
1 MICE hydrogen system layout. 2 MICE hydrogen system layout (2)
Report from meeting Hydrogen system operation from cryocooler and level control Cryocoolers for MICE Tom Bradshaw Elwyn Baynham Yury Ivanyushenkov Rutherford.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
MICE Collaboration meeting at Berkeley 9 – 12 February 2005 AFC Module progress Presented by Wing Lau --with input from AFC group members.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
MICE Collaboration Meeting 17 CERN 21 – 25 Feb 2007 Summary on Magnet & MICE Integration talks By Oxford University.
bobbin Thermal radiation shield Magnet cryostat Large End Flange The leading dimensions.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.
Phone meeting on PID Detectors 25 Jan 2006 Implementation of PID detectors in the general MICE layout By Wing Lau, Oxford.
A reminder of the outstanding action list:- Implement central repository for drawings – need detector information to add to official drawing Instrumentation.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module progress update Wing Lau – Oxford.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
MICE AFC Group phone conference on 27 January 2005 AFC module progress By Wing Lau, Oxford.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
MICE Collaboration Meeting 15 Fermilab MICE Integration By Oxford University.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
Liquid-hydrogen absorber: Shigeru Ishimoto KEK Contents (1)Introduction (2)MICE absorber design (3)Prototype absorber test at KEK (4)MICE absorber instrumentation.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
MICE collaboration meeting Osaka 1 – 4 August 2004 AFC Module update & Plan Presented by Wing Lau -- Oxford University.
Project manager report paul drumm CM16 October 2006.
MICE Integration Engineering Jason Tarrant - STFC l Contents »South Mezzanine change summary »Integration Envelope Model »A/C Move »Maus Geometry »AFC.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
1 Layout and Installation MICE Collaboration Meeting, RAL, October 27-29, 2004 Elwyn Baynham, Tom Bradshaw, Paul Drumm, Matthew Hills, Yury Ivanyushenkov,
Spectrometer Solenoid Overview Roy Preece 31 st January 2011.
MICE Collaboration Meeting RAL 31 May – 3 June 2009 AFC status By Wing Lau, Oxford University.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
1 Search for Worst-Case Forces MICE Video Conference, September 8, 2004 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department,
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
CLOSING REMARKS. Following the Review Charge Cryo-Design  Review and comment on the overall cooling circuit and overall cryo-design. u Temperature Margin.
1 MICE absorbers work package MPB – 27/10/15 Mike Courthold Mark Tucker Phil Warburton Steve Watson.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
Integration of the Spectrometer Solenoid Magnets
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Experimental equipment Edgar L. Black February 17, 2019
Presentation transcript:

Action Who Progress made status Implement central repository for drawings -- need detector information to add to official drawing WL Progress on-going. Liasing with Ghislain on CKOV2 drawings; Maurizio on the TOFs and Tortora on Calorimeter etc Also with Geoff Barber on Tracker mechanicals. On- going Instrumentation for absorbers must be specified and incorporated into design (temperature sensors, liquid level sensors, …) SI Check minimum gap between AFC & Tracker solenoid Module -- Also check for floor bolting at various stages WL / UB FEA done. Floor loading seems reasonable for the AFC module. A meeting is being held on the 14 th Jan at RAL to discuss implication. Will check with Ulissee on how he get on with his calc on gap distance On going Continue working to define worst-case magnet forces and collect magnet design notes into design report MG Define absorber heater implementation YI / SI Revise absorber vent pipe size to make it adequate for He case WL Agreed to increase this to 15mm diameter. Drawing being updated done Get RAL seismic design criteria and verify that designs meet them WL/ PD On- going Status of Progress

Action Who Progress made status Evaluate stresses at module interconnect flanges and bolts SV Define RFCC module tie-in to rail system SV Work out gusset arrangement to transfer CC forces to RFCC module vacuum shell. SV Evaluate the need for redundant LH2 relief paths EB / TB Evaluate merits of cryocooler heater vs. 3-stage cooler w/o heater MG Evaluate absorber heat load with more realistic assessment of surrounding temperatures (is proposed MLI adequate?) EB/ MG/ SY Raised in the meeting between RAL & Oxford on 4 Nov. Action plan was outlined. Little progress made so far. Could Elwyn please follow up progress Finalize interface between radiation shield and detector module - must forces be transmitted WL Stephanie has done the calc. Will discuss this at the RAL meeting on the 14 th Jan. On- going Consider participation in KEK and/or Fermilab absorber tests (some coordination maybe called for) YI / SI Evaluate magnet interaction during quench -- does one quench induce others EB / MG Raised in the meeting between RAL & Oxford on 4 Nov. MG agreed to work with Holger on this. Some progress made. Mike Green needs to monitor progress Raise Change note on the radiation shield design SY / WL Done

Action Who Progress made status Window QC – round robin exercise WL Still awaiting for the window to be released from Fermilab. This is ridiculous and we need to do something soon to get this going stalled Understand QC requirements for absorber windows and assign oversight responsibility WL Need to discuss with the group on who is the best person to do this On going Hydrogen system R&D TB / EB