Thermal Protection System Testing in High Enthalpy Facility Richard French Vitaliy Grigoryev November 17, 2005 Team HEaTT Progress Report #4.

Slides:



Advertisements
Similar presentations
A VISUAL AID TO PYROMETRY COMPLIANCE (A Guide To An Acceptable TUS Report) February 2010.
Advertisements

Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised.
Digital Celeris Integrated System Patient Room Isolation Room Programmable Controllers Local Display & Command Unit.
Test & Evaluation Master Plan (TEMP) Overview
Copyright © Siemens AG All rights reserved. Fluistcom Project Meeting Belfast 24th of December FLUISTCOM Exchange Program at SIEMENS-Muelheim Daniele.
KING FAHD UNIVERSITY OF PETROLEUM AND MINERALS COLLEGE OF ENVIRONMENTAL DESIGN Dhahran, Saudi Arabia THERMAL AND ECONOMIC PERFORMANCE OF INSULATION FOR.
November 11,2004 Piston Temperature Profile CAT-1P & C13 James McCord.
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
Thermal Protection System Testing in High Enthalpy Facility White Paper Richard French Vitaliy Grigoriev September 27, 2005.
Team Thermasense Thermal Wireless Sensor. Where Does Thermasense Fit In? Re-Entry problems: Space vehicles are heavily instrumented. Wires can introduce.
Thermal Protection System Testing in High Enthalpy Facility Richard French Vitaliy Grigoryev October 25, 2005 Team HEaTT Progress Report #1.
Thermal Protection System Testing in High Enthalpy Facility Richard French Vitaliy Grigoryev November 10, 2005 Team HEaTT Progress Report #3.
Tucson Solar Test Yard Nicholas Davidson And Ryan Price Under the Supervision of Dr. Alex Cronin With help from Daniel Cormode And Vincent Lonji University.
Thermal Protection System Testing in High Enthalpy Facility Richard French Vitaliy Grigoryev November 3, 2005 Team HEaTT Progress Report #2.
Target Wheel Prototype Progress Zeuthen meeting – Apr 7-9 Leo Jenner & Ian Bailey Cockcroft Daresbury Laboratory.
 Purpose  Test design  Measurement system and Procedures  Uncertainty Analysis.
Brief Overview of Hot Wire Anemometers GE 330: Mechatronics Paul Kawka.
Fuel Tank Inerting Joint Airbus/FAA, A320 Flight Tests
Parameters for the thermal decomposition of epoxy resin/carbon fiber composites in cone calorimeter 4 th ICHS Conference, September 14, 2011 D. Quang Dao.
International Aircraft Materials Fire Test Working Group Meeting
Claytor Hydroelectric Project Water Quality Study Mark Hutchins, Project Manager January 25, 2007.
TUSTP 2003 By Ciro A. Pérez May, 2003 DOE Project: HORIZONTAL PIPE SEPARATOR (HPS © )
1 Update from ERCOT Retail Market Services to RMS Additional Material February 12, 2004.
KIT – University of the State of Baden-Württemberg and National Large-scale Research Center of the Helmholtz Association Institute for Nuclear and Energy.
 Purpose  Test design  Measurement system and Procedures  Uncertainty Analysis.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 20 October 1999.
Flow Visualization and Measurement Techniques in Fluid Flows CAOS Presentation L.Kiranmayi.
11/07/20071 Hardware Commissioning Forum: DFBs R. Rabehl AT-ACR.
M&V Plan Template Lia Webster, Nexant New Orleans M&V Summit May 2003.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
BLACK&DECKER Jess Dibelka Mark Steimer Laura Traub Julianne Twomey 12/10/07.
Background Numerous FAR’s mandate fire protection in aircraft powerplant fire zones Parts 23, 25, 27, 29, 33… FAR Part 1 Section 1.1 – Definitions and.
Tim Marker Discussion of Burner Heat Flux Mapping for Proposed Insulation Burnthrough Test Standard FAA Technical Center.
Presented to: IAMFTWG By: Tim Salter Date: October 19-20, 2011, Atlantic City, NJ Federal Aviation Administration Seat Cushion Test Method Update.
VirtuLab: Web Based Flow Visualization Facility Midpoint Review Team 6 Members: Justin Scott Karen Davis Sydni Credle Mentor/Client: Professor: Dr. Shih.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised.
HP SURVEY INSTRUMENT CALIBRATION AND SELECTION PRINCIPLES OF RADIATION DETECTION AND QUANTIFICATION January 13 – 15, 2016 TECHNICAL MANAGEMENT SERVICES.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
Bywater Reliability Update Gary Huntley Entergy New Orleans, Inc. Regional Manager Entergy New Orleans, Inc. July 28, 2010.
Thermal Analysis of Fire Resistive Joint Design for Architectural Expansion Joints First Progress Report Jason Shaw.
Heat Transfer Su Yongkang School of Mechanical Engineering # 1 HEAT TRANSFER CHAPTER 6 Introduction to convection.
Ruben Carcagno, Sandor Feher, George Velev (team leader) MQXFS1 status meeting Summary of the MQXFS1 Investigation.
SPACE SHUTTLE.
Gayle K. Martin November 14, 2016
Kessler-Ellis Products
ENGR 281 Engineering Scholars Program Project Management Life Cycle Overview K. F. Reinschmidt J. L. Frank / Marathon Ashland Petroleum LLC Chair in.
General overview Place : Institue of Space Astrophysic (IAS, Orsay)
Temperature Measurements of Limiter Surfaces at High Heat Flux in the HT-7 Tokamak H. Lin, X.Z. Gong, J. Huang, J.Liu, B. Shi, X.D. Zhang, B.N. Wan,
Fire Study in Multiple Compartments
Steady state thermal analysis in ASONIKA
FIELDS SCM Thermal iPER
Aerodynamic and Heat Transfer Validation of LPT-OGVs (TURB34−LTH part) Chenglong Wang, Lei Wang, and Bengt Sundén Department of Energy.
Uncertainties in the Measurement of Convective Heat Transfer Co-efficient for internal cooling passages using Infrared Thermography in Gas Turbine Engines.
Engineering Technology Division
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
Slides for ME 115 Laboratory
S. Ghosh, M. Muste, M. Marquardt, F. Stern
Initial Startup Procedure Investigation of a BWR-Type Small Modular Reactor Shanbin Shi, Xiaodong Sun Department of Nuclear Engineering and Radiological.
GLAST Large Area Telescope
Thermal Vacuum Test: Plans and Procedures
Confined Space (Permit-required)
What is CONCRETE SLUMP TEST –
Know the Flow: Exploring Ground Water Movement with 3-D Modeling
LDV Real Driving Emissions: - Drafting of physical PEMS protocol –
Motorola Solutions Internal Information
21 NOVEMBER 2018 FREE STATE PROVINCE
17 JANUARY 2019 MPUMALANGA PROVINCE
What are Fins ? Fins are extended surfaces used to increase the rate of heat transfer. It is made of highly conductive materials such as aluminum.
Two-beam Test-stand Design and Construction Status
Presentation transcript:

Thermal Protection System Testing in High Enthalpy Facility Richard French Vitaliy Grigoryev November 17, 2005 Team HEaTT Progress Report #4

Summary Schedule Update Testing Update Improvements Preliminary Lessons Learned Immediate Needs

Schedule

Testing Overview - Ongoing Fully Characterize HETF - Test Section Temperature Profile - Mounting Stand Conduction - Wall Temperature Axial Temperature Probe

1 meter Uni-strut 7 J-type thermocouples Variable Test-to-Test Flame Temperature - Raise and lower on pulley system

Testing Overview - Planned Establish Effective Operating Procedures - Wire Harness Protection - Measurement Confidence - Test Duration Limits Shuttle Tile Sample Test

Improvements High temperature thermal cement for thermocouple interface Better wire harness shielding Pitot Probe re-positioned to rear, with thermocouple installed

Preliminary Lessons Steady state measurements difficult to obtain - Temperature fluctuations due to non- uniform flow Thermal inertia of Test Stand, Axial Probe may affect measurements

Immediate Needs High temp thermocouple for measuring flame temp Verify thermocouple calibration Digital Data Acquisition System K-thermocouple wire to make better use of analog equipment Space Shuttle Tile!!!

Thanks QUESTIONS?