Philae Science team meeting. Venezia, March 30, 31, April 1, 2009Palazzo Cavalli Franchetti.

Slides:



Advertisements
Similar presentations
June 26, 2002; Page: 1 ESOC (TOS-OGR) European Space Operations Centre Manfred Warhaut Ground Segment Manager TOS-OGR ROSETTA Ground Segment.
Advertisements

6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting.
RPC Meeting, Braunschweig Sept Messung planetarer und interplanetarer Magnetfelder Sommersemester 2014 Lehrveranstaltung: Dr. Konrad Schwingenschuh/ÖAW.
Philae Lander Touchdown Dynamics Revisited – Tests For The Upcoming Landing Preparations – L. Witte, S. Schröder, R. Roll, S. Ulamec, J. Biele, J. Block,
Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz - Rosetta - Mission Status.
Minor bodies observation from Earth and space: asteroid (2867)Steins A. Coradini, M.T. Capria, F. Capaccioni, and the VIRTIS International Team.
A new strategy for the College – the consultation and development process Dr Nina Biscoe Planning Division July 2009.
4th Philae Science Workshop, Venice th Philae Science Workshop Venice, 30 March – 1 April ROMAP Status I. Apáthy, U. Auster, G. Berghofer, A.P.
Status Venice, 30-Mar-1-Apr 2009 Philae STW 2009.
ROLIS status and plans for SDL & FSS W. Bresch S. Mottola R. Schrödter PHILAE Science Team Meeting, Venezia, 31 March 2009.
Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Instrument status Final discussion and wrap-up.
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Criticality of SDL 2. Activity with Orbiter P/L ongoing.
Open Cruise Requirements status and planning LSWT#4, Venice 30/03-01/ LSWT#4.
PHILAE Science Team, Venice LTS phase: the LS standpoint prepared by HBO LTS phase: from end of FSS (mid Nov. 2014) to end of Rosetta mission (31.
Tuesday, March 31Philae Science team meeting Venice March 30 – April 1, 2009 APXS STATUS G. Klingelhöfer (PI) J. Gironés López J. Brückner (Co-I) R. Gellert.
Aerospace Engineering Department SD2: Status and On Comet Science P. Di Lizia, F. Malnati, P. Francesconi, A. Ercoli Finzi, F. Bernelli-Zazzera.
Philae Status and News Venezia; 30 st of March th Philae Post-Launch Workshop.
SDL: MOST point of view CNES / J-F Fronton / D Hallouard LSWT Venice, 30/03-01/04/2009.
SWT 27/11/ Consert W.Kofman, A. Herique, JP. Goutail, A. Roux.
Ptolemy: A report, and future plans D. Andrews, S. Barber, G. Morgan, A. Morse, S. Sheridan, I. Wright, C. Pillinger Ptolemy is the result of a collaboration.
November 12, 2014: First-Ever Soft Landing on a Comet (Comet 67P/Churyumov-Gerasimenko)
The flight dynamics standpoint Alejandro Blazquez (CNES)‏ LSWT Venice, 30/03-01/04/2009.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC Welcome and Logistics.
ISSI Meeting, Berne, Switzerland January, 2014 page 1 The scientific objectives of ESA’s Comet Orbiter ROSETTA and Lander PHILAE Susan McKenna-Lawlor.
Comet Impact: July 4, 2005 Impact Velocity: 23,000 mph Spacecraft Size: Flyby spacecraft - nearly as large as a Volkswagen Beetle automobile. Impactor.
Proposal for Governance Review Wednesday, 29 July 2015 Steven Ponnoosamy, Executive Special Projects Assistant - Governance Proposal for Governance Review.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
Bone Trajectories and Model Simulations Kathleen Mandt, Ray Goldstein, Christoph Koenders May 29, 2013 IES Team Meeting – San Antonio.
National Geospatial Advisory Committee Update FGDC Coordination Group Meeting April 1, 2008.
Planetary Missions Division Dvk, 26 Jun 2002 Pointing scenario - presented at the SWT #10 Daily schedule Overall status/How to proceed Status of inputs.
PHILAE Science Team, Venice Philae On-Comet Science Objectives prepared by HBO Document name = Scientific Objectives of the PHILAE Mission (RO-LAN-LI-1000),
CIVA Status Venezia, Palazzo Cavalli Franchetti March 31, 2009 Philae Science Team Meeting.
Mission Operations Review February 8-10, 2010 Cordoba, ARGENTINA SECTION 16.x Aquarius Science Commissioning and Acceptance Draft 2 Prepared by: Gary Lagerloef,
Project Parkway Timeline to 2011 April 1, 2010 Town Hall Meeting Steering Committee Schools February 2009 May 18, 2009 Project Parkway Community Kick-
1 Science Team Meeting - Monday, 5 June Discipline Group Meetings At Southwest Research Institute: Geology Discipline Group (GDG) 9:00 AM – 6:00 PM Geochemistry.
Comet ISON Awareness Briefing Coming Soon to Our World – Fall 2013…perhaps April 25, 2013 Science Mission Directorate.
WG 2/3 Splinter meeting Dec. 6, 2010 ESOC Darmstadt for WG2 & WG3: D. Bockelée-Morvan C. Engrand E. Grün H. Krueger.
SRG Gantt Chart Template
OSIRIS Full Team Meeting Welcome, Introduction, Agenda
RSOC Overview at SWT #26, 11/12 June 2009
OSIRIS Solar System Simulator
OSIRIS Full Team Meeting Welcome, Introduction, Agenda
New Horizons launches Neptune orbit crossing
OSIRIS operation summary
Pre-landing Orbiter Observations
SESAME Status, Science goals and On-Comet Activities
TeamBudget Update
Close asteroids during Steins and Lutetia FB phases
OSIRIS Science Team Meeting Agay 15. – 17. November 2005
Geometric information for VIRTIS-M data
Lutetia geometry and timeline
OSIRIS operation summary
Mars Swingby (MSB) information
RLGS Status / LCC B. Pätz, DLR/MUSC.
OSIRIS Full Team Meeting
SESAME: Surface Electric Sounding and Acoustic Monitoring Experiment
Philae status 21st Rosetta Science Team meeting
SESAME: Status and On-Comet Science
Security week June 2017 © ETSI All rights reserved.
SD2 Kevin Walsh 16 Feb, 2016.
Act II: The Final Encounter
Welcome and Logistics European Commission CEOS 2018 Chair team
Center for Vision (CVN) on Block 33 Move Planning & Logistics Timeline
XRN Nov 19 Release - Status Update
XRN Nov 19 Release - Status Update
XRN Nov 19 Release - Status Update
Project Lead Workshop 2 Leading for Impact
XRN Nov 19 Release - Status Update
XRN Nov 19 Release - Status Update
Presentation transcript:

Philae Science team meeting

Venezia, March 30, 31, April 1, 2009Palazzo Cavalli Franchetti

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Update all teams on overall status 2. Discuss science matters 3. Identify P/L issues of importance 4. Get prepared for upcoming events PC10 → final instrument uplaods / tests PC12 → CDMS finalized: run of a complete SDL sequence Hibernation → no more later major updates 5. Landing site selection process: actions within Philae / Rosetta Goal of the meeting

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Update all teams on overall status - Philae (system / PL levels) - Rosetta (Orbiter P/L) - Rosetta (system: regulator) → likely present assumption: no further use → the later the maneuver, the smaller the ΔV required → RV scenario to be frozen pre- hibernation (number of phases will only change robustness) → later RV ⇒ full Philae re-shuffling 3 AU → < 2.4 AU (end Jan 15) Goal of the meeting

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Update all teams on overall status - Philae (system / PL levels) - Rosetta (Orbiter P/L) - Rosetta (system: regulator) → likely present assumption: no further use → the later the maneuver, the smaller the ΔV required → RV scenario to be frozen pre- hibernation (number of phases will only change robustness) → later RV ⇒ full Philae re-shuffling 3 AU → < 2.4 AU (end Jan 15) Goal of the meeting

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Update all teams on overall status - Philae (system / PL levels) - Rosetta (Orbiter P/L) - Rosetta (system: regulator) → likely present assumption: no further use. What outcomes? → the later the maneuver, the smaller the ΔV required → RV scenario to be frozen pre- hibernation (number of phases will only change robustness) → later RV ⇒ full Philae re-shuffling 3 AU → < 2.4 AU (end Jan 15) Goal of the meeting

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Update all teams on overall status 2. Discuss science matters 3. Identify P/L issues of importance 4. Get prepared for upcoming events PC10 → final instrument uplaods / tests PC12 → CDMS finalized: run of a complete SDL sequence Hibernation → no more later major updates 5. Landing site selection process: actions within Philae / Rosetta Goal of the meeting

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Update all teams on overall status 2. Discuss science matters ● The MIDAS Rosetta investigation K. Torkar ● Strength of Cometary material W. Arnold ● Steins and Lutetia observations M. Fulchignoni ● C-G: updated properties H. Boehnhardt ● Galileo Galilei G. Bignami Goal of the meeting

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Update all teams on overall status 2. Discuss science matters 3. Identify P/L issues of importance 4. Get prepared for upcoming events PC10 → final instrument uplaods / tests PC12 → CDMS finalized: run of a complete SDL sequence Hibernation → no more later major updates 5. Landing site selection process: actions within Philae / Rosetta Goal of the meeting

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Update all teams on overall status 2. Discuss science matters 3. Identify P/L issues of importance 4. Get prepared for upcoming events PC10 → final instrument uplaods / tests PC12 → CDMS finalized: run of a complete SDL sequence Hibernation → no more later major updates 5. Landing site selection process: actions within Philae / Rosetta Goal of the meeting

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti ● Active Payload Checkout Sept. – 2 Oct ● Earth Swing-By 3 Closest Approach 13 Nov 2009 ● Full power test February 2010 ● Active Payload Checkout April– 14 May 2010 ● Lutetia fly-by 10 July 2010 ● Passive Payload Checkout Jul. – 22 Jul ● Hibernation starts around March 2011 Upcoming milestones

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti ● Active Payload Checkout Sept. – 2 Oct ● Earth Swing-By 3 Closest Approach 13 Nov 2009 ● Full power test February 2010 ● Active Payload Checkout April– 14 May 2010 ● Lutetia fly-by 10 July 2010 ● Passive Payload Checkout Jul. – 22 Jul ● Hibernation starts around March 2011 Upcoming milestones

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti ● Active Payload Checkout Sept. – 2 Oct ● Earth Swing-By 3 Closest Approach 13 Nov 2009 ● Full power test February 2010 ● Active Payload Checkout April– 14 May 2010 ● Lutetia fly-by 10 July 2010 ● Passive Payload Checkout Jul. – 22 Jul ● Hibernation starts around March 2011 Upcoming milestones

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Update all teams on overall status 2. Discuss science matters 3. Identify P/L issues of importance 4. Get prepared for upcoming events PC10 → final instrument uplaods / tests PC12 → CDMS finalized: run of a complete SDL sequence Hibernation → no more later major updates 5. Landing site selection process: actions within Philae / Rosetta Upcoming milestones

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Update all teams on overall status 2. Discuss science matters 3. Identify P/L issues of importance 4. Get prepared for upcoming events PC10 → final instrument uplaods / tests PC12 → final CDMS SW: run of a complete SDL sequence Hibernation → no more later major updates 5. Landing site selection process: actions within Philae / Rosetta Upcoming milestones

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Update all teams on overall status 2. Discuss science matters 3. Identify P/L issues of importance 4. Get prepared for upcoming events PC10 → final instrument uplaods / tests PC12 → final CDMS SW: run of a complete SDL sequence Hibernation → no more later major updates 5. Landing site selection process: actions within Philae / Rosetta Upcoming milestones

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Update all teams on overall status 2. Discuss science matters 3. Identify P/L issues of importance 4. Get prepared for upcoming events 5. Landing site selection process: what criteria what data what working bodies what decision bodies Goal of the meeting

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Update all teams on overall status 2. Discuss science matters 3. Identify P/L issues of importance 4. Get prepared for upcoming events 5. Landing site selection process: what criteria what data what working bodies what decision bodies Goal of the meeting

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti Please focus on: 1. Instrument delta status 2. Plan / rationale for PC10 / PC12 3. Plan / rationale for ESB3 / Lutetia 4. Plan / rationale for SDL instrument uplaods / tests PC12 → CDMS finalized: run of a complete SDL sequence Hibernation → no more later major updates 5. Landing site selection process: actions within Philae / Rosetta PI presentations

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Monday, March Welcome, logistics, goals of the meetingA. Finzi, J-P. Bibring 14.20Mission status R. Schulz 14.40Lander status S. Ulamec 15.00Upcoming in-flight activitiesB. Paetz 15.30SDL sequence: the LS standpointJ-P. Bibring 15.45SDL sequence: the system standpointJ. Biele 16.15Coffee break 16.45SDL sequence: the flight dynamics standpointA. Blasquez 17.00SDL sequence: the SONC standpointFronton & Hallouard 17.15SDL sequence: the CDMS standpointA. Balazs 17.40SDL sequence: the Philae standpointGeneral Discussion 18.00The MIDAS Rosetta investigationK. Torkar 18.30Galileo GalileiG. Bignami Adjourn Dinner

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Tuesday, March Strength of Cometary materialW. Arnold 9.00 SESAME statusK. Seidensticker 9.20MUPUS statusJ. Knollenberg 9.40ROMAP statusI. Apathy 10.00CONSERT statusW. Kofman 10.20APXS statusJ. Girones Coffee break 11.00ROLIS statusW. Bresch 11.20SD2 statusA. Finzi 11.40COSAC statusR. Roll 12.00PTOLEMY statusA. Morse 12.20CIVA statusM. Berthé 12.40Lunch

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Tuesday, March Lunch 14.15LTS phase: the LS standpointH. Boehnhardt 14.40LTS phase: the system standpointP. Gaudon 15.05LTS Phase: the Power Production StandpointA. Finzi 15.15LTS phase: the CDMS standpointA. Balazs 15.40LTS phase: the Philae standpointGeneral Discussion 16.00Coffee break 16.30Philae on comet science objectives documentH. Boehnhardt 17.00MOST current and next evolutionsFronton & Hallouard 17.30Knowledge management tool statusM. Berrone 18.00Venezia bridgesE. Siviero 18.30Adjourn Dinner

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Wednesday, April Steins and Lutetia asteroids observationsM. Fulchignoni 9.30Steins observationsR. Schulz 9.45C-G observations: updated propertiesH. Boehnhardt 10.00Roles and responsibilities P. Gaudon 10.15ESB3, PC10, PC12: Philae plan and prioritiesAll Coffee break 11.00Wrap-up and AOBAll 12.00Adjourn Philae Science Team meeting Lunch Philae Steering Committee All (TBC) invited