WLS Fiber Pigtails Howard Budd University of Rochester Dec 15 2007 T2K Collaboration Meeting.

Slides:



Advertisements
Similar presentations
And (addition) She cleans the floor and she sometimes serves food She starts work at 4.30 and she finishes at 8.30 I would like to go to university, get.
Advertisements

Light... ORB Education Quality Teaching Resources ORB Education Visit for the full, editable versions with solutions. ScP033.
Question Answer What grade (%) do you think you got on your Cell Test that you took yesterday? Do Now: Thursday, December 20 th If you werent here to take.
OCTOBER REFLECTION. COLLABORATION SUMMARY During the month of October, I met with my mentor once. I recently changed the topic of my 8 th grade project,
Ff. Directions: 1.Click on the picture that begins with Ff. 2.The pictures are linked to a slide that will tell you if you got it correct or you need.
WEEK 6: PREPARING FOR BA4, PT. 2 Thesis structure & Function.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
Building a Sampling Needle for a GasBench Impress your friends! Dominic M. Colosi 2009.
EXCEED RTI Systems Admin Training RIDE, Dec 2012.
MINER A NuMI MINER A Director’s Review 10 January 2005 H. Budd Univ. of Rochester Optical Cables and Scintillator Extrusions 10 January MINERvA.
MINER A Director’s CD-3b Review 11 June 2007 Kevin McFarland University of Rochester 1MINERvA WBS 1,2,4: Scintillator and Fiber Fiber Milestones: WLS Fiber.
Nov. 7 report (2 nd Nov. 7 of today) Hawaii/Marc.
Polishing the Ferrules Howard Budd Sep Polishing Epoxy on the Ferrule We glued fibers in the 10 ferrules that Dave Warner gave us One problem.
1 Z cables with New Fiber Howard Budd University of Rochester Rochester Meeting Jul
1 Start at Estimating Cable Labor Howard Budd University of Rochester Rochester Meeting Nov
MINERvA Simulation - HCAL and ECAL Calorimetry Jaewon Park University of Rochester MINERvA Collaboration Meeting, Sep 29, 2006.
Fiber Attenuation Length Test for MINERvA Jaewon Park University of Rochester Jupiter/MINERvA Meeting, Sep 10, 2005.
1 Preliminary Cable Labor Estimate Howard Budd University of Rochester Rochester Meeting Dec
Diamonds & R&D on Pigtails Howard Budd Sep
Polishing the Ferrules Howard Budd Aug Visit We visited the place where the polisher is made We got 2 collets which the ferrules fit well in.
Measuring the Ferrules Howard Budd Aug Measuring the Nipple The caliper used to measure the nipple This picture is to show how we measure the.
Polishing the Ferrules Howard Budd Sep Polishing Epoxy on the Ferrule We glued fibers in the 10 ferrules that Dave Warner gave us One problem.
Polishing the Ferrules Howard Budd Aug Looking at the Old Ferrules I found 3 polished ferrules One was shown in the previous ppt file We photographed.
Diamonds & t2k production Howard Budd Oct
Scintillating Fiber, Ribbon Production, Cryo Update Alan Bross MICE Tracker Meeting IC November 8, 2006.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
1 Production 2 WLS QC Howard Budd University of Rochester Rochester Meeting Oct
Zebra connectors KAREN PALMER SARAH JONES. Companies Company Price/100 connectors ($) Additional Charges ($) Estimated Delivery notes Fujipoly< 17.13*
UTA Utah Transit Authority Kia Matthews. Introduction Utah Transit Authority is a provider of public transportation throughout the Wasatch Front of Utah,
1 Lesson Estimation. 2 Lesson Estimation California Standard: Mathematical Reasoning 2.3 Estimate unknown quantities graphically and solve.
The web site for the free bar code generator is below
Information guide.
How to budget? Or more importantly - how to control our spending?
December 2,  Cyber Monday – Definition  Review Do’s & Don’ts  Homework worksheet  Tomorrow –Resume Writing – Getting your foot in the door!
DATE: ______/_______/_______NAME: ________________________________________________________________________________ Assignment: As part of our preparation.
1 Stony Brook Update Stretching your LEGS T.K. Hemmick for the tent crew.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Summery Scotland Our logo is a thistle because the Scottish national emblem is a thistle.
A little help Formatting Your Magazine Prepared especially for you by Mrs. Bianco.
D0 PMG 12/2/99 Fiber Tracker Status  Carbon fiber work u All support cylinders done u Some work remains on band/support pieces + work for Silicon Detector.
Wants and Needs Does this girl want a pet or does she need a pet? Look at the story Go to questions.
© 2015 albert-learning.com Beginners Writing Exercise 2 BEGINNERS WRITING EXERCISE 2.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
Problem of the Week! Kathy is selling lemonade for 5 cents a cup. Each cup holds 4 ounces of lemonade. She started selling lemonade at the time shown on.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
Sight Words.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Scintillator Strips DongHee Kim Kyungpook National University Daegu, South Korea.
© 2014 wheresjenny.com BEGINNERS WRITING EXERCISE2.
Christmas Around the World Matching Quiz Directions Think about the countries we studied this week. Think about the countries we studied this week. Look.
1 Stony Brook Update: Another Frustrating week... However difference is isolated: CF 4 T.K. Hemmick for the Tent Crew.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Strip Scintillator DongHee Kim Kyungpook National University Daegu, South Korea.
SLAMS To write a good answer to a question, SLAM it!!
Correctors for the J-PARC Proton Beam Line Peter Wanderer BNL Superconducting Magnet Div. September 8, 2007 T2K US B280 Collaboration Mtg.
Dan Cheng, Maxim Marchevsky 9/9/2014 Copper Plated Trace Development Update.
English: Monday, December 3, Handouts: * Grammar #29 (Indefinite Pronouns) 2.Homework: * Grammar #29 (Indefinite Pronouns) * If you don’t finish.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Monday, November 10 th Assessments: 1.Friday Wrap-Up 2.Editing Blitz 3.Revising and Q&A Assignments: Friday: Narrative R.D. & F.D. Topic: Editing Level:
Unit 4 Test Review Study, study, study and practice, practice, practice your division!!!!! You will go a great job, I believe in you! You will go a great.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
Student Orientation. Each lesson contains 4 sections:  Lesson Presentation  Tutor  Independent Practice (“IP” for short)  Quiz  Pass  continue to.
Prepositions of time. in  periods of time: in the evening, in my lunch break, in the summer, in the 20th century  points at the end of a period of time:
ECAL LED monitoring system upgrade status 04/09/20131.
PSY 103 Week 3 Individual Remembering, Feeling, and Thinking Worksheet Complete the Remembering, Feeling, and Thinking worksheet located on your student.
School study.
1 Complete the sentences with the words given.
Support Structure Fabrication
C-O-A-C-H Finish these two sentences: Coaches are… Coaches plan for…
Variation Translation 1. Pick any noun, or the noun of the week 2
THE 320 POUND WOMAN.
Presentation transcript:

WLS Fiber Pigtails Howard Budd University of Rochester Dec T2K Collaboration Meeting

Ferrules We have a sample of ferrules from CSU At some point we will need the full sample The nipple seems to be the correct length The techs have glued short fibers in 4 ferrules Not much epoxy flowed onto the nipple, but it looks like enough epoxy surrounded the fibers that they can be polished However, the ferrules are too loose in the collets Hence, we will not be able to polish them

Ferrules We will make a trip to FiberFin on Monday FiberFin will prepare the machine to polish the ferrules In previous times, we got 2 collets Don’t know when we will get the machine back the last time it took 1 week to get the machine back But this is over Christmas The fibers are prepared Probably start the production after new year. If there are no problems, we should be able to ship the fibers after 2-3 weeks

Production Quote from Kuraray for fiber + 70 QC fiber mm fiber mm fibers mm qc fibers 80.5 K From MINERvA it usually takes roughly 6 weeks to get the fibers But this is over Christmas & Japan shuts down over Christmas Hence, they should be purchased as soon as possible.

Mirroring FNAL has given a mirroring estimate of 70.1K The person giving this estimate feels that the cost will be this number or below. The cost does not include shipping out of FNAL She has a good understanding of her production processes She feels that she can finish this job in about 4-5 months She has to determine her work load She tries to have enough work to keep her crew busy If one wants to mirror fiber FNAL should be informed soon, atleast informally In addition, because of how production is taking place in one of the experiments that needs her mirroring, there is a lull in their need for mirrored fiber If t2k needs mirrored fibers, they should try to fill that lull, as the lull will not be indefinite.

Shipment of 10 Pigtails to Stony Brook Picture of 2 of the polishes of the fibers that were send to Stony Brook

FiberFin Polisher We use MINERvA ferrules to test the polishing of the FiberFin polisher Paul at FIberfin setup the polisher for us. I think MINERvA ferrules are Delrin with carbon black. Note, this is not the FiberFin polisher we would use, that is shown on the previous page