June 19, 2008 Heinz-Dieter Nuhn, SLAC / LCLS Overview 1 Overview Heinz-Dieter Nuhn, SLAC / LCLS June 19, 2008 Introduction Workshop.

Slides:



Advertisements
Similar presentations
Workshop Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Diagnostics.
Advertisements

DELTA Project Overview Heinz-Dieter Nuhn – LCLS Undulator Group Leader Presented at LCLS-II Physics Meeting Tuesday, October 11, 2011.
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
Beam-Based Alignment with New Parameters Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
Welcome to Quark Net 2011 Wayne State University Physics Department.
LCLS Beam Parameters, Status and Run Schedule Rick Iverson for the LCLS team 1 R. Iverson ESTB Workshop SLAC, March 2011.
Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Undulator Checkout and Startup Plans Heinz-Dieter.
January 24, 2008 Heinz-Dieter Nuhn, SLAC / LCLS Undulator BLM PDR Review 1 Undulator BLM PDR Review Heinz-Dieter Nuhn, SLAC / LCLS.
Workshop Introduction Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Diagnostics.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Undulator Physics April 29, 2004 Heinz-Dieter Nuhn, SLAC / SSRL Facility Advisory Committee Meeting Undulator Physics Diagnostics.
LCLS undulator diagnostics and commissioning workshop January 19-20, 2004 (UCLA) Zhirong Huang, SLAC 1 Linac Coherent Light Source.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
ICRS-11 / RPSD-2008 Mario Santana Leitner FLUKA SIMULATIONS of the radiation damage of permanent magnets M. Santana Leitner,
June 19, 2008 Heinz-Dieter Nuhn, SLAC / LCLS LCLS Magnet Damage Management 1 LCLS Magnet Damage Management Heinz-Dieter Nuhn, SLAC.
Undulator Physics Requirements April 7, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Facility Advisory Committee Meeting Undulator Physics.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
E166 “Polarized Positrons for Future Linear Colliders” John C. Sheppard E166 Co-spokesman SLAC: August 31, 2004.
BLM review Mario Santana Leitner OUTLOOK ON FLUKA SIMULATIONS FOR UDULATOR DAMAGE AND BLM RESPONSE Mario Santana Leitner, Alberto.
Undulator Commissioning September 22, 2004 Heinz-Dieter Nuhn, SLAC / SSRL LCLS Commissioning Workshop Undulator / FEL Commissioning.
Undulator Overview FEL Performance Assessment
Jess Albino FAC CF April 16, 2007 Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities Jess.
PRDs, ESDs, ICDs Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
LCLS Linac Long Lead Procurement Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
Physics Requirements – October 20, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Internal LCLS Undulator Alignment and Motion Review 1 Physics.
Undulator Physics Update October 12, 2004 Heinz-Dieter Nuhn, SLAC / LCLS Facility Advisory Committee Meeting Undulator Physics Update.
LCLS Undulator Magnet Irradiation Sensitivity Workshop Thursday June 19, 2008 Jeff Dooling 1 SLAC Redwood Room A/B, SLAC Thursday, June.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
Undulator Gap Increase Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Stephen Milton Undulator System 14 November, 2004 Undulator System Overview Stephen Milton.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
Mike Scharfenstein FAC Review - November 11, 2008 SLAC National Accelerator Laboratory 1 Environment Safety & Health Status.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
April 16, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
9/22/04J. Welch, LCLS Commissioning Worskhop, SLAC LCLS Commissioning Schedule and Startup Plan LCLS Commissioning Schedule and Startup Plan.
Undulator Specifications Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Oct. 30, 2007 LCLS FAC D. Fairley MATLAB Feedback Phase II Commissioning.
Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 1 Introduction Heinz-Dieter.
Geant4 Documentation and User Support Geant4 Users Workshop February 2002 Dennis Wright (SLAC)
1 Heinz-Dieter Nuhn 1 Undulator Plans June 2009 FAC Undulator Commissioning Heinz-Dieter Nuhn – LCLS Undulator Group Leader June.
EM vs. PM Quads Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
Undulator Working Group Summary Heinz-Dieter Nuhn – Alexander Temnykh Presented at Friday, March 9, 2012.
IEEE 64 th ECTC – Orlando, FL, USA May 27–30, 2014 Add Company Logo Here.
Greensboro City Advisory Group on Sustainability Plan of Work General Activities Meeting Schedule Typical Meeting Agenda Ongoing Activities.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
AGENDA 2:00 – 3:00: Mingling 3:00 – 3:30: Presentation 3:30 – 4:00: Q & A 4:00 – 5:00: Get Involved / Volunteer Info.
T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status 1/22/08 1 LCLS Undulator Undulator Network.
D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
SLAC Accelerator Department Type A Investigation and PEP-II John T. Seeman Assistant Director of the Technical Division PEP-II MAC Meeting December 13,
11/15/20051 Radiation Protection Issues for ILC (not exhaustive) A. Fassò, N. Noriaki, H. Vincke Radiation Physics.
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
Title 2 nd X-band Accelerator Structure Design and Test-Program Collaboration Meeting Discussion with WebEx on March 17 between CERN and KEK W. Wuensch,
Application to FELs. Working Group C Summary Application to FELs, Working Group C Report July 5, 2002 Heinz-Dieter Nuhn, SLAC / SSRL
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
Oct. 6, ILC Positron Source Group Meeting Short report by S. Riemann September 2006, RAL.
ITE Hirakjyoti Nath Class 7
Welcome to WAO 2012.
Welcome to an Introduction to Technology at Illinois State University!
High School Engineering Design Training
Electron Beam Systems Wrap-up
Presentation transcript:

June 19, 2008 Heinz-Dieter Nuhn, SLAC / LCLS Overview 1 Overview Heinz-Dieter Nuhn, SLAC / LCLS June 19, 2008 Introduction Workshop Schedule Tour Introduction Workshop Schedule Tour

June 19, 2008 Heinz-Dieter Nuhn, SLAC / LCLS Overview 2 Introduction Welcome to this one-day collaboration workshop to discuss experimental programs to determine the sensitivity of the magnetization of permanent magnet undulators to ionizing radiation. The workshop website is at: This workshop is a follow-up to the Accelerator Collaboration meeting that was held on October 21-22, 2007 in Japan. Main workshop topics are The present status of the work done. Strategies for future experiments Simulation support Welcome to this one-day collaboration workshop to discuss experimental programs to determine the sensitivity of the magnetization of permanent magnet undulators to ionizing radiation. The workshop website is at: This workshop is a follow-up to the Accelerator Collaboration meeting that was held on October 21-22, 2007 in Japan. Main workshop topics are The present status of the work done. Strategies for future experiments Simulation support

June 19, 2008 Heinz-Dieter Nuhn, SLAC / LCLS Overview 3 Agenda

June 19, 2008 Heinz-Dieter Nuhn, SLAC / LCLS Overview 4 Tour 16:30 – 17:00 Undulator Hall 17:00 – 17:15 Klystron Gallery 17: :00 MMF 16:30 – 17:00 Undulator Hall 17:00 – 17:15 Klystron Gallery 17: :00 MMF

June 19, 2008 Heinz-Dieter Nuhn, SLAC / LCLS Overview 5 End of Presentation