Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.

Slides:



Advertisements
Similar presentations
10-1 © Prentice Hall, 2004 Chapter 10: Selecting the Best Alternative Design Strategy Plus Project Management Concepts.
Advertisements

Investigating and Determining System Requirements
Chapter 2 The Origins of Software
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Unit 8 Design Strategies and Refactoring. Key Concepts Design strategy deliverables Requirements and constraints Outsourcing Sources of software Platform.
Acquiring Information Systems and Applications
CHAPTER 10 & 13 IS within the Organization & Acquiring IS and Applications.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 7.1.
7.1 DESIGN OVERVIEW: SELECTING DESIGN ALTERNATIVES IMS Systems Analysis and Design.
Lecture 6 Generating and Selecting Design Alternatives IMS1002 /CSE1205 Systems Analysis and Design.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright © 2002 Pearson Education, Inc.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 7.1.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
CHAPTER 9: Structuring System Requirements: Conceptual Data Modeling Conceptual Data Modeling 1.1 MSIS 5653 Advanced Systems Development Dursun Delen,
Introduction to Systems Analysis and Design
Acquiring Information Systems and Applications
Chapter 2 The Origins of Software
PHASE 3: SYSTEMS DESIGN Chapter 8 System Architecture.
Initiating and Planning Systems Development projects
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 2 The Sources of Software 2.1.
Chapter 2 The Origins of Software Modern Systems Analysis and Design.
Source: J. Hoffer ,J. George, J. Valacich
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
© 2005 by Prentice Hall 2-1 Chapter 2 The Origins of Software Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F. George Joseph.
R McFadyen Chapter 10 Selecting the Best Alternative Design Strategy.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 7 Structuring System Requirements: Conceptual Data Modeling 7.1.
Acquiring Information Systems and Applications
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 3 Systems Planning and Selection 3.1.
Systems Analysis Requirements Determination Requirements Structuring
CHAPTER 13 Acquiring Information Systems and Applications.
Chapter 2 The Origins of Software Modern Systems Analysis and Design Fifth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Selecting the Best Alternative Class 19. SDLC Project Identification & Selection Project Initiation & Planning Analysis *** Logical Design Physical Design.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
Chapter 2 The Origins of Software Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich created by Mr.Mohammed.
Chapter 2 The Origins of Software Modern Systems Analysis and Design Fifth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
10-1 © Prentice Hall, 2004 Chapter 10: Selecting the Best Alternative Design Strategy Object-Oriented Systems Analysis and Design Joey F. George, Dinesh.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Cis339 Chapter 2 The Origins of Software 2.1 Modern Systems Analysis and Design Fifth Edition.
8-1 © Prentice Hall, 2007 Topic 8: Selecting the Best Alternative Design Strategy Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra,
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Chapter 11 Selecting the Best Alternative Design Strategy Modern Systems Analysis and Design Third Edition 11.1.
Selecting the Best Alternative Design Strategy. Two basic steps 1.Generate a comprehensive set of alternative design strategies 2.Select the one design.
Lecture 2 The Sources of Software. Copyright © 2011 Pearson Education, Inc. 2 Chapter 2 Introduction There are various sources of software for organizations.
2-1 Chapter 2 The Origins of Software Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 2.1.
Chapter 2 The Origins of Software
Systems Analysis and Design in a Changing World, Fifth Edition
2 Selecting a Healthcare Information System.
Chapter 2 The Origins of Software
Chapter 7 Structuring System Requirements: Conceptual Data Modeling
Systems analysis and design, 6th edition Dennis, wixom, and roth
Chapter 2 The Origins of Software
Chapter 2 The Origins of Software
Systems analysis and design, 6th edition Dennis, wixom, and roth
Modern Systems Analysis and Design Third Edition
Modern Systems Analysis and Design Third Edition
Chapter 11 Selecting the Best Alternative Design Strategy
Chapter 7 Selecting the Best Alternative Design Strategy
Chapter 2 The Origins of Software
Chapter 7 Structuring System Requirements: Conceptual Data Modeling
Modern Systems Analysis and Design Third Edition
Chapter 11 Selecting the Best Alternative Design Strategy
Modern Systems Analysis and Design Third Edition
Presentation transcript:

Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1

Selecting the Best Alternative Design Strategy Two basic steps 1.Generate a comprehensive set of alternative design strategies 2.Select the one design strategy that is most likely to result in the desired information system Process – Divide requirements into different sets of capabilities – Enumerate different potential implementation environments that could be used to deliver the different sets of capabilities – Propose different ways to source or acquire the various sets of capabilities for the different implementation environments 11.2

Selecting the Best Alternative Design Strategy Deliverables 1. At least three substantially different system design strategies for building the replacement information system 2. A design strategy judged most likely to lead to the most desirable information system 3. A Baseline Project Plan (BPP) for turning the most likely design strategy into a working information system 11.3

Generating Alternative Design Strategies Best to generate three alternatives – Low-end Provides all required functionality users demand with a system that is minimally different from the current system – High-end Solves problem in question and provides many extra features users desire – Midrange Compromise of features of high-end alternative with frugality of low-end alternative 11.4

Drawing Bounds on Alternative Designs Minimum Requirements – Mandatory features versus desired features – Forms of features Data Outputs Analyses User expectations on accessibility,response time and turnaround time 11.5

Drawing Bounds on Alternative Designs Constraints on System Development – Date when system is needed – Financial and human resources – Elements of the system that cannot change – Legal and contractual considerations – Dynamics of the problem 11.6

Issues to Consider in Generating Alternatives Outsourcing – The practice of turning over responsibility of some to all of an organization’s information systems applications and operations to an outside firm – Can provide a cost effective solution 11.7

Issues to Consider in Generating Alternatives Sources of Software – Hardware manufacturers – Packaged software producers – Custom software producers – Enterprise solution software – Application Service Providers – In-house development 11.8

11.9

Criteria for Choosing Off-the-Shelf Software Cost – In-House versus purchased Functionality – Mandatory, essential and desired features Vendor Support – Installation – Training – Technical Support Viability of Vendor 11.10

Criteria for Choosing Off-the-Shelf Software Flexibility – Ease of customization Documentation – User documentation – Technical documentation Response Time Ease of Installation 11.11

Validating Purchased Software Information Information from vendor – Request for proposal A document provided to vendors to ask them to propose hardware and system software that will meet the requirements of your new system Software evaluation period Customer references from vendor Independent software testing service Trade publications 11.12

Hardware and Software Issues Existing Platform 1.Lower costs 2.Information system staff is familiar with operation and maintenance 3.Increased odds of successfully integrating system with existing applications 4.No added costs of converting old systems to new platform or transferring data New Hardware and System Software 1.Some software components will only run on new platform 2.Developing system for new platform gives organization opportunity to upgrade technology holdings 3.New requirements may allow organization to radically change its computing operations 11.13

Implementation and Organizational Issues Implementation Issues – Technical and social aspects of implementation need to be addressed – Training – Disruption of work Organizational Issues – Overall cost and availability of funding – Management support – User acceptance 11.14

Hoosier Burger’s New Inventory Control System Replacement for existing system Figure 11-2 ranks system requirements and constraints Figure 11-3 shows steps of current system When proposing alternatives, the requirements and constraints must be considered 11.15

Hoosier Burger’s New Inventory Control System Figure 11-4 lists 3 alternatives – Alternative A is a low-end proposal – Alternative C is a high-end proposal – Alternative B is a midrange proposal 11.16

Hoosier Burger’s New Inventory Control System Selecting the most likely alternative – Weighted approach can be used to compare the three alternatives – Figure 11-5 shows a weighted approach for Hoosier Burger – Left hand side of table contains decision criteria Constants and requirements Weights are arrived at by discussion with analysis team, users and managers – Each requirement and constraint is ranked 1 indicates that the alternative does not match the request well or that it violates the constraint 5 indicates that the alternative meets or exceeds requirements or clearly abides by the constraint 11.17

Hoosier Burger’s New Inventory Control System Selecting the most likely alternative – According to the weights used, alternative C appears to be the best choice 11.18

Updating the Baseline Project Plan (BPP) The Baseline Project Plan (BPP) was developed during project initiation and planning Baseline Project Plan (BPP) can be used as an outline of a status report at analysis phase Schedule will be updated to reflect actual activities and durations An oral presentation of project status is typically made at this phase 11.19

Internet Development: Selecting the Best Alternative Design Strategy Pine Valley Furniture WebStore – Requirements and constraints were compiled by consultant and team (see Table 11-8) 11.20

Internet Development: Selecting the Best Alternative Design Strategy – Proposed system is a scalable, three-tier approach Scalable – The ability to seamlessly upgrade the system through either hardware upgrades, software upgrades or both Three-tier – Web Server » Provides connection to the internet and presentation of HTML page – Applications Server » Middle layer of software and hardware that lies between Web server and corporate network – Corporate network » Existing organizational computing infrastructure 11.21