Angra dos Reis — Brazil. Reactor Specs Single Primary Reactor –4.5 GW peak power (4.1 average) –Allows measurement of backgrounds Approval from the reactor.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
ESTIMATING - A CONTRACTORS PERSPECTIVE. Company History/Background Oman Construction was founded in 1876 First bridge contract in 1881 First Highway Contract.
Cost Case Studies of Selected NRC Regulatory Requirements September 19 th, 2013.
Controlling Systematics in a Future Reactor  13 Experiment Jonathan Link Columbia University Workshop on Future Low-Energy Neutrino Experiments April.
Heeger theta13, May A Neutrino Project at Diablo Canyon.
Stokstad, Heeger NSD, May 1, 2003 Reactor Neutrino Measurement of  13 Measuring the Last Undetermined Neutrino Mixing Angle  13 Searching for Subdominant.
Strategies for Reading the Ruler
15 March 2004Cal Poly Meeting Status of Midwest  13 Effort Status of Braidwood site General strategy and layout of experiment Civil construction estimate.
Dounreay Nuclear and Chemical Land Contamination.
UK Nuclear Policy Andrew Beirne
Searching for an underground national lab in China Yifang Wang July 23, 2008.
Background Early 2000 Decision for Continued Campus Service Approval for Campus Funding Slow Alternative Service Materialization within Davis.
21 March 2004 Overview of Braidwood Reactor Experiment Introduction to Braidwood site General strategy and layout of experiment Underground construction.
Integration of PMF Data into AoH Analyses AoH Work Group Call June 7, 2006 Joe Adlhoch - Air Resource Specialists, Inc.
Braidwood Status Report Jonathan Link Columbia University APS Study, Reactor Working Group February 7&8, 2004.
12 December 2003APS Neutrino StudyE. Blucher APS Neutrino Study: Reactor Working Group What can we learn from reactor experiments? Future reactor experiments.
Gd Liquid scintillator: completion of the R&D! Stability 0,1 % Gd in PXE LENS R&D  new metal β-diketone molecule (MPIK) Stable: 0.1% Gd-Acac (few months)
The Pony Express versus The Telegraph. "Men Wanted” The undersigned wishes to hire ten or a dozen men, familiar with the management of horses, as hostlers,
Muon Rates as a function of Depth Edgar Casimiro Linares - CBPF Joao Carlos dos Anjos – CBPF Workshop on Angra Neutrino Detector Design – May 16-19, 2006.
John Osborne GS/SE March 2013
Possible Reactor Sites in the U.S. Jonathan Link Columbia University Workshop on Future Low-Energy Neutrino Experiments April 30 − May 2, 2003.
Tim Watson ST-CE CE Experience with External Consultants for the LHC Project.
Respiratory Effectiveness Group Study Proposal (REG) Insert name of Lead Investigator & key collaborating groups Please direct all questions and correspondence.
Geo Neutrino Detection at KamLAND F.Suekane RC S Tohoku University 5th Workshop on Applied Antineutrino Physics (AAP2009) Angra dos Reis, Brazil 20/03/2009.
Report on the recent IAEA Workshop on Antineutrino Detection for Safeguards Applications Andrew Monteith Division of Technical Support Department of Safeguards.
Nuclear Power Development History and Self-Reliance Practice in China August, 2013 Rio, Brazil.
Caren Hagner CSTS Saclay Present And Near Future of θ 13 & CPV in Neutrino Experiments Caren Hagner Universität Hamburg Neutrino Mixing and.
Eun-Ju Jeon Sejong Univ. Sept. 09, 2010 Status of RENO Experiment Neutrino Oscillation Workshop (NOW 2010) September 4-11, 2010, Otranto, Lecce, Italy.
Strategies for Reading the Ruler. Background – World Wide  Two main systems of measurement –Metric System  Based on the number 10 –U.S. Customary System.
By Ashok Pandit & Ralph Locurcio Personal Background.
Compliance Tracking/Notification First step - Set up compliance codes for your site.
28. JetBlue Airways. 1. Background: As a small and low cost airline, JetBlue has been one of successful small airline companies. Its operating strategy.
46a. Fatalities involving vehicles and heavy equipment in construction, (All employment) This research was conducted with restricted access to.
© University of Reading Dec 2009 Health and Safety Induction For Works Involving UoR Water Systems University of Reading.
Proposed Dwayne Lane Dealership Reference Slides.
1 P a l o m a r P o m e r a d o H e a l t h A California Health Care District Board of Directors 5/22/07.
Using Reactor Neutrinos to Study Neutrino Oscillations Jonathan Link Columbia University Heavy Quarks and Leptons 2004 Heavy Quarks and Leptons 2004 June.
Karsten M. Heeger US Reactor  13 Meeting, March 15, 2004 Comparison of Reactor Sites and  13 Experiments Karsten Heeger LBNL.
νeνe νeνe νeνe νeνe νeνe νeνe Distance (L/E) Probability ν e 1.0 ~1800 meters 3 MeV) Reactor Oscillation Experiment Basics Unoscillated flux observed.
The NOvA Experiment Ji Liu On behalf of the NOvA collaboration College of William and Mary APS April Meeting April 1, 2012.
Nuclear Power Plant Hearing Combined Construction Permit and Operating License.
L. Oberauer, Paris, June 2004   Measurements at Reactors Neutrino 2004 CdF, Paris, June chasing the missing mixing angle.
Future Reactor Neutrino Physics Soo-Bong Kim (KNRC, Seoul National University) “International Workshop on RENO-50, June 13-14, 2013”
Double Chooz Near Detector Guillaume MENTION CEA Saclay, DAPNIA/SPP Workshop AAP 2007 Friday, December 14 th, 2007
Daya Bay Reactor Neutrino Experiment On behalf of the DayaBay collaboration Virginia Polytechnic Institute and State University Joseph ykHor YuenKeung,
15 January Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
CENF CIVIL ENGINEERING : - DESIGN TENDER AND ESTIMATED COSTS John Osborne GS/SE 19 July 2013.
  Measurement with Double Chooz IDM chasing the missing mixing angle e  x.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES John Osborne GS/SE 16 May 2013.
ISD #727 – Big Lake Original Budget June 23 rd, 2015.
NEI SMR UK Summit 20 th October 2015 Paul Harding U-Battery.
NuFact 2008 The ANGRA Neutrino Project João dos Anjos On behalf of the Angra Collaboration: Centro Brasileiro de Pesquisas Físicas, Universidade Federal.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
WHO WE ARE 3.
Introduction Engineering geology is the application of geology in design, construction and performance of civil engineering works.
LDR 531 Week 3 Summary R-531/LDR-531-Week-3-Summary For more details
Foundation Repair in Kansas City
NEUTRINO OSCILLATION MEASUREMENTS WITH REACTORS
47b. Fatal injuries at road construction sites, by major industry, total (All employment)
Far Detector Performance and Calibration
Purchasing and Distribution Services Procurement Updates
Board of Regents Capital Projects Review & Approval Process
Overview of Vogtle Nuclear Power Plant
Far Experimental Hall Hutches Civil Construction

Value Engineering In Design
For More Details:
CMGC Overview SLAC Site Plan Systems Description Construction Schedule
Presentation transcript:

Angra dos Reis — Brazil

Reactor Specs Single Primary Reactor –4.5 GW peak power (4.1 average) –Allows measurement of backgrounds Approval from the reactor company –Site access –Reactor company is providing detailed civil construction cost estimates

The Site

Far Site Design

Summary Approval from Reactor Company –4.1 GW single reactor complex A Civil Construction Design Exists –Well known granite structure –Sent out to Local Contractors for detailed Cost Estimate (expected by March 20) Possible Detector Locations are restricted by local geology –Far site can have mwe –Near site has to be shallow