The Large Synoptic Survey Telescope: Design and Performance SPIE Marseille, France June 24th, 2008 Kirk Gilmore LSST Camera Manager Stanford/SLAC/KIPAC.

Slides:



Advertisements
Similar presentations
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Advertisements

(1) - Camera Electronics - Status and Update on changes since Aug July 07 John Oliver and the Camera Electronics team.
990901EIS_Opt.1 The Instrument: Optical Design Dr. John T. Mariska Data Coordination Scientist Naval Research Laboratory
Corner Raft Conceptual Design Corner Raft Conceptual Design Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
Active Control of Aberrations for the Large Synoptic Survey Telescope (LSST) Brice Cannon Lawrence Livermore National Laboratory Research Supervisor: Scot.
All these Sky Pixels Are Yours The evolution of telescopes and CCD Arrays: The Coming Data Nightmare.
Ultimate wide field Imaging: The Large Synoptic Sky Survey Marek Kowalski Physikalisches Institut Universität Bonn.
The Research School of Astronomy and Astrophysics of the Australian National University at Mt Stromlo Observatory is developing a wide-field Cassegrain.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
1 LSST: Dark Energy Tony Tyson Director, LSST Project University of California, Davis Tony Tyson Director, LSST Project University of California, Davis.
July 7, 2008SLAC Annual Program ReviewPage 1 LSST Program and Development Status Kirk Gilmore SLAC/KIPAC/LSST.
1 The Large Synoptic Survey Telescope Status Summary Steven M. Kahn SLAC/KIPAC.
May stars be the actors and dark energy direct shoot a movie in the sky Chihway Chang Oct.8 ‘2008.
1 Large Synoptic Survey Telescope Review Kirk Gilmore - SLAC DOE Review June 15, 2005.
Camera Workshop September 2008 K. Fouts, K. Gilmore.
Science Specification Table 12 keV keV for neutral particles 40.5 cm 2 image plane Electronic Noise 3 keV FWHM Proton Dead Layer
1 Aurélien Barrau LPSC-Grenoble (CNRS / UJF) A few words on the LPSC The LPSC in few words: The scientific environment : Grenoble 4 Universities.
Integration and Test 14 October 2008 Martin Nordby.
SDW2005, juin, Taormina The Corot Space instrument.
CCD testing Enver Alagoz 12 April CCD testing goals CCD testing is to learn how to – do dark noise characterization – do gain measurements – determine.
1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 1 EddiCam: The Eddington Photometric Camera Preliminary design.
LSST Electronics Review BNL January 25-26, LSST Electronics Review BNL January 25-26, 2012 Electronics Development Plan and Vertical Slice Test (VST)
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
1 K. Gilmore - SDW The Large Synoptic Survey Telescope (LSST) Status Summary Kirk Gilmore SLAC/KIPAC.
Camera Overview LSST Camera Internal Review with Roger Smith, Cal Tech Kirk Gilmore October 14, 2008.
The Large Synoptic Survey Telescope Philip A. Pinto Steward Observatory University of Arizona for the LSST Collaboration Legacy Projects Workshop 17 May,
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
Key R&D Activities for the LSST Camera DOE HEP Program Review June 13, 2007 Kirk Gilmore (SLAC) LSST Camera Manager.
K. Gilmore Camera Workshop
Dark Energy and Large Synoptic Survey Telescope Precision Calibration Apparatus: Calibrating the Throughput and Response of Astronomical Instrumentation.
LSST: Preparing for the Data Avalanche through Partitioning, Parallelization, and Provenance Kirk Borne (Perot Systems Corporation / NASA GSFC and George.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Electronics Development Plan Goals and Plans for
Kirk Gilmore LSST Camera Scientist Stanford/SLAC/KIPAC
July 7, 2008SLAC Annual Program ReviewPage 1 LSST Program and Development Status Kirk Gilmore SLAC/KIPAC/LSST.
LSST Studies Large Synoptic Survey Telescope DOE HEP Program Review April 18, 2006 Brookhaven National Laboratory Morgan May.
Development of a 3.2 Gpixel Camera for the Large Synoptic Survey Telescope (LSST) Sept-'081TWEPP 2008 Naxos, Greece John Oliver LSST Camera Electronics.
Opto-Mechanics for SNAP at UM
The Prime Focus Imaging Spectrograph Design and Capabilities
Calibration of the LSST Camera Andy Scacco. LSST Basics Ground based 8.4m triple mirror design Mountaintop in N. Chile Wide 3.5 degree field survey telescope.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
The Large Synoptic Survey Telescope: The power of wide-field imaging Michael Strauss, Princeton University.
Precision Studies of Dark Energy with the Large Synoptic Survey Telescope David L. Burke SLAC for the LSST Collaboration Rencontres de Moriond Contents.
LSST and Dark Energy Dark Energy - STScI May 7, 2008 Tony Tyson, UC Davis Outline: 1.LSST Project 2.Dark Energy Measurements 3.Controlling Systematic Errors.
The Large Synoptic Survey Telescope and Precision Studies of Cosmology David L. Burke SLAC C2CR07 Granlibakken, California February 26, 2007 Brookhaven.
System Performance Metrics and Current Performance Status George Angeli.
Astronomical Observational Techniques and Instrumentation
Extended Detector Cutoff Considerations WFIRST Project Office May
14-Oct-20081Camera Review - SLAC Camera Electronics - John Oliver - Contributors to Camera Electronics conceptual design BNL – Veljko Radeka,
MPI Semiconductor Laboratory, The XEUS Instrument Working Group, PNSensor The X-ray Evolving-Universe Spectroscopy (XEUS) mission is under study by the.
LSST Camera Electronics Overview September 16, 2008 R. Van Berg for the LSST Electronics Team.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
BABAR  &  L. de Brunhoff Drift Chamber System BABAR Drift Chamber Project Co-System Managers D.B.MacFarlane, McGill University A.J.S.Smith, Princeton.
Astronomical Spectroscopic Techniques. Contents 1.Optics (1): Stops, Pupils, Field Optics and Cameras 2.Basic Electromagnetics –Math –Maxwell's equations.
LSST Sensor Requirements and Characterization of prototype LSST CCDs V. Radeka, J. Frank, J.C. Geary, D.K. Gilmore, I. Kotov, P. O’Connor, P. Takacs, J.A.
Gina Moraila University of Arizona April 21, 2012.
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Astronomical Spectroscopic Techniques
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
SLAC Program Review June 7, 2006 Kirk Gilmore Stanford/SLAC/KIPAC
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Intra-pixel Sensitivity Testing Preliminary Design Review
LSST Camera Detector Status
LSST Photometric Calibration
Astronomical Observational Techniques and Instrumentation
LSST Camera Internal Review
Instrument Overview Larry Springer HMI Program Manager
NEH - Status Stefan Moeller.
Presentation transcript:

The Large Synoptic Survey Telescope: Design and Performance SPIE Marseille, France June 24th, 2008 Kirk Gilmore LSST Camera Manager Stanford/SLAC/KIPAC

________________________________________________ Science Objectives Drive System Requirements Image Quality Image Quality f/1.25 beam f/1.25 beam Large focal Plane Large focal Plane Dark Energy / Matter Dark Energy / Matter –Weak lensing - PSF –Shape/ Depth / Area –Super Novae + Photo z –Filters (ugrizy)

3 Four Main Science Themes for LSST: 1. Constraining Dark Energy and Dark Matter 2. Taking an Inventory of the Solar System 3. Exploring the Transient Optical Sky 4. Mapping the Milky Way Major Implications to the Camera: 1.Large Etendue 2.Excellent Image Quality and Control of PSF Systematics 3.High Quantum Efficiency over the Range 320 – 1,050 nm 4.Fast Readout

LSST Concept 8.4 Meter Primary Aperture –3.4 M Secondary –5.0 M Tertiary 3.5 degree Field Of View 3 Gigapixel Camera –4k x 4k CCD Baseline –65 cm Diameter –Six Filters 30 Second Cadence –Highly Dynamic Structure –Highly Parallel Readout Accumulated depth ~27 mag. in each filter over 10y Data Storage and Pipelines ~ 18Tb/night! Design Telescope and Camera as a Single Instrument

________________________________________________ LSST Optical Design f/1.23 <0.20 arcsec FWHM images in six bands:  m 3.5 ° FOV  Etendue = 319 m 2 deg 2 LSST optical layout Polychromatic diffraction energy collection Detector position ( mm ) Image diameter ( arc-sec ) U 80%G 80%R 80%I 80%Z 80%Y 80% U 50%G 50%R 50%I 50%Z 50%Y 50%

________________________________________________ LSST Camera Optical Design

________________________________________________ LSST Deliverable Org Chart Electronics Oliver (Harvard) WBS Sensor/Raft Development Radeka/O’Connor (BNL) WBS Optics Olivier (LLNL) WBS Cryostat Assembly Schindler (SLAC) WBS Calibration Burke (SLAC) WBS Camera Body Mechanisms Nordby (SLAC) WBS Data Acq. & Control Schalk (UCSC) WBS Corner Raft WFS/Guider Olivier (LLNL) WBS Utilities Nordby (SLAC) WBS Sensors/Filters Pain/Antilogus (IN2P3) LPNHE, LAL, APC, LPSC, LMA

________________________________________________ LSST Camera Team Brandeis University J. Besinger, K. Hashemi Brookhaven National Lab S. Aronson, C. Buttehorn, J. Frank, J. Haggerty, I. Kotov, P. Kuczewski, M. May, P. O’Connor, S. Plate, V. Radeka, P. Takacs Florida State University Horst Wahl Harvard University N. Felt, J. Geary (CfA), J. Oliver, C. Stubbs IN2P3 - France Detailed in IN2P3 section of this report Lawrence Livermore National Lab S. Asztalos, K. Baker, S. Olivier, D. Phillion, L. Seppala, W. Wistler Oak Ridge National Laboratory C. Britton, Paul Stankus Ohio State University K. Honscheid, R. Hughes, B. Winer Purdue University K. Ardnt, Gino Bolla, J, Peterson, Ian Shipsey Rochester Institute of Technology D. Figer Stanford Linear Accelerator Center G. Bowden, P. Burchat (Stanford), D. Burke, M. Foss, K. Gilmore, G. Guiffre, M. Huffer, S. Kahn (Stanford), E. Lee, S. Marshall, M. Nordby, M. Perl, A. Rasmussen, R. Schindler, L. Simms (Stanford), T. Weber University of California, Berkeley J.G. Jernigan University of California, Davis P. Gee, A. Tyson University of California, Irvine D. Kirkby University of California, Santa Cruz T. Schalk University of Illinois, Urbana-Champaign J. Thaler University of Pennsylvania M. Newcomer, R. Van Berg Wayne State University David Cinabro

________________________________________________ Camera Layout Cryostat L1/L2 Assembly Filter Changer Filter Shutter

________________________________________________ CCD PACKAGED CCD RAFT From sensors to rafts to raft/towers The heart of the system TOWER 3 x 3 submosaic of CCDs front end electronics thermal management components Tower is an autonomous, fully-testable 144 Mpixel camera carrier CCD connector alignment pins baseplate thermal straps FEE boards housing (cold mass) 3-pt. mount cooling planes

________________________________________________ LSST focal plane sensors

________________________________________________ BNL and sensor group are providing leadship For sensor development -50V -10V X-ray images Request for proposals for prototype science CCDs – issued Feb – contract award June high-resistivity, thick CCDs from study program have been extensively characterized – design models validated – behavior of dark current, quantum efficiency, and point spread function vs. thickness, temperature, and electric field – flatness and surface morphology – antireflection coating CCD controllers for 4 new test labs under construction – UC Davis, SLAC, Paris, Purdue – allows full-speed testing of segmented sensors Components for CCD/electronics chain testing in assembly (Raft/Tower electronics)

________________________________________________ 32-port CCD 3x port CCDs Raft tower electronics partitioning/temp zones Front End Boards (6 per raft): 144-channels of video signal chain through CDS processing clock and bias drive ASIC-based (ASPIC/SCC) BEE motherboard and backplane: differential receiver signal chain ADC (16+ bits) buffers data transport to optical fiber clock pattern generation clock and bias DACs temperature monitor / control ~175K ~235K Flex cables (~ 500 signals) Cryo Plate (~170k) Cold Plate (~230k) ~185K Molecular Flow Barrier

________________________________________________ RFP for Prototyping Filters in cm dia. Curved surface Filter is concentric about the chief ray so that all portions of the filter see the same angle of incidence range, 14.2º to 23.6º Filter is concentric about the chief ray so that all portions of the filter see the same angle of incidence range, 14.2º to 23.6º Specs Filter RFP being sent out to selected vendors Filter prototyping will qualify vendors to fabricate science filters Half-Maximum Transmission Wavelength

________________________________________________ Contamination test chamber at SLAC Fore or Preparation Chamber Main Chamber FORE MAIN ANTE cold finger Sample Preparation Chamber Outgassing Analysis Chamber Optical Transmission Chamber Sample Entry Straight- Thru Valve Optical Entry

________________________________________________ IN2P3 - France R&D CNRS - National Center for Scientific Research IN2P3 - National Institute for Nuclear Physics and Particle Physics APC - Lab for Astroparticles and Cosmology (Paris) CC-IN2P3 - Computing Center of IN2P3 (Lyon) LAL - Lab of Linear Accelerator (Orsay) LMA - Lab of Advanced Materials (Lyon) LPSC - Lab for Subatomic Physics and Cosmology (Grenoble) LPNHE - Lab for Nuclear Physics and High Energy (Paris)

________________________________________________

Fin

FY-09FY-10FY-11FY-12FY-13 FY-14 FY-15FY-16 The new LSST timeline generated with agency guidance following the successful CoDR in Sep., ‘07 FY-17 FY-07FY-08 NSF D&D Funding MREFC Proposal Submission NSF CoDR MREFC Readiness NSF PDR NSB NSF CDR NSF MREFC Funding Commissioning Operations DOE R&D Funding DOE CD-0 DOE MIE Funding DOE CD-1 DOE CD-2 DOE CD-3 Sensor Procurement Starts DOE CD-4 Camera Delivered to Chile Camera Fabrication (5 years) Telescope First Light DOE I&C Funding Camera Ready to Install NSF + Privately Supported Construction (8.5 years) System First Light ORR Privately Supported R&D and Construction (7 years)

________________________________________________ Camera Construction Costs Request to DOE $87M

________________________________________________ Camera risk mitigation plan prior to construction R&D EffortPlan Status Demonstrate sensor performance Establish all specs are met: Flatness, high fill factor, electrical parameters, Study phase sensors received and being evaluated Efficient sensor procurement Establish cost, yield and performance of sensors PO’s being drafted that address risk areas. Prototype phase starting Establish reliability of shutter mechanism Build prototype shutter and test Design completed. Procurement of parts begun Evaluate outgassing properties of cryostat components Contamination control demonstrated in engineering cryostat Contamination testing started. Materials selection process begun. 75cm filter w/multilayer coatings produced with non- uniformity of <1%. Fabrication of samples in large coating chamber to evaluate uniformity of filter transmission Passbands defined. Total system throughput modeled. Some witness samples already produced. RFP to potential vendors ready.