GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Advertisements

GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
SVAC/ISOCInstrument Analysis Workshop, February 27, 2006 Anders W. Borgland 1 Overview Of LAT Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT Project Instrument Analysis Workshop 6 – 06/02/27 F. Piron & E. Nuss (LPTA) 1 Trending CAL performance and mapping crystals Gamma-ray Large Area.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT ProjectSVAC Peer Review July 21, 2004 E. do Couto e Silva 1/100 GLAST Large Area Telescope: Overview I&T Science Verification Analysis and Calibration.
GLAST LAT Project Instrument Analysis Workshop 5 – 05/08/29 F. Piron & E. Nuss (IN2P3/LPTA – Montpellier) 1 Comprehensive review of CAL calibrations Gamma-ray.
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Introduction to the Workshop Series Eduardo do Couto e Silva Instrument.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Project Software vrvs meeting X. Chen 1 GLAST LAT Project Software vrvs meeting X. Chen 1 Analyses of Muon Calibration Data Xin Chen.
GLAST LAT ProjectI&T Meeting – Feb 12, 2003 W. Focke 1 EM timing analysis Warren Focke February 12, 2004.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Gary.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 1 Introduction to Instrument Workshop 6 Eduardo do Couto e Silva Feb 27, 2006.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 1 Gamma-ray Large Area Space.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
Tracker Reconstruction SoftwarePerformance Review, Oct 16, 2002 Summary of Core “Performance Review” for TkrRecon How do we know the Tracking is working?
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project Instrument Analysis Workshop #4, 14 July 2005 David Smith CAL calib at SLAC SVAC1 Stability of the CAL Calibrations Online script “suites”
GLAST Large Area Telescope:
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 8 - Page 1 GLAST Large Area Telescope: I & T Peer.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Implementing a dual readout calorimeter in SLIC and testing Geant4 Physics Hans Wenzel Fermilab Friday, 2 nd October 2009 ALCPG 2009.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
T. Burnett1 GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 9, 2002 SAS Software: Sources Detector geometry model Simulation Event.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
GLAST Calorimeter Crystal Position Measurement Zach Fewtrell, NRL/Praxis GLAST Integration & Test Workshop SLAC July 14, 2005.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
Summary of Test Beam Analysis Meeting - Jan 26 Eduardo do Couto e Silva.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
GLAST LAT ProjectI&T Test Planning Telecon, 8 Nov 2004 CAL Test and Calibration DefinitionJ. Eric Grove GLAST LAT GLAST LAT Calorimeter Subsystem Gamma-ray.
X. Chen 1 GLAST LAT Project EM data analyses meeting X. Chen 1 Software infrastructure used in EM data analyses Xin Chen November 19, 2003.
GLAST LAT Project IFC Tour – Sep 5,2003 Larry Wai 1 GLAST Large Area Telescope: Integration and Facility Status Larry Wai SU-SLAC Integration and Facility.
Comparison of MC and data Abelardo Moralejo Padova.
1 Study of Data from the GLAST Balloon Prototype Based on a Geant4 Simulator Tsunefumi Mizuno February 22, Geant4 Work Shop The GLAST Satellite.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 1 I & T Responsibility LAT I&T, Verification, and Calibration Flow VibeRandom vibrate/sine.
GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
GLAST Large Area Telescope Instrument Science Operations Center
CALGO: Software Tasks cal software:
GLAST LAT tracker signal simulation and trigger timing study
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Instrument Analysis Workshop Series
Calorimeter calibrations with Flight Software.
Overview Goal Study GEM variables in SVAC ntuple
Imaging crystals with TKR
Mini Tower Preliminary Results
Integration and Test Organization Chart
Eduardo do Couto e Silva Feb 28, 2006
Presentation transcript:

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo do Couto e Silva SU-SLAC SVAC I&T Manager Gamma-ray Large Area Space Telescope

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 2 SVAC EM Requirements The Engineering Model (EM1) was used to develop the necessary infrastructure for future hardware tests. Requirements and goals were described in the (“SVAC EM Plan” LAT-TD-00573) –SVAC EM requirements  Develop infrastructure for TKR and CAL calibrations  Measure the energy spectrum of van de Graaff photons –SVAC EM goals  Exercise flexibility of geometry input for the Monte Carlo simulations.  Validate a preliminary set of Monte Carlo distributions  Prototype energy resolution algorithm   Prototype alignment algorithm

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 3 Data Analysis Chain ROOT tree Files (digi) SAS/ONLINE Converter ROOT tree Files (recon) SAS Recon “GENERAL” USER Online Analysis tools online scripts Calibration Constants Calibration scripts ROOT ntuple files IDL Structures SAS Converter SAS User Interface EBF EM In the future the FSW Filter will go in here

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 4 EM Calibrations TKR  Determine Operational Thresholds  Measure Electronic Gain  Identify noisy and dead strips  Characterize TOT –Slope and intercept with charge injection –Mean and width of distributions CAL  Determine Operational Thresholds (HI, LO and zero suppression)  Measure pedestal and gains –Identify noisy and dead logs  Determine muon peak position and width  Measure light Asymmetry, Attenuation, Yield  Measure position resolution without TKR tracks  Measure position resolution with TKR tracks Present status: 3 months after the end of the data taking period

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 5 Calibrations – To do List SVAC IDDescriptionComments C10TKR Noisy ChannelsEGSE SASreconNeed to define noise level C11TKR Dead ChannelsEGSE SASrecon C12TKR ToT SignalEGSECI PID?Seen variations on channel by channel. Maybe used for particle ID C13TKR ToT Distribution SASPID?Maybe used as a cross check of C12 C14CAL Light Asymmetry SASreconWould like to change this to Energy Scale (MeV/ADC count) C15CAL Light Attenuation SASreconMeasure muon peaks (includes effects from optical and electronic gains). Function of position in a log. Investigating light taper model C16CAL Light YieldEGSECI I&T has no experience, done by CAL only. Need to capture information for offline C18CAL PedestalsEGSECISASreconNeed to define width characterization (rms vs sigma) C19CAL Electronic GainEGSECI Need to get information from online C20CAL Integral non-linearityEGSECI Need to get information from online C22CAL Noisy ChannelsEGSE SAS From pedestal widths. None observed in EM. Need to develop infrastructure C23CAL Dead ChannelsEGSECISAS From pedestal widths. None observed in EM. Need to develop infrastructure C24CAL LO DiscriminatorEGSECI I&T has no experience, done by CAL only. Need to capture information for offline C25CAL HI DiscriminatorEGSECI I&T has no experience, done by CAL only. Need to capture information for offline C26CAL Zero-Suppress Threshold EGSECI I&T has no experience, done by CAL only. Need to capture information for offline C27DeadtimeEGSE Measure overall deadtime as part of the functional test plan C29TKR GTFE Threshold ScanEGSECI Need to capture information for offline including GTFE split Calibration List derived from Level III document – SVAC EM Plan – LAT-MD-00446

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 6 Calibration Infrastructure Tasks Lessons learned  Develop code to create constants from the digi files Redefined output format as we learned more about the instrument  Develop code to read constants into recon Modified reconstruction to allow calibrations without zero suppression in the CAL Modifying reconstruction to read in ToT constants on channel per channel basis Developing a scheme to capture the instrument configurations necessary for MC validation and for reference during calibrations  Configuration control Created cvs repository to keep the calibration code Developing process to version control creation of constants and to transfer information from online whenever needed

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 7 Energy Measurement ROOT tree Files (digi) Raw spectrum of individual crystals Calibration Constants Perform Calibrations C14,C15,C16,C18 on each crystal Operational Settings Perform C18,C19,C20,C22,C23,C24 to establish baseline for data taking ROOT tree Files (recon) Produce Energy Calibrated Spectrum using all crystals ROOT ntuple files IDL Structures Use Data Analysis Cuts and VDG Flux Calibration to obtain final spectrum Data Analysis Calibrations

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 8 CAL Energy Spectrum CAL Energy Spectrum Photon Source OFF Photon Source ON Energy (MeV) Mostly photons From Gary Godfrey

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 9 Source Calibration From Gary Godfrey Expect two energy lines

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 10 Flux Measurement Top TKR face Extrapolation to Photon Source EM Rec Direction cosine In 0.02 bins 10% error is dominated by the knowledge on the BGO position 9% of the of photons produced by the source are measured by the EM From Gary Godfrey

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 11 Experimental setup CALTKR Gammas:66% 17.6 MeV 34% 14.6 MeV, FWHM = 1.5 MeV + lots of electrons Cosmic Background Electrons are produced by gamma conversions in the iron shield in front of the accelerator Beam pipe Not a monochromatic beam!

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 12 EM Energy Spectrum (VDG DATA) Event selection: nTkrTracks>=1 && zDir 4MeV Expected  Spectrum Delta function (17.6 MeV) Breit-Wigner (mean 14.5, width=1.5MeV ) Energy (MeV) From Xin Chen

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 13 Energy Spectrum (VDG MC) Events converted in top layer of Tracker only From Xin Chen Event selection: nTkrTracks>=1 && zDir 4MeV Expected  Spectrum Delta function (17.6 MeV) Breit-Wigner (mean 14.5, width=1.5MeV ) Energy (MeV)

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 14 Documentation for EM2 We are now updating the following documents  SVAC EM Plan – LAT-MD Defines the SVAC requirements  Calibration algorithms for the EM – LAT-TD Describes Algorithms Describes Output Formats for the calibration data  LAT SAS EM Calibration Infrastructure – LAT-TD Describes the SAS database and how calibrations are used by the offline code  SVAC Database for the EM – LAT-TD Describes how calibration data is stored in ORACLE for trending

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 15 Summary Current status 3 months after the end of the data taking period Calibrations –We have met all calibration requirements –Lessons learned on the infrastructure are now being implemented for EM2 Data Analysis –We have met the requirements for the measurement of the energy spectrum –In addition we met most of the goals for the EM1 including the development of an algorithm for energy resolution, which is now being documented and will be presented in detail in the near future by Xin Chen for a group review Documentation –We have started updating all documentation relevant to EM2