OM&PM/Class 8b1 ¬Operations Strategy ­Process Analysis ®Lean Operations ¯Supply Chain Management °Capacity Management in Services ±Quality Management –Class.

Slides:



Advertisements
Similar presentations
Statistical Quality Control
Advertisements

Quality Tools and Techniques Standards in Action Quality Tools and Techniques Practicing quality techniques Author:
ArrivalsServiceWaiting line Exit Processing order System Queuing Systems: basic elements.
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 15 Statistical Quality Control.
BMM 3633 Industrial Engineering
HABEEB HATTAB HABEEB Office: BN-Block, Level-3, Room Ext. No.: 7292 H/P No.:
Slide 1 Choosing the Appropriate Control Chart Attribute (counts)Variable (measurable) Defect Defective (MJ II, p. 37) The Lean Six Sigma Pocket Toolbook,
Process Quality & Improvement Module
S. Chopra/Operations/Quality1 Operations Management: Process Quality & Improvement Module u Quality & the Voice of the Customer »What is Quality? »Quality.
OMSAN LOJİSTİK. Top Management Program in Logistics & Supply Chain Management (TMPLSM) Production and Operations Management 7: Improving and Monitoring.
Our Goal Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training Six Sigma Simplicity.
Statistical Process Control A. A. Elimam A. A. Elimam.
1 © The McGraw-Hill Companies, Inc., 2004 Technical Note 7 Process Capability and Statistical Quality Control.
CHAPTER 8TN Process Capability and Statistical Quality Control
The Quality Improvement Model
Quality Management © Holmes Miller 1999 Based on slides for Chase Acquilano and Jacobs, Operations Management, McGraw-Hill.
Control Charts for Attributes
Statistical Process Control (SPC)
Chapter 10 Quality Control McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Goal Sharing Team Training Statistical Resource Leaders (1)
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
9-1 Improve Process Capability The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process.
Irwin/McGraw-Hill 1 TN7: Basic Forms of Statistical Sampling for Quality Control Acceptance Sampling: Sampling to accept or reject the immediate lot of.
5 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Quality And Performance 5.
Rev. 09/06/01SJSU Bus David Bentley1 Chapter 10 – Quality Control Control process, statistical process control (SPC): X-bar, R, p, c, process capability.
Control Charts are tools for tracking variation based on the principles of probability and statistics SPC: Statistical Process Control.
Defects Defectives.
Copyright 2011 John Wiley & Sons, Inc. Chapter 10 Lean Systems and Six-Sigma Quality 10-1.
Statistical Process Control (SPC)
Chapter 9 Quality Management – Focus on 6 Sigma
Process Capability and SPC
Quality Control McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 IES 303 Chapter 5: Process Performance and Quality Objectives: Understand.
Process Quality & Improvement Module u Quality & the Voice of the Customer »What is Quality? »Quality Programs in practice »Voice of the Customer u Process.
Lean Systems and Six-Sigma Quality
SIX-SIGMA QUALITY Chapter Understand total quality management. 2. Describe how quality is measured and be aware of the different dimensions of quality.
Explain Six Sigma Simply (Football story from SSDSI) Six Sigma Simplicity.
1-1 1 Quality Management Chapter Total Quality Management (TQM) Total quality management is defined as managing the entire organization so that.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. 1 Chapter 7 Six Sigma Quality and.
Process Capability and SPC
Process Capability and Statistical Process Control.
Statistical Process Control (SPC) Chapter 6. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Capacity, Facilities, & Work Design.
Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10th Edition. By Jay Heizer & Barry Render.
Operations Management For Competitive Advantage 1 Quality Management Operations Management For Competitive Advantage Chapter 7.
J0444 OPERATION MANAGEMENT Desain Kualitas Pert 9 Universitas Bina Nusantara.
Operations Management
6Sigma Chapter 3. Six Sigma Quality: DMAIC Cycle  Define, Measure, Analyze, Improve, and Control (DMAIC)  Developed by General Electric as a means of.
Customer Expectations Standards Certifications Inspections Packaging Others.
Statistical Quality Control/Statistical Process Control
Statistical Quality Control
Six Sigma Training Dr. Robert O. Neidigh Dr. Robert Setaputra.
2 How to use the seven tools of quality Tools for identifying problems / collecting data Check sheets Scatter diagrams Statistical process control (SPC)
1 Slides used in class may be different from slides in student pack Technical Note 8 Process Capability and Statistical Quality Control  Process Variation.
OPERATIONS MANAGEMENT for MBAs Fourth Edition 1 Meredith and Shafer John Wiley and Sons, Inc. Chapter 3: Controlling Processes Topic 6: Controlling Processes.
Statistical Process Control Production and Process Management.
Quality Control All activities undertaken to control materials, processes and products in order to ensure quality of conformance Detects defects before.
VARIABLE CONTROL CHART : Mean and Dispersion  - Chart  R - Chart  S - Chart.
Chapter 16 Introduction to Quality ©. Some Benefits of Utilizing Statistical Quality Methods Increased Productivity Increased Sales Increased Profits.
Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved. U N I T. 2 RESOURCE PLANNING WORKFORCE CUSTOMER RELATIONSHIPS CAPACITY FACILITIES.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
Statistical Quality Control
Chapter 11 TQM & Quality Tools.
Operations Management
Six Sigma 6.
Chapter 8 Quality Management
Quality Management Six Sigma
Six Sigma. Six Sigma What is Six Sigma? Philosophy: We should work smarter, not harder. Business strategy: We gain a competitive edges in Quality,
BENEFITS OF AUTOMATED SPC
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

OM&PM/Class 8b1 ¬Operations Strategy ­Process Analysis ®Lean Operations ¯Supply Chain Management °Capacity Management in Services ±Quality Management –Class 7b: Quality & the Voice of the Customer –Class 8a: Control Charts & Voice of the Process –Class 8b: Paradigms for Continuous Improvement »Process Capability »Analog Devices & Continuous Improvement »Introduce National Printing Company Operations Management & Performance Modeling

OM&PM/Class 8b2 Class 8a: Key Learning Objectives u The role of variability in evaluating performance u A process –in control has only inherent (from common cause) variation –out of control has variation from an assignable cause u Pareto analysis to identify key causes of error u SPC framework for process control and improvement

OM&PM/Class 8b3 Statistical Process Control: Attribute Measurements (p-Charts)

OM&PM/Class 8b4 Control Chart of errors in Receiving Process

OM&PM/Class 8b5 Errors by Type & Module (Pareto Analysis) 80 % of the errors may be attributed to 20 % of the causes. Number of Errors by Type OtherSlotterLetdownPutawayKeyingITR ADJ Module 1Module 3 Number of Errors by Module

OM&PM/Class 8b6 Control Chart Module 1 Errors

OM&PM/Class 8b7 Module 1 of Receiving Process 1. Calculate average proportion of errors per sample: 2. Calculate the standard deviation of proportion defects per sample of 400: 3. Calculate control limits: 4. Plot control chart with control limits 400*(UCL, LCL) = (20.52, 1.08) Module 1 is out of control

OM&PM/Class 8b8 Module 1 Errors by Type Number of Errors by type in Module SlotterOtherLetdownPutawayKeyingITR ADJ Error Types

OM&PM/Class 8b9 Process Capability Voice of the CustomerVoice of the Process Process Capability = How well is process capable of meeting customer specifications? è For the Receiving process, customer specifications require no more than 2% errors on any given day. u Proportion of days where errors are beyond customer specifications =

OM&PM/Class 8b10 Process Capability: Sigma or ‘z’ Capability u Sigma capability is the number of standard deviations from the mean to the closest specification limit. u Sigma capability of Receiving process = u What if Receiving is to become a 3-Sigma process? –Target mean = –Target standard deviation =

OM&PM/Class 8b11 Improving Process Capability LSLUSL  = LSLUSL  = 10 LSLUSL  = LSLUSL  = %

OM&PM/Class 8b12 Magnitude of Difference Between Sigma Levels

OM&PM/Class 8b % Suppliers u At least 20,000 wrong prescriptions per year u More than 15,000 newborns dropped by doctors or nurses u No electricity, water or heat for 8.6 hours each year u No telephone service or TV transmission for nearly 10 minutes each week u Two short (or long) landings at O’Hare each week

OM&PM/Class 8b14 Why 6-Sigma? u Impact of # of parts/stages in a process u Impact of mean shift

OM&PM/Class 8b15 Relationship Between Sigma Capability, Proportion Defects, and C pk LSL mUSL z 

OM&PM/Class 8b16

OM&PM/Class 8b17 ADI Stock Price Performance

OM&PM/Class 8b18 Key learning objectives: Analog Devices u Methods to drive improvement –visibility: expose the rocks(“mgt. by sight”) –exploratory stress: crisis(“mgt. by stress”) –set standards: half live(“mgt. by stretch”) u Short term performance evaluation of complex organizations requires a balanced scorecard u Operational improvement needs to be converted into financial improvement

OM&PM/Class 8b19 Class 8b: Key Learning Objectives: SPC u Specification limits: Voice of the customer u Control limits used to verify if process is in control (internal), i.e., is maintaining capability: Voice of the process u Process capability is a measure of the quality delivered (external): links VoP with VoC u Improving capability may require variability reduction and/or mean shift u Reducing number of stages/parts improves capability

OM&PM/Class 8b20 Continuous Improvement: PDCA Cycle (Deming Wheel) Institutionalize the change or abandon or do it again. Execute the change. Study the results; did it work? 1. Plan 2. Do3. Check 4. Act Plan a change aimed at improvement.

OM&PM/Class 8b21 Process Improvements at Analog July 1, 1987 July 1, 1990 Average Yields July 1, 1987 July 1, 1990 Manufacturing Cycle Time Defects 51% 20% 15 weeks 7 weeks 500 ppm 50 ppm

OM&PM/Class 8b22 Target Half-Lives

OM&PM/Class 8b23 Continuous Improvement: Benchmarking 1. Identify those processes needing improvement. 2. Identify a firm that is the world leader in performing the process. 3. Contact the managers of that company and make a personal visit to interview managers and workers. 4. Analyze data