GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness.
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review I&T Plan.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
Where to put Towers A and B in the Grid – technical issues 18-Jan-2005 L. Wai (SLAC/Group K) for LAT I&T.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Management 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting Management March 9th,
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST Large Area Telescope:
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project Technical/Cost/Schedule Review 04/26/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project Integration and Test IFCT Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project IFC Tour – Sep 5,2003 Larry Wai 1 GLAST Large Area Telescope: Integration and Facility Status Larry Wai SU-SLAC Integration and Facility.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 1 I & T Responsibility LAT I&T, Verification, and Calibration Flow VibeRandom vibrate/sine.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST Large Area Telescope:
Mechanical Integration
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope:
16:00 Meeting Fri. June 18 Mon. June 21 Tue. June 22 Wed. June 23
08:00 Meeting Fri. June 18 Mon. June 21 Tue. June 22 Wed. June 23
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Test Readiness Review
LAT Environmental Test Planning and Design Review
Introduction and Overview
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review Introduction Elliott Bloom I&T Manager Gamma-ray Large Area Space Telescope

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 2 Single Tower Assembly and Test FLOW

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 3 Second Tower Assembly and Test Flow

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 4 Manpower Plan

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 5 SLAC Safety Stand down and Consequences for I&T DIRECTOR’S MEMORANDUM TO: All HandsOctober 11, 2004 FROM: Jonathan Dorfan SUBJECT: Immediate Lab-Wide Safety Stand-down Monday October 11, a serious accident took place in the Linac gallery resulting in severe burns for one of our colleagues. As a result, I have decided to take immediate and decisive action. All accelerators have been stopped and I have directed that all work, other than desk and janitorial work and essential maintenance involving equipment safety will cease immediately. This electrical accident’s subsequent safety investigation and SLAC wide effort to improve safety shut down any work but safety training for over a week. Electrical hot check work and rigging were shut down for over a month, and have just started again after significant changes in Lab procedures for approving this work. Our standard electrical and rigging procedures in I&T have shown us to be a good example in the subsequent DoE and OSHA investigation of SLAC’s compliance with their safety rules. LAT I&T is compliant.

I&T Two Tower IRR 6 GLAST LAT ProjectNovember 18, 2004 EM-2 (August 04- January 05) EM GASU 8/5/04 Mini-Tower Pre-ship LPT 8/5/04 Install Mini- Tower (Bldg 33) 8/5/04 EM CAL 8/5/04 Mini-ACD 8/25/04 FSW Support for filtering 9/1/04 EM CAL Post-Ship Test 8/6/04 Install EM CAL 8/6/04 Single Bay CPT 8/6/04 Cosmics and radioactive source w/TKR thresholds, Cosmics w/TACK delays for CAL 8/9/04 EM GASU Validation 8/6/04 Mini-ACD Integration (on Bench) 9/16/04 Install Mini-ACD 9/21/04 Mini-ACD LPT 9/23/04 Mini-LAT LPT 11/29/04 Mini-LAT Timing 12/6/04 Mini-LAT Cosmics 12/13-17 Mini-LAT Van de Graaff 12/20-23 EM GASU STM 8/5/04 Remove Mini- CAL 8/6/04 Mini-Tower Post-ship LPT 8/5/04 Complete EM-2 SVAC 01/17/05 SVAC to Process and Analyze data offline – SAS Offline Pipeline is Essential Offline Pipeline testing as of 10/12/04 Return CAL to NRL 8/24/04 Mini-Tower test with Mini-ACD 10/07/04 Re-receive CAL 10/13/04 11/22/04

I&T Two Tower IRR 7 GLAST LAT ProjectNovember 18, 2004 Internal Peer Review RFA Status Department # RFAs # Responses # Open IFCT26 MGSE1312 Particle Test999 SVAC1486 Online10 Open Internal Peer Review RFAs will be assessed after the conclusion of the Two Tower IRR to determine if items should be closed or remain open.

I&T Two Tower IRR 8 GLAST LAT ProjectNovember 18, 2004 Level of I&T Readiness Overview Areas that are generally ready –Facility –MGSE (Except for Personnel Access Platform) –Procedures – Mechanical –EGSE –Particle Test –SVAC Current Holes in I&T Readiness –Procedures – Electrical (Closure of test definition) –MGSE – PAP –Tracker – lack of dry run experience with realistic EM. –Subsystem Script deliveries. –Survey and Alignment plans. –Hardware deliveries don’t optimally support I&T flow. (TEM/PS)

I&T Two Tower IRR 9 GLAST LAT ProjectNovember 18, 2004 Two Tower IRR Agenda IntroductionE. Bloom Safety OverviewK. Fouts I&T PlanK. Fouts Break IFCTK. Fouts/B. Grist Lunch MGSEK. Fouts QA StatusD. Bartholomew OnlineE. Bloom Break Particle TestE. Bloom SVAC PlanE. Bloom Summary of Open ItemsD. Horn »Procedures – Electrical (lack of test definition) »MGSE – PAP »Tracker – lack of dry run experience with realistic EM. »Subsystem Script deliveries. »Survey and Alignment plans. »Hardware deliveries don’t optimally support I&T flow. (TEM/PS) »Other?