Operated by Brookhaven Science Associates for the U.S. Department of Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D.

Slides:



Advertisements
Similar presentations
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 1. N. Souchlas BNL (Oct. 5, 2010)
Advertisements

1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
Magnetic Configuration of the Muon Collider/ Neutrino Factory Target System Hisham Kamal Sayed, *1 H.G Kirk, 1 K.T. McDonald 2 1 Brookhaven National Laboratory,
POSTER TEMPLATE BY: Presentations.com POSTER TEMPLATE BY: Presentations.com Outlet Inlet n’=375 n=150 n φ =75 (dφ=1.2 ⁰ ) Extra Terms.
6/30/20091 Meson Production with Different Directional Incident Proton Beam X. Ding, D. Cline, UCLA H. Kirk, J. S. Berg, BNL.
Meson Production at 8 GeV for IDS120h X. Ding, UCLA Target Studies, Dec. 27, 2011.
Meson Production Comparison between Hg and Ga at 8 GeV X. Ding, UCLA Target Studies, Oct. 04, 2011.
Meson Production Comparison between HG and GA at 8 GeV (Update) X. Ding, UCLA Target Studies, Oct. 18, 2011.
Particle Production of a Carbon/Mercury Target System for the Intensity Frontier X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Spring.
Pion capture and transport system for PRISM M. Yoshida Osaka Univ. 2005/8/28 NuFACT06 at UCI.
Energy Deposition of 4-MW Beam Power in a Mercury Jet Target Xiaoping Ding UCLA Target Studies Meeting, Feb. 9, 2010.
MC/NF TARGET SHIELDING STUDIES. NICHOLAS SOUCHLAS (10/29/2010)‏ 1.
Proton Position Tracking X. Ding, D. Cline UCLA H. Kirk, J. S. Berg, BNL Phone Meeting on Aug. 25, 2009.
Harold G. Kirk Brookhaven National Laboratory Meson Production Efficiencies IDS Target Meeting CERN December 17, 2008.
1 Meson Production Simulations X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL N u F a c t th International Workshop on Neutrino Factories, Superbeams.
SHIELDING STUDIES FOR THE MUON COLLIDER TARGET NICHOLAS SOUCHLAS BNL Nov 30, 2010 ‏ 1.
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
Optimization of Target Parameters for a Tungsten Target (Half Density) at 8GeV X. Ding Target Studies Nov. 2, 2010.
Energy Deposition of 4MW Beam Power in a Mercury Jet Target Xiaoping Ding UCLA Target Studies Mar. 9, 2010 (Update of talk on Feb. 9, 2010)
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
1 Comparison of Power Depositions X. Ding, D. B. Cline, UCLA H. Kirk, J. S. Berg, BNL Collaboration Meeting July 2, 2010.
Proton Position Tracking X. Ding, UCLA Aug. 11, 2009.
Comparison of Power Deposition in SC1 Coil Xiaoping Ding UCLA Target Studies Jun. 29, 2010.
Power Deposition in SC1 Coil Xiaoping Ding UCLA Target Studies Apr. 20, 2010.
Above: Power deposition in the superconducting magnets and the tungsten-carbide + water shield inside them, according to a FLUKA simulation Approximately.
Above: On-axis field profiles of resistive, superconducting and all magnets, and bore-tube radius r = 7.5 (B/20T) −½ cm. Above: Hoop strain ε θ in resistive.
Operated by Brookhaven Science Associates for the U.S. Department of Energy Optimized Parameters for a Mercury Jet Target X. Ding, D. Cline, UCLA, Los.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3. NICHOLAS SOUCHLAS (10/28/2010)‏
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
Target and Absorbers L2 Manager: K McDonald, Princeton U March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Mission Target:
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
Harold G. Kirk Brookhaven National Laboratory A MW Class Target System for Muon Beam Production AAC 2014 San Jose, Ca July 14-18, 2014.
Meson Productions for Target System with GA/HG Jet and IDS120h Configuration X. Ding (Presenter), D. Cline, UCLA H. Kirk, J.S. Berg, BNL Muon Accelerator.
SHIELDING STUDIES FOR THE MUON COLLIDER TARGET. (From STUDY II to IDS120f geometries) NICHOLAS SOUCHLAS (BNL)‏ ‏ 1.
Shifting the Position of Focal Point of Proton Beam Relative to Intersection Point with Fixed Emittance for IDS120h Configuration X. Ding, UCLA Target.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
Harold G. Kirk Brookhaven National Laboratory Target Considerations for Nufact and Superbeams ISS Meeting RAL April 26, 2006.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
DEPOSITED POWER STUDIES FOR THE MC/NF TARGET STATION. Nicholas Souchlas (PBL) (MAP CONFERENCE SLAC 2012) 1 DEPOSITED POWER STUDIES FOR THE MC/NF TARGET.
1 Energy Deposition of 4MW Beam Power in a Mercury Jet Target X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL The International Design Study for the.
Proton Delivery to Target Keith Gollwitzer Accelerator Division Fermilab MAP 2012 Winter Meeting March 7, 2012.
Gallium as a Possible Target Material for a Muon Collider or Neutrino Factory X. Ding, D. Cline, UCLA, Los Angeles, CA 90095, USA J.S. Berg, H.G. Kirk,
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE mars1510 ( DESKTOP ) vs. mars1512 ( PRINCETON CLUSTER ) Nicholas Souchlas, PBL (3/28/2012) 1.
Meson Production of Carbon Target at 3 GeV X. Ding, UCLA Target Studies 17/18/13.
Carbon Target Design and Optimization for an Intense Muon Source X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Winter Collaboration.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
IDS120j WITHOUT RESISTIVE MAGNETS ( 20 cm GAPS AND 15.8 g/cc W BEADS ) AZIMUTHAL DPD DISTRIBUTION STUDIES FOR: BP#1, SH#1, SHVS#1/LFL, SC#1+SC#2, BeWind.
Multiprocessing/MARS15(2012)/Princeton Cluster (IDS120j w/t Resistive Magnets: New Hg Module) X. Ding UCLA (4/11/2013)
IDS120j WITHOUT RESISTIVE MAGNETS MODIFYING Hg MODULE Nicholas Souchlas, PBL (11/1/2012) 1.
IDS120j WITH AND WITHOUT RESISTIVE MAGNETS PION AND MUON STUDIES WITHIN TAPER REGION, III ( 20 cm GAPS BETWEEN CRYOSTATS ) Nicholas Souchlas, PBL (9/4/2012)
Meson Production at Low Proton Beam Energy (Update) X. Ding, UCLA Target Studies May 9, /9/113.
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
IDS120i GEOMETRY. SIMULATIONS FOR 60%W+40%He SHIELDING WITH STST SHIELDING VESSELS. Hg vs. Ga DEPOSITED POWER DISTRIBUTION. (using Ding's optimized parameters)
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BEAM PIPE BEYOND FIRST CRYOSTAT ( 20 cm GAPS AND 15.8 g/cc W BEADS ) Nicholas Souchlas, PBL.
Ids120h_side. ids120h_top ids120h_iso ids120h_end.
Harold G. Kirk Brookhaven National Laboratory Muon Production and Capture for a Neutrino Factory European Strategy for Future Neutrino Physics CERN October.
Horn and Solenoid options in Neutrino Factory M. Yoshida, Osaka Univ. NuFact08, Valencia June 30th, A brief review of pion capture scheme in NuFact,
BNL solenoid capture workshop: magnet challenges are not trivial Summarized by Tengming Shen
ENERGY FLOW AND DEPOSITION IN A 4-MW MUON-COLLIDER TARGET SYSTEM
IDS120h: PROTON P0-P14 TRAJECTORY FOOTPRINT
X. Ding, UCLA MAP Spring 2014 Meeting May 2014 Fermilab
Horn and Solenoid Options in Neutrino Factory
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE
1 Nicholas Souchlas (PBL) (MAP CONFERENCE SLAC 2012)
Meson Production Efficiencies
Presentation transcript:

Operated by Brookhaven Science Associates for the U.S. Department of Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D. Cline, UCLA, Los Angeles, CA 90095, USA H. Kirk, J. S. Berg, BNL, Upton, NY 11973, USA A study of a pion production and capture system for a 4MW target station for a neutrino factory or muon collider is presented. Using the MARS code, we simulate the pion production produced by the interaction of a free liquid mercury jet with an intense proton beam. We study the variation of meson production with the direction of the proton beam relative to the target. We also examine the influence on the meson production by the focusing of the proton beam. The energy deposition in the capture system is determined and the shielding required in order to avoid radiation damage is discussed. Radiation Dose and Life Time of Superconducting Coil Target parameters is optimized to maximize the pion production. The pion production and the pion-production efficiencies as a function of the primary proton of KE between 2 and 100 GeV are calculated. X. Ding et al., "Optimized Parameters for a Mercury Jet Target," in Proceedings of PAC09, Vancouver, Canada, May 2009, paper WE6PFP102. Conclusion 1.Based on the study of meson production efficiency per unit proton beam power as a function of the primary proton energy, we favor the energy range of 5~15 GeV for the incoming protons. 2.Modeling has explored a range of proton beam entry angles with a view to optimizing the production efficiency of the pions as well as offering an opportunity to explore the possibility of multiple beam entry points for the proton beam onto the jet. 3.The examination of the influence on the meson production by the focusing of the proton beam shows the meson production loss is negligible (< 1%) for the beta function to be 0.3 m or higher. 4.The energy deposition of incoming 4 MW proton beam in the target is investigated. It shows that the bulk of power is deposited in the tungsten-carbide & water (WC) shield, the mercury jet and the stainless steel bottle. Also, we found the power deposition in the first superconducting coil (SC1) is high and enhanced shielding is required to lower the radiation dose and increase the lifetime of SC1. 4. Focused Incident Proton Beam 1. Schematic of the Target System 5. Energy Deposition 2. Pion Production 3. Multiple Proton Beam Entry Directions Energy Deposition (ED) of 4 MW Beam in the Target System ComponentEDPowerP/P beam WC Shield4.60 GeV1838 kW46.0 % Hg Jet1.07 GeV 426 kW10.7 % STST Bottle1.17 GeV 468 kW11.7 % Res Sol0.26 GeV 105 kW 2.6 % Hg Pool4.89*10 -2 GeV 19.5 kW 0.5 % FeCo2.25*10 -2 GeV 9 kW0.23 % Be Window6.22*10 -3 GeV 2.5 kW0.06 % SC15.52*10 -2 GeV 22.1 kW0.55 % SC25.99*10 -3 GeV 2.4 kW0.06 % SC33.30*10 -3 GeV 1.3 kW0.03 % SC41.19*10 -3 GeV 0.5 kW0.01 % Pre-Trgt<10 -3 GeV Air<10 -3 GeV ComponentDose/yrMax allowed Dose4 MW life Superconducting coil (Study II) (24GeV, 1MW proton beam) 6*10 6 Gy/yr10 8 Gy4 yr SC1 (10GeV, 4MW proton beam) 8*10 7 Gy/yr10 8 Gy1.25 yr Comparison of Calculated Energy Deposition between MARS and FLUKA Code RegionP [kW] % (MARS15)P [kW] % (FLUKA) Hg Jet Hg Pool inside WC shield WC shield (z < 27 cm) WC shield (z ≥ 27 cm) Outer Fe yoke (z < −165 cm) Inner Fe yoke (z ≥ −165 cm) Inner Cu coil (18 ≤ r ≤ 23 cm) Outer Cu coil (23 < r ≤ 49 cm) SC Coil 1 SC Coil 2 SC Coil 3 SC Coil 4 SC Coil 5 SC Coil 6 SC Coil 7 SC Coil 8 SC Coil 9 SC Coil 10 SC Coil 11 SC Coil 12 SC Coil 13 Be window at 6m (WC shield) (STST Bottle) (FeCo) (Res Sol) < < Distribution of Energy Deposition (GeV/g per proton) of 4 MW Beam in the Target System An asymmetry layout in the 8GeV proton beam case at z=-75cm is required to achieve the same beam/jet crossing angle at z=-37.5 cm. We found a correlation between the distance of beam relative to the jet and the meson production. The peak meson production is about 8% higher than for the lowest case. X. Ding et al., "Meson Production Simulations for a Mercury Jet Target," in Proceedings of NuFact09, Chicago (2009), AIP Conference Proceedings 1222 (2010), p.323. The layout of multiple proton beam entry directions relative to mercury jet at z=-75cm. Enhanced Shielding for SC1 Coil According to J. Back’s simulation, the energy showers are more “Penetrating” in FLUKA than in MARS. J. Back, Private Communication. Power deposition in SC1 coil could be decreased from 22.1 kW to 4.8 kW if WC & water shield region is extended from 50 to 63 cm in radius. Power deposition in SC1 coil could be further decreased to 1.3 kW if Resistive inner copper coils are replaced by WC & water shield. The mercury jet target geometry.