Tracker Software 1M.Ellis - CM23 - Harbin - 15th January 2009  Four key areas that currently need some work: u Digitisation u Decoding files u Unpacking.

Slides:



Advertisements
Similar presentations
1 Simulation Status/Plans Malcolm Ellis Sci Fi Tracker Meeting Imperial College, 10 th September 2004.
Advertisements

1Malcolm Ellis - Tracker Meeting - 18th May 2006 Reconstruction Plans  Staged process of building up Reconstruction over the rest of this year  Will.
Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
1 Scintillating Fibre Tracker Simulation Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing.
1 Sci Fi Simulation and Reconstruction Status M.Ellis/C.Rogers Wednesday 31 st March 2004.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
Beam Position Monitors MICE CM Harbin January, 2009.
1Malcolm Ellis - Video Conference - 7th December 2006 Data Challenge Report  Disclaimer  Data Challenge definition(s)  Software status u G4MICE u GRID.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Linda R. Coney – 24th April 2009 Online Monitoring and Reconstruction Linda R. Coney 4 June, 2009.
Cosmic Ray Analysis 1M.Ellis - CM23 - Harbin - 15th January 2009  Not enough time to go into detail, so just a quick summary of the status since CM22:
Software Parallel Intro 1M.Ellis - CM23 - Harbin - 15th January 2009  Focus this CM continues to be on needs for analysis of data and use of G4MICE online.
1Malcolm Ellis - Software Meeting - 17th May 2006 MICE Model and MICERun  MiceModel: u Overall Model that is used throughout G4MICE to represent any stage.
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
1 G4MICE Malcolm Ellis SciFi Tracker Meeting, KEK Thursday 31st March 2005.
1Malcolm Ellis - Tracker Meeting - 6th November 2006 Tracker Software  Offline u Modeling u GRID u Tests u Decoding u Kalman fit u Reconstruction & “data.
1 G4MICE TOF Reconstruction & KEK Test Beam Analysis Update Aron Fish Tracker Phone Conference May 25, 2006.
Tracker Software Update Adam Dobbs, MICE CM37 7 th Nov 2013.
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
1M. Ellis - MICE CM th June 2007 Software Status Malcolm Ellis – MICE CM18 – 16 th June 2007.
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
1 Persistency – Update and Plans Malcolm Ellis Software Phone Meeting 25 th August 2005.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
1 Software for the KEK test Malcolm Ellis 13 th April 2005.
G4MICE Status and Plans 1M.Ellis - CM24 - RAL - 31st May 2009  Firstly, a correction to the agenda:  I failed to spot a mistake in the agenda that I.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Online Reconstruction 1M.Ellis - CM th October 2008.
25/06/2014A. Dobbs, Tracker Software: How To2 25/06/2014A. Dobbs, Tracker Software: How To3.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
M. Ellis - MICE Video Conference - 30th August Software Report Recent progress:Recent progress: –Start of code to read DATE format (two parts) One.
David Hutchcroft 1 VELO software. Lite clusters in Kalman fit 2 The VELO clusters are available both as a lite and “full” version Two consecutive blocks.
1 MICE Software Phone Conference Introduction 27 th July 2005 M. Ellis.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting U.C. Irvine Monday 21 st August 2006 M. Ellis & A. Bross.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
MICE Tracker Software A. Dobbs CM32 9 th Feb 2012.
M. Ellis - MICE Collaboration Meeting - Wednesday 27th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
1M. Ellis - Tracker PC - 7th March 2007 VLPC Cassette Characterisation  Third application (as described in past tracker meeting and CM17) is now working.
Requirements for the Software Group (and agreed actions)
Tracker Specific Software
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Models vs Representations
Tracker Software Status
Presentation transcript:

Tracker Software 1M.Ellis - CM23 - Harbin - 15th January 2009  Four key areas that currently need some work: u Digitisation u Decoding files u Unpacking DATE data u Helix Kalman fit

Digitisation  Now that we have calibration and decoding for the first MICE tracker the digitisation is going to be enhanced: u Read in actual calibration and cabling files. u Use these to generate ADC values with the same pedestal and gain as the real VLPCs. u Take into account the real dead channels in the tracker.  As a result, when we compare the light yield plots per plane between MC and data, it should be possible to achieve a very good agreement. 2M.Ellis - CM23 - Harbin - 15th January 2009

Decoding Files  The solution to the waveguide issues shown in CM22 has been done by Hideyuki in his own particular format.  G4MICE can read this (and an earlier format that he also produced), but neither are very flexible in terms of swapping waveguides or AFE boards.  So the 3 correct decoding files that we currently have for the R8 cosmic ray test need to be moved to the “Imperial” format and put in CVS. 3M.Ellis - CM23 - Harbin - 15th January 2009

Unpacking DATE data  G4MICE can read the data produced by DATE and extract the payloads that correspond to a given VME device.  Other code in G4MICE can take the blocks of data from the 4 VLSB memory banks and turn them into VlpcHits for reconstruction.  The final step is to add the code to the unpacking library and to the classes that handle DATE data to extract the hits from the DATE files.  This can be tested in advance of the next cosmic ray test as I think Hideyuki took some data with DATE last year. 4M.Ellis - CM23 - Harbin - 15th January 2009

Helix track fit  Aron’s thesis analysis on the KEK test beam data has shown a very strange issue where only a small sub-set of tracks found by the pattern recognition are being successfully fitted by the RecPack package.  To date this has not been seen in the standard Unit Tests, nor in the simulations of MICE Stage 6, and so it is likely some subtle bug that has not been covered by our tests.  Need to understand the cause and fix this urgently. 5M.Ellis - CM23 - Harbin - 15th January 2009