CIVL202 Construction Engineering I Tutorial 11 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.

Slides:



Advertisements
Similar presentations
Some Practice Questions in Engineering Economics
Advertisements

Engineering Economy Practice Problems
Interest and Equivalence L. K. Gaafar. Interest and Equivalence Example: You borrowed $5,000 from a bank and you have to pay it back in 5 years. There.
Copyright Oxford University Press 2009 Chapter 9 Other Analysis Techniques.
ENGG 401 X2 Fundamentals of Engineering Management Spring 2008 Chapter 7: Other Analysis Techniques Dave Ludwick Dept. of Mechanical Engineering University.
Engineering Economics I
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 2 Fundamental Concepts of Equipment Economics.
1 Warm-Up Review Homepage Rule of 72 Single Sum Compounding Annuities.
Engineering Economics Outline Overview
Unit 3 (cont.): Economic Analysis— Cost-Benefit Analysis 2.
CAPITAL BUDGETING AND LEASING Chapter 4. Investment The addition of durable assets to a business Disinvestment is the withdrawal of durable assets from.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Heating and Air Conditioning I Principles of Heating, Ventilating and Air Conditioning R.H. Howell, H.J. Sauer, and W.J. Coad ASHRAE, 2005 basic textbook/reference.
1 MER 439 Design of Thermal Fluid Systems Engineering Economics 3. Comparing Alternatives Professor Wilk Winter 2007.
CIVL202 Construction Engineering I Tutorial 10 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Engineering economics
Interest Formulas – Equal Payment Series Lecture No.5 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Present Worth Analysis Lecture No.15 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
(c) 2001 Contemporary Engineering Economics 1 Chapter 8 Annual Equivalent Worth Analysis Annual equivalent criterion Applying annual worth analysis Mutually.
CTC 475 Review Matching period and interest interval Matching period and interest interval Continuous Compounding Continuous Compounding Continuous Flow.
Interest Formulas – Equal Payment Series
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
EGR 403 Capital Allocation Theory Dr. Phillip R. Rosenkrantz
CIVL202 Construction Engineering I Tutorial 9 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Interest Formulas – Equal Payment Series
Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis.
1 تنمية المهارات الاقتصادية للمهندسين New Vision of Engineering Economy Teaching.
Equivalence Equations II Infinite number of changes of the interest rate within each year UNLIKE … Equivalence Equations I (where interest rate is constant.
Economic Comparison Fr Clinic II. Overview n Economics and Engineers n Time Value of Money n Different types of Economic Analyses n Comparing our filters.
ISU CCEE CE 203 More Interest Formulas (EEA Chap 4)
Chapter 10 Pricing Equipment. Renting Equipment There can be advantages to renting rather than owning construction equipment; including: –The builder.
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Evaluating Projects with Benefit/Cost Ratio Method
Naval Postgraduate School Time Value of Money Discounted Cash Flow Techniques Source: Raymond P. Lutz, “Discounted Cash Flow Techniques,” Handbook of Industrial.
EPT 221 Engineering Design Introduction to Engineering Economics.
Summer Time Value of Money Session 2 07/02/2015.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Chapter 4: The Time Value of Money
L15: Present Worth Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
ENGR 112 Economic Analysis II. Engineering Economic Analysis Time Value of Money $1 today is more valuable than $1 a year later Engineering economy adjusts.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Factors - Extra Problems Course Outline 3.
22-0 Incremental Cash Flows 22.4 After-tax lease payment (outflow) Lease payment*(1 – T) Lost depreciation tax shield (outflow) Depreciation * tax rate.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Present Worth and Annual Worth Course Outline 6.
Chapter 8 Long-Term (Capital Investment) Decisions.
EML EML Engineering Design Methods Engineering-Economics Introduction Economic Decision Rules Hyman: Chapter 8.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
Equivalence of cash flows Construction Engineering 221.
Engineering economy TUTORIAL
Prof Awad S. Hanna Equipment Costs and Sources of E QUIPMENT C OST.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Interest Formulas – Equal Payment.
MER Design of Thermal Fluid Systems INTRODUCTION TO ENGINEERING ECONOMICS Professor Bruno Winter Term 2005.
TM 661 M2 - Probs II. Consider a simple five year investment project with discrete end-of-year cash flows shown below. Revenue at the end of year one.
Water Resources Planning and Management Daene C. McKinney Economic Analysis of Alternative Water Plans: 1. Benefit/Cost Analysis.
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Annual Worth Analysis Course Outline 5.
(c) 2002 Contemporary Engineering Economics 1. Engineers must work within the realm of economics and justification of engineering projectsEngineers must.
Alternative Selection Construction Engineering 221 Economic Analysis.
Accounting Rate of Return mefielding.com1. Definition  Accounting rate of return (also known as simple rate of return) is the ratio of estimated accounting.
1 Engineering Economics Engineering Economy It deals with the concepts and techniques of analysis useful in evaluating the worth of systems,
Interest Formulas – Equal Payment Series
Tutorial 7 Homework Solution
Discounted Cash Flow Analysis
Example Problem A company is considering the purchase of a new piece of testing equipment that is expected to produce $8,000 additional income during the.
Construction Engineering 221 Economic Analysis
By Muhammad Shahid Iqbal
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
Capitalized Cost Refers to the present worth of an infinite series A
Alt Comparison by AW Not necessary to use LCM for different life alternatives Example: A company is considering two machines for a certain operation. Machine.
Example Problem A company is considering the purchase of a new piece of testing equipment that is expected to produce $8,000 additional income during the.
Applying Annual Worth Analysis
Presentation transcript:

CIVL202 Construction Engineering I Tutorial 11 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50

Tutorial Outline Present worth method B/C ratio method

Present worth method Present worth =equivalent annual cost/benefit*(P/A, i%, n) Equivalent annual cost/benefit=present worth*(A/P, i%, n) The same conclusion (why?)

B/C (benefit-cost) ratio B/C ratio= equivalent annual total benefits equivalent annual total costs B/C ratio= Present worth of total benefits Present worth of total costs B/C ratio >1, the project is worthwhile, and vice versa

sample A company can hire a machine for an all-inclusive rate of $125 per hour and on average makes use of such a machine for 1600 hours per year. The company is considering purchasing a machine as an alternative to hire and obtain the information given below: Cost of machine=$ Salvage value after 5 year=$ Annual insurance premiums=$3000 Annual tax=$1800 Fuel cost per hour=$50 Oil and grease cost=10% of fuel cost Annual maintenance=$15000 Annual cost of capital=18% Determine whether the company should purchase a new machine or continue to hire.

Formula Uniform series compound amount factor Uniform series sinking fund factor

Formula Present Worth Present worth factor Present worth of F = Uniform series present worth factor