Supermodule Space-Frame Integration Backpanel L6C1, L0 Bernd Windelband, Uni Heidelberg ALICE-TRD status meeting, 25.4.2005 at KIP.

Slides:



Advertisements
Similar presentations
Status of Service Support Wheel Bernd Windelband, Uni Heidelberg ALICE-TPC.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Status of the ATLAS MM project
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
TRD Status meeting Münster Clemens Adler TRD ROC Status The long and winding road to production start.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
8.7.04TRD Status meeting HdClemens Adler TRD ROC Status.
DCal Meeting
Technical Forum Alice week Clemens Adler Transition Radiation Detector Status Participating Institutions: Athens University, NIPNE Bukarest, JINR.
TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.
TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status.
Spectrometer Solenoid Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICO Meeting—RAL June 7, 2010.
Engineering Design Review for TRD-Readout Chamber
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Building a clock PART 1: The Body. Gathering materials  The wood that you will be using is called Maple. You can identify it by knowing that it is: Heavy.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
BE PREPARED TO TAKE A FEW NOTES TODAY… Pick up the pink sheet at the front.
th on th on th on th on 365.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
This is a fold-down clothes bar that will hold up to 12 plastic clothes hangers or even more wire hangers. As I don’t have a trailer wall to put it on,
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
1.  YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. ( Dim. inspection 680 mm (0,-0.5)  Fasteners =
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
Straw manufacturing current status T.Enik, S.Shkarovskiy, I.Polenkevich,Yu.Potrebenikov
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
Preparing a Cutting List. A cutting list is an accurate and very detailed list of the different parts that will make up your project/product. Your cutting.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
DCal Insertion Tooling 24/02/ DCal Insertion Tooling DCal Insertion System feature following main components 1. One rotator : cylindric welded structure.
CLIC Permanent Magnet Quadrupole update 27 th January 2011 Mechanical Engineering status update N. Collomb1.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Hcal Geometry and Assembly Videoconference January 2008, 24th.
DCal-ALICE integration and installation plan and status A. Tauro.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
LBNF CAD models, Drawings and Component list
Hcal Geometry and Assembly
Remaining items (per module) for panel construction (mostly Fabien)
Installation of an Instrument on a CERN machine
INSTALLATION SEQUENCE
G. Carboni for the Muon Group
Test gas-box for Micromegas panels and changes in mechanics
CLIC Civil Engineering Update
MicroMegas Mechanical Meeting --- Cern April 2014
Hcal Geometry (second version)
Cutting Sample Simultaneous 5axis Cutting modes are developed at Version 5. “Undercut Z-level Finishing” creates tool paths at undercut part. “Swarf cutting”
Cabover Camper Priyanka Chand Tyler Croissant Nik Roetemeyer
Saw blades for reciprocating saws
Heidelberg Module Production
Roof design Bunker Project CDR
Presentation transcript:

Supermodule Space-Frame Integration Backpanel L6C1, L0 Bernd Windelband, Uni Heidelberg ALICE-TRD status meeting, at KIP

ALICE-TRD Status Meeting, at KIPBernd Windelband, Uni Heidelberg Fixation of SM in SF Design proposal from Münster by Wolfgang Fixation proposal from CERN by Diego Meeting on 12 th of April in Heidelberg Final decision and design

ALICE-TRD Status Meeting, at KIPBernd Windelband, Uni Heidelberg Fixation of SM in SF Design proposal from Münster by Wolfgang Fixation proposal from CERN by Diego Good compromise found Solution with clamped rail support more machine shop work but welding of additional parts into SF can be avoided

ALICE-TRD Status Meeting, at KIPBernd Windelband, Uni Heidelberg Design Work for SM Victor Chepurnov to HD end of May until end of July -> Help in detailed design of SM Wolfgang Verhoeven from Münster -> interface SF SM (rail system) Stefan Hetzel PI (CAD group) -> design of cooling/bus bar units for SM -> at present: design of 2 units for L1C1 chamber Final Design of first „full size“ SM version at PI

ALICE-TRD Status Meeting, at KIPBernd Windelband, Uni Heidelberg Production of L0 Backpanels Start of production: May 2nd -> L0C0 type, finished beginning of June -> L1C1 type, beg. June, finished mid July

ALICE-TRD Status Meeting, at KIPBernd Windelband, Uni Heidelberg Modification of L6C1 to L5C1 Backpanels One panel has been prepared and shipped to FACC. -> reduction of width by 22mm each side -> cut off longitudinal ledges of Al-frame -> milling of HC core to provide space for new ledges -> glueing in new Al-ledge both sides -> filling HC along rim with glue -> machinig the rim to required thickness -> all in all about € 400.-/panel