Stephen Norum LCLS FAC April 16, 2007 1 LCLS Machine Protection System Overview Interim MPS Full LCLS MPS Design Schedule.

Slides:



Advertisements
Similar presentations
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Advertisements

HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
Introduction Digital systems (logic design, digital logic, switching circuits) are employed in: computers data communication control systems many other.
Stop Watch Sean Hicks Dongpu Jin ELEC 307 Project 2 Instructor: Alvaro Pinto April/12/2011.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
S. Smith LCLS Facility Advisory April 16, BPMs and Toroids Facility Advisory Committee April 16, 2007 System overview.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
E. Michael Saleski PPS and April 20, 2006 LCLS Personnel Protection System and Beam Containment System E. Michael Saleski.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Computer and Technology Overview Slides from Essentials of Management Information Systems (5 th ed.), Laudon and Laudon, Prentice-Hall.
Oct. 30, 2007 LCLS FAC D. Fairley MATLAB Feedback Phase II Commissioning.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Project D1427: Stand Alone FPGA Programmer Characterization presentation 10/12/08 Supervisor: Mony Orbach Students: Shimrit Bar Oz Avi Zukerman High Speed.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy P0 Feedback Project: Merging EPICS with FPGA’s Nicholas.
Stephen Schuh Vacuum Controls Final Design 6 April 2006 Injector Vacuum Controls Hardware Final Design Review 6 April 2006.
TRTS Team-6))EET-EL-5 15/5/ – Ibrahim Hamdy 219 – Salman Hassan About : PLC ( LOGO ) With Mr.Klaus Koevener.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Introduction to Computers and Python. What is a Computer? Computer- a device capable of performing computations and making logical decisions at speeds.
How Computers Work. A computer is a machine f or the storage and processing of information. Computers consist of hardware (what you can touch) and software.
DSD Presentation Introduction of Actel FPGA. page 22015/9/11 Presentation Outline  Overview  Actel FPGA Characteristic  Actel FPGA Architecture  Actel.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
APS BPM and power supply applications on micro-IOCs W. Eric Norum
Input/ Output By Mohit Sehgal. What is Input/Output of a Computer? Connection with Machine Every machine has I/O (Like a function) In computing, input/output,
Eric Keller, Evan Green Princeton University PRESTO /22/08 Virtualizing the Data Plane Through Source Code Merging.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
B. Todd et al. 25 th August 2009 Observations Since v1.
Experience Running Embedded EPICS on NI CompactRIO Eric Björklund Dolores Baros Scott Baily.
By Dinesh Bajracharya Nepal Components of Information system.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
Stephen Norum LCLS Oct. 12, LCLS Machine Protection System Outline Overview of interim MPS Update on the interim MPS.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
February 17-18, 2010 R&D ERL Z EYNEP A LTINBAS R&D ERL M ACHINE P ROTECTION S YSTEM Z EYNEP A LTINBAS February 17-18, 2010 M ACHINE P ROTECTION S YSTEM.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
John Carwardine 20 April 09 Preliminary planning for Aug/Sept studies.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
AND Gate Inputs Output Input A (Switch) Input B (Switch) Output Y (Lamp) 0 (Open) 0 (OFF) A B Lamp.
Information Systems Technology Ross Malaga A Copyright © 2005 Prentice Hall, Inc. A-1 INSIDE YOUR COMPUTER.
Design of BEPC Ⅱ Bunch Current Monitor System Zhanglei Beam Instrumentation Group.
 Kim  Allen  Kenneth. Chapter 1 Computer Fundamentals.
LCLS MPS Upgrade Gasper Jansa, Luciano Piccoli, Jeff Olsen, Garth Brown, Sonya Hoobler, Stephen Norum, Stephanie Allison, Kim Kukhee Adding BSA.
Programmable Logic Controller (PLC) - Hardware and Software Lecture 12.
CHAPTER 1: Computers and Systems
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
BINARY SYSTEM.
LLRF and Beam-based Longitudinal Feedback Readiness
RF Local Protection System
LCLS Personnel Protection System and Beam Containment System
 Is a machine that is able to take information (input), do some work on (process), and to make new information (output) COMPUTER.
LCLS Machine Protection System
Function of Operating Systems
Overview of Computer system
Computer System.
Presentation transcript:

Stephen Norum LCLS FAC April 16, LCLS Machine Protection System Overview Interim MPS Full LCLS MPS Design Schedule

Stephen Norum LCLS FAC April 16, Interim MPS Presented at last FAC Hardware and software installed and tested Running as MPS for injector commissioning Capable as MPS for BC2 commissioning Does not meet LTU/Undulator MPS requirements

Stephen Norum LCLS FAC April 16, Full MPS Design Flexible Software Based System Easily reprogrammable flexible logic Rate limiting on fault severity (PICs) Monitoring of EVG Upgradeable hardware modules Simple Hardware Based System Secure second path of shutting off beam in response to an obstruction or major fault

Stephen Norum LCLS FAC April 16, Flexible Software Based System MVME 6100 Reflective Memory Latching Digital Input Card Digital Output Card Two classes Decision Module Input Multiplexer

Stephen Norum LCLS FAC April 16, Flexible Software Based System

Stephen Norum LCLS FAC April 16, Simple Hardware Based System Based on Argonne Design ColdFire CPU Altera FPGA 10 MHz tones Creates a Networked TIU (NTIU) Remotely Bypassable EPICS Ready

Stephen Norum LCLS FAC April 16, Simple Hardware Based System

Stephen Norum LCLS FAC April 16, Schedule