Comparison of Power Depositions Xiaoping Ding UCLA Target Studies Jul. 13, 2010.

Slides:



Advertisements
Similar presentations
Comparison of Particle Production between MARS and FLUKA (Update) X. Ding, UCLA Target Studies Aug. 8, /8/13.
Advertisements

SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 1. N. Souchlas BNL (Oct. 5, 2010)
IDS120j WITH/WITHOUT GAPS SH#4 AZIMUTHAL DPD DISTRIBUTION ANALYSIS Nicholas Souchlas, PBL (3/14/2012) 1.
6/30/20091 Meson Production with Different Directional Incident Proton Beam X. Ding, D. Cline, UCLA H. Kirk, J. S. Berg, BNL.
Meson Production at 8 GeV for IDS120h X. Ding, UCLA Target Studies, Dec. 27, 2011.
Meson Production Comparison between Hg and Ga at 8 GeV X. Ding, UCLA Target Studies, Oct. 04, 2011.
Meson Production Comparison between HG and GA at 8 GeV (Update) X. Ding, UCLA Target Studies, Oct. 18, 2011.
Particle Production of a Carbon/Mercury Target System for the Intensity Frontier X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Spring.
Operated by Brookhaven Science Associates for the U.S. Department of Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D.
Pion capture and transport system for PRISM M. Yoshida Osaka Univ. 2005/8/28 NuFACT06 at UCI.
Energy Deposition of 4-MW Beam Power in a Mercury Jet Target Xiaoping Ding UCLA Target Studies Meeting, Feb. 9, 2010.
MC/NF TARGET SHIELDING STUDIES. NICHOLAS SOUCHLAS (10/29/2010)‏ 1.
Proton Position Tracking X. Ding, D. Cline UCLA H. Kirk, J. S. Berg, BNL Phone Meeting on Aug. 25, 2009.
Harold G. Kirk Brookhaven National Laboratory Meson Production Efficiencies IDS Target Meeting CERN December 17, 2008.
1 Meson Production Simulations X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL N u F a c t th International Workshop on Neutrino Factories, Superbeams.
SHIELDING STUDIES FOR THE MUON COLLIDER TARGET NICHOLAS SOUCHLAS BNL Nov 30, 2010 ‏ 1.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
Optimization of Target Parameters for a Tungsten Target (Half Density) at 8GeV X. Ding Target Studies Nov. 2, 2010.
Energy Deposition of 4MW Beam Power in a Mercury Jet Target Xiaoping Ding UCLA Target Studies Mar. 9, 2010 (Update of talk on Feb. 9, 2010)
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
1 Comparison of Power Depositions X. Ding, D. B. Cline, UCLA H. Kirk, J. S. Berg, BNL Collaboration Meeting July 2, 2010.
Proton Position Tracking X. Ding, UCLA Aug. 11, 2009.
Comparison of Power Deposition in SC1 Coil Xiaoping Ding UCLA Target Studies Jun. 29, 2010.
Power Deposition in SC1 Coil Xiaoping Ding UCLA Target Studies Apr. 20, 2010.
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3. NICHOLAS SOUCHLAS (10/28/2010)‏
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
IDS120h POWER DEPOSITION AND Hg POOL STUDIES Nicholas Souchlas (7/26/2011) 1.
STUDY II: m1507 vs. m1510 IDS120f: m1507/MCNP vs. M1510/MCNP vs. FLUKA IDS120f vs. IDS20g GEOMETRY IDS90f: B10/B11 SHIELDING RING(S) STUDIES Nicholas Souchlas.
Target and Absorbers L2 Manager: K McDonald, Princeton U March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Mission Target:
Harold G. Kirk Brookhaven National Laboratory A MW Class Target System for Muon Beam Production AAC 2014 San Jose, Ca July 14-18, 2014.
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 1..
Meson Productions for Target System with GA/HG Jet and IDS120h Configuration X. Ding (Presenter), D. Cline, UCLA H. Kirk, J.S. Berg, BNL Muon Accelerator.
Energy deposition for intense muon sources (chicane + the rest of the front end) Pavel Snopok Illinois Institute of Technology and Fermilab December 4,
IDS120j WITHOUT GAPS AND WITH MAXIMUM SIZE GAPS ( aka ''NIGHTMARE'' CASE SCENARIO ) SC#4, SC#7 AZIMUTHAL DPD DISTRIBUTION ANALYSIS. Nicholas Souchlas,
K. McDonald Target Studies Meeting June 29, Materials for the Target System Internal Shield K. McDonald Princeton U. (June 27, 2010) Iron Plug Proton.
IDS120h GEOMETRY WITH MODIFIED Hg POOL VESSEL. SIMULATIONS FOR 60%W+40%He SHIELDING (P12 'POINT') WITH STST SHIELDING VESSELS EFFECTS OF Be WINDOW WATER.
SHIELDING STUDIES FOR THE MUON COLLIDER TARGET. (From STUDY II to IDS120f geometries) NICHOLAS SOUCHLAS (BNL)‏ ‏ 1.
Shifting the Position of Focal Point of Proton Beam Relative to Intersection Point with Fixed Emittance for IDS120h Configuration X. Ding, UCLA Target.
DEPOSITED POWER STUDIES FOR THE MC/NF TARGET STATION. Nicholas Souchlas (PBL) (MAP CONFERENCE SLAC 2012) 1 DEPOSITED POWER STUDIES FOR THE MC/NF TARGET.
1 Energy Deposition of 4MW Beam Power in a Mercury Jet Target X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL The International Design Study for the.
IDS120j WITH GAPS SC#3 AZIMUTHAL DPD DISTRIBUTION ANALYSIS WITH MAX GAPS SC#3, SC#4 AZIMUTHAL DPD DISTRIBUTION ANALYSIS, DP AND SC TOTAL DP WITH VARYING.
IDS120h GEOMETRY WITH MODIFIED Hg POOL VESSEL. SIMULATIONS FOR 60%W+40%He SHIELDING (P12 'POINT') WITH STST SHIELDING VESSELS. BP#1(STST/W), SH#1, BeWindow,SC#8.
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE mars1510 ( DESKTOP ) vs. mars1512 ( PRINCETON CLUSTER ) Nicholas Souchlas, PBL (3/28/2012) 1.
Particle Production of Carbon Target with 20Tto2T5m Configuration at 6.75 GeV (Updated) X. Ding, UCLA Target Studies April 3, /3/14.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
Beam Dump for Carbon Target with IDS120h Configuration at 6.75 GeV (Updated) X. Ding, UCLA Target Studies Jan. 24, /24/14.
Particle Production with Carbon Target and IDS120j Configuration at 3 GeV (update) X. Ding, UCLA Target Studies Nov. 14, /14/13.
Meson Production of Carbon Target at 3 GeV X. Ding, UCLA Target Studies 17/18/13.
Carbon Target Design and Optimization for an Intense Muon Source X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Winter Collaboration.
IDS120j WITHOUT RESISTIVE MAGNETS ( 20 cm GAPS AND 15.8 g/cc W BEADS ) AZIMUTHAL DPD DISTRIBUTION STUDIES FOR: BP#1, SH#1, SHVS#1/LFL, SC#1+SC#2, BeWind.
Multiprocessing/MARS15(2012)/Princeton Cluster (IDS120j w/t Resistive Magnets: New Hg Module) X. Ding UCLA (4/11/2013)
IDS120j WITHOUT RESISTIVE MAGNETS MODIFYING Hg MODULE Nicholas Souchlas, PBL (11/1/2012) 1.
IDS120j WITH AND WITHOUT RESISTIVE MAGNETS PION AND MUON STUDIES WITHIN TAPER REGION, III ( 20 cm GAPS BETWEEN CRYOSTATS ) Nicholas Souchlas, PBL (9/4/2012)
Meson Production at Low Proton Beam Energy (Update) X. Ding, UCLA Target Studies May 9, /9/113.
IDS120i GEOMETRY. SIMULATIONS FOR 60%W+40%He SHIELDING WITH STST SHIELDING VESSELS. Hg vs. Ga DEPOSITED POWER DISTRIBUTION. (using Ding's optimized parameters)
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BEAM PIPE BEYOND FIRST CRYOSTAT ( 20 cm GAPS AND 15.8 g/cc W BEADS ) Nicholas Souchlas, PBL.
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BP#2 WITHIN FIRST CRYOSTAT AND RIGHT FLANGE OF Hg POOL INNER VESSEL ( 20 cm GAPS AND 15.8 g/cc.
Ids120h_side. ids120h_top ids120h_iso ids120h_end.
BNL solenoid capture workshop: magnet challenges are not trivial Summarized by Tengming Shen
SHIELDING STUDIES FOR IDS80 (NO IRON PLUG/YOKE), ADDING SHIELDING IN 75 TO 80 cm (WC/H 2 O, B, Cd). NICHOLAS SOUCHLAS (BNL) Dec. 14, 2010‏ ‏ 1.
ENERGY FLOW AND DEPOSITION IN A 4-MW MUON-COLLIDER TARGET SYSTEM
IDS120h: PROTON P0-P14 TRAJECTORY FOOTPRINT
X. Ding, UCLA MAP Spring 2014 Meeting May 2014 Fermilab
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE
Beam Window Studies for Superbeams
1 Nicholas Souchlas, PBL (11/15/2011)
1 Nicholas Souchlas (PBL) (MAP CONFERENCE SLAC 2012)
Practice Geometry Practice
Presentation transcript:

Comparison of Power Depositions Xiaoping Ding UCLA Target Studies Jul. 13, 2010

Geometry Standard Shielding: Gray; Enhanced Shielding: Gray+Pink

Power Deposition 8GeV & 4MW Proton beam, Standard Shielding Shielding Material Power Dep. In SC1 (kW) Total Power Dep. In SC1-SC13 (kW) Power Dep. in shielding material (kW) 0.8WC+0.2Water %HG %W W+0.4HG W+0.2HG TA+0.2Water TA+0.4Water TA+0.2HG TA+0.4HG

Power Deposition 8GeV & 4MW Proton beam, Enhanced Shielding Shielding Material SC1 (kW)SC1-SC13 (kW) Shielding material (kW) 0.8WC+0.2Water TA+0.2Water %W W+0.05HG W+0.1HG W+0.15HG W+0.2HG W+0.3HG W+0.4HG W+0.5HG W+0.6HG W+0.7HG W+0.8HG W+0.9HG %HG

Plot of Power Deposition vs the content of W/HG

Power Deposition 8GeV & 4MW Proton beam, Enhanced shielding+downstream(R<=37cm) Shielding Material Power Dep. In SC1 (kW) Total Power Dep. In SC1-SC13 (kW) Power Dep. in shielding material (kW) 0.8WC+0.2Water TA+0.2Water TA+0.4Water %HG %W W+0.2HG TA+0.2HG TA+0.4HG