Angra dos Reis — Brazil
Reactor Specs Single Primary Reactor –4.5 GW peak power (4.1 average) –Allows measurement of backgrounds Approval from the reactor company –Site access –Reactor company is providing detailed civil construction cost estimates
The Site
Far Site Design
Summary Approval from Reactor Company –4.1 GW single reactor complex A Civil Construction Design Exists –Well known granite structure –Sent out to Local Contractors for detailed Cost Estimate (expected by March 20) Possible Detector Locations are restricted by local geology –Far site can have mwe –Near site has to be shallow