Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Psychological Aspects of Risk Management and Technology – Overview.

Slides:



Advertisements
Similar presentations
5th Module: Evaluating Information Systems: Structure: 1.Reasons for IS Evaluation 2.Difficulty of IS Evaluation 3.Evaluation Techniques 4.Evaluation in.
Advertisements

HRM A – G. Grote ETHZ, WS 06/07 HRM A: Work process design Overview.
Chapter 7 Control and AIS Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 7-1.
Grow Your Business through Contact Centre Outsourcing Fanny Vaz Director, Personal Market Unit, CTM.
EFFECTIVE DELEGATION AND SUPERVISION
Testing Without Executing the Code Pavlina Koleva Junior QA Engineer WinCore Telerik QA Academy Telerik QA Academy.
Automation and Ability Benjamin A. Clegg Department of Psychology Colorado State University Eric D. Heggestad Department of Psychology University of North.
Topics HRM B: Leading teams
Chapter 7 Control and AIS Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 7-1.
HRM A – G. Grote ETHZ, WS 06/07 Human Resource Management (HRM) What? …the functional area of an organization that is responsible for all aspects of hiring.
HRM: Leading teams – G. Grote ETHZ, Spring Semester 08 Topics HRM: Leading teams.
Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Psychological Aspects of Risk Management and Technology – Overview.
HRM: Work Process Design – G. Grote ETHZ, Fall08 HRM: Work process design Overview.
Review 4 Chapters 8, 9, 10.
Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Psychological Aspects of Risk Management and Technology – Overview.
The Analyst as a Project Manager
CISB444 - Strategic Information Systems Planning
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Management Roles, Functions, and Skills
HRM: Leading teams – G. Grote ETHZ, Spring Semester 08 Topics HRM: Leading teams.
CONTACT SEMINAR November 2008 Project management tools.
Decision Making Upul Abeyrathne, Dept. of Economics, University of Ruhuna, Matara.
Performance Management Upul Abeyrathne, Dept. of Economics, University of Ruhuna, Matara.
Team Leadership AGED 3153.
Management Roles, Functions, and Skills
Strategy Implementation
Control environment and control activities. Day II Session III and IV.
Release & Deployment ITIL Version 3
What is Business Analysis Planning & Monitoring?
3rd Phase: 3rd Phase: PROJECT ORGANISATION Plan  Implementation  Recruit staff and organize project team members  Assign responsibility for Work packages.
Management Roles, Functions, and Skills
Degree and Graduation Seminar Project Management Processes
Test Organization and Management
Diagnosis of safety culture: A replication and extension towards assessing "safe" organizational change processes Gudela Grote Professor of Work and Organizational.
VTT-STUK assessment method for safety evaluation of safety-critical computer based systems - application in BE-SECBS project.
A COMPETENCY APPROACH TO HUMAN RESOURCE MANAGEMENT
Module 4: Systems Development Chapter 12: (IS) Project Management.
1 Contact: From Evaluation to Research Description of a continuum in the field of Global Education.
Georgia Institute of Technology CS 4320 Fall 2003.
Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Psychological Aspects of Risk Management and Technology – Overview.
© 2011 Delmar, Cengage Learning Part IV Control Processes in Police Management Chapter 12 Control and Productivity in the Police Setting.
16 Chapter Management Control McGraw-Hill© 2004 The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 6-1 Chapter 6 CHAPTER 6 INTERNAL CONTROL IN A FINANCIAL STATEMENT AUDIT.
SOFTWARE PROJECT MANAGEMENT
Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Psychological Aspects of Risk Management and Technology – Overview.
Principles behind ISO/IEC 17025
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Project Management Basics. 2 Please introduce yourself…  Name  Business Unit / Function / Process  Current Project / Process  Team Size  Ice Breaker.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Copyright © 2007 Pearson Education Canada 9-1 Chapter 9: Internal Controls and Control Risk.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Slide n° 1 EU railway legislation - Safety regulatory framework NAB/RB training workshop in Valenciennes, April 2016 NAB/RB Training Workshop In Valenciennes,
HIGH SPEED RAIL ASSESSMENT NORGE
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Lecture 5 Control and AIS Copyright © 2012 Pearson Education 7-1.
EFFECTIVE DELEGATION AND SUPERVISION
Information Aids for Diagnosis Tasks Based on Operators’ Strategies 김 종 현.
HRM A: Tutorial job analysis © ETH Zürich | Taskforce Kommunikation.
Integrate human considerations into Air Transportation System description Camille RAYMOND Our work aims to contribute to one of the most challenging.
Chapter 14: Team Leadership
Organizational Learning
Strategic Information Systems Planning
MANAGEMENT SYSTEMS Accounting, Control, and Decision making
Introduction to Core Concepts
MANAGING HUMAN RESOURCES
Human Resource Development Strategy and Tactics
FOUNDATIONAL CONCEPTS
Chapter 14: Team Leadership
Human Resource Development Strategy and Tactics
Presentation transcript:

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Psychological Aspects of Risk Management and Technology – Overview

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 "The correct functioning of the train control system and the automatic traffic control system is to be monitored by the signaller. If necessary, he/she has to intervene manually. During normal operation, no monitoring is necessary as long as the operational requirements are met. In the case of disturbances or incidents, the notification of the required services and the required alarm procedures must be guaranteed." (Excerpt from the rule book of a European railway company)

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Supervisory control (Sheridan, 1987)  Planning off-line what task to do and how to do it  Teaching the computer what was planned  Monitoring the automatic action on-line to make sure all is going as planned and to detect failures  Intervening when deviations occur or plans change  Learning from experience in order to improve performance

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Ironies of automation (Bainbridge, 1983)  "If decisions can be fully specified then a computer can make them more quickly than a human operator can. There is therefore no way in which the human operator can check in real-time that the computer is following its rules correctly. If the computer is being used to make the decisions because human judgement and intuitive reasoning are not adequate in this context, then which of the decisions is to be accepted? The human monitor has been given an impossible task."  Attempts at removing humans from automated systems increase their importance as system back-up, while at the same time reducing human capabilities and motivation for adequate judgment of technical functioning and adequate intervention.

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Design challenges in automated systems  Avoiding mix of qualitative overload and quantitative underload  Avoiding leftover activities in automation gaps  Securing implicit knowledge  Providing fit between accountability and control

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Strategies for distributing tasks between human and technology

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09  Coping with ill-defined problems  Handling complex, but well- defined tasks Relative capabilities of humans and machines

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Critique of comparison strategy  Humans and technology cannot be quantitatively compared  The same function is carried out in qualitatively different ways by humans and technology  Humans and technology do not substitute, but complement each other  Instead of either-or decisions, the interaction between humans and technology needs to be designed  Task requirements are determined by interactions between differen functions  Automating one function will influence handling of another function by the human

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Overcoming the ironies of automation through the design principle of complementarity  Designing the interaction between human and technical system based on complementary differences creating a new performance quality –technology not as competitor and not as imitation of the human operator, aiming at replacing him, but as –complementary support of human strengths (e.g. solving of ill-defined problems) and compensation of human shortcomings (e.g. unreliable repetition of monotonous operations)  Supporting human control over technical systems and the human's role as system manager

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Propositions for safe design of automation  Every automated system is a socio-technical system, irrespective of its degree of automation.  People are accountable for correct system functioning even in fully automated systems.  Accountability requires control over the technical system in terms of system transparency and predictability and proper means for influencing the system.  Instead of either-or decisions based on quantitative comparisons of capabilities and performance, human- technology interaction is to be designed based on complementary use of qualitatively different performance potentials.  System control is determined by the distribution of tasks between human and technology and between people.

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Objectives of the design method KOMPASS (Grote et al., 2000; Wäfler et al., 2003)  Embedding function allocation decisions in job and organizational design  Supporting task design that considers cognitive as well as motivational preconditions and outcomes  Supporting prospective design in interdisciplinary teams  Balancing of user participation and reliance on expert criteria  Implementing a complementary design philosophy

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 KOMPASS: Global design objectives  Work system: Local regulation of system variances and disturbances  Individual work task: Competence development and intrinsic motivation  Human-technology interaction: Human control over technology

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 KOMPASS: Design criteria

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Manual Manual, technically supported Manual, technically supported and constrained Automatic, manually comfirmed Automatic Manual, technically constrained Design objective: Fit between level of information and execution authority and between overall authority and responsibility Example of KOMPASS criteria: Information and execution authority

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 KOMPASS: Design heuristic  Phase 1: Expert analysis of existing work systems.  Phase 2: Discussion of design philosophy. –Step 2.1. Definition of the primary task and the functions of the planned work system. –Step 2.2. Definition of a shared evaluation concept to differentiate between successful and unsuccessful work systems. –Step 2.3. Identification of the main potentials for improvement and design objectives –Step 2.4. Identification of the potential contributions to a successful work system by human operator, technical system and organizational conditions. –Step 2.5. Specification of the working conditions required for human operators to make their specific contributions. –Step 2.6. Decision on usefulness of the KOMPASS criteria for the analysis, evaluation and design of work systems.  Phase 3: Derivation of concrete design requirements. –Step 3.1. Derivation of requirements for system design. –Step 3.2. Definition of work packages.

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 KOMPASS application  Analysis of different scenarios for task distribution and work process design regarding KOMPASS criteria  Applying KOMPASS design heuristic to gain understanding of (implicit) assumptions in scenarios regarding e.g. –competence for handling and power for transferring uncertainties by the different actors –role of technology vs. different human operators as back-ups

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 But...  Are we approaching limits of human control over techology?  Increasing complexity and uncertainty in system networks and learning systems –example Air Traffic Management –example Pervasive computing

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Design for (partial) non-controllability  Giving human operators information about the limits of control  Shifting accountability to system designers and operating organizations for handling limitations of operator control  Gaining control by giving up control ?

Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Designing driverless cars  Develop a general scenario for introducing driverless cars  Describe the distribution of tasks in the scenario  Describe the distribution of control and accountability in the scenario