ARIES Meeting, UCSD L. M. Waganer, 14-15 June 2006 Maintenance and Building Conceptual Approach L. M. Waganer The Boeing Company ARIES Meeting University.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

TORE SUPRA Association EURATOM-CEA 1 TORE SUPRA Association EURATOM-CEA Julien WAGREZ EFDA GOTP - ITER PPE WP2 1 juin 2009 EFDA ITER - Goal Oriented Training.
April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California,
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 How to Achieve High Reliability, Availability, and Maintainability L. Waganer June 2007.
Coolant Connections to the DCLL Blanket S. Malang, Dara Navaei, Xueren Wang ARIES Project MeetingARIES Project MeetingUCSD January 23-24, 2012January 23-24,
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
January 8-10, 2003/ARR 1 Plan for Engineering Study of ARIES-CS Presented by A. R. Raffray University of California, San Diego ARIES Meeting UCSD San.
April 27-28, 2006/ARR 1 Finalizing ARIES-CS Power Core Engineering Presented by A. René Raffray University of California, San Diego ARIES Meeting UW, Madison.
June 14-15, 2005/ARR 1 Status of ARIES-CS Power Core Engineering A. René Raffray University of California, San Diego ARIES Meeting UW June 14-15, 2005.
September 3-4, 2003/ARR 1 Initial Assessment of Maintenance Scheme for 2- Field Period Configuration A. R. Raffray X. Wang University of California, San.
Status of the Modular and Field- Period Replacement Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and L. El-Guebaly ARIES Meeting.
ARIES-CS Page 1 Summary of ARIES Power Core Unit Costs L. Waganer The Boeing Company 16 September 2004 ARIES Meeting at Madison, WI.
June 14-15, 2007/ARR 1 Trade-Off Studies and Engineering Input to System Code Presented by A. René Raffray University of California, San Diego With contribution.
ARIES-CS Page 1 Low Cost Fabrication Approach for ARIES-CS Coil Structure L. Waganer The Boeing Company November 2005 ARIES Meeting at UCSD, San.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
ARIES-AT Study L. M. Waganer 3 May 2000 Status of Vacuum Vessel Design L. Waganer 3 May 2000 ARIES Conference Call.
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Summary of Low Cost Fabrication of Integrated Coil Structure L. M. Waganer With Support from Kevin Slattery.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
March 3-4, 2008/ARR 1 Power Management Technical Working Group: TRL for Heat and Particle Flux Handling A. René Raffray University of California, San Diego.
ARIES-CS Study Page 1 Discussion Of Compact Stellarator Reactor Requirements L. Waganer The Boeing Company 8-10 January 2003 ARIES Meeting at UCSD.
November 4-5, 2004/ARR 1 ARIES-CS Power Core Options for Phase II and Focus of Engineering Effort A. René Raffray University of California, San Diego ARIES.
April 27-28, 2006/ARR 1 Support and Possible In-Situ Alignment of ARIES-CS Divertor Target Plates Presented by A. René Raffray University of California,
ARIES-Compact Stellarator Study 1 CS Power Core Materials and Fabrication Unit Cost Estimation ARIES-CS Project Meeting June 2004 University of Wisconsin,
February 24-25, 2005/ARR 1 ARIES-CS Power Core Engineering: Status and Next Steps A. René Raffray University of California, San Diego ARIES Meeting GA.
Maintenance Schemes For ARIES-CS X.R. Wang a S. Malang b A.R. Raffray a and the ARIES Team a University of California, San Diego, 9500 Gilman Drive, La.
ARIES Studies L.M. Waganer 18 Sept 00/Page 1 Power Core Maintenance Approach and Maintainability Analysis By L. M. Waganer The Boeing Company For the ARIES.
Comparison of 2-FP and 3-FP CS Coil Geometry Configurations Contributors: T.K. Mau, Rene Raffray and The ARIES Team ARIES Meeting General Atomics, San.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
December 3-4, 2003/ARR 1 Maintenance Studies for 3-Field Period and 2-Field Period Configurations Presented by A. R. Raffray Major Contributors: X. Wang.
ARIES Meeting, UCSD L. M. Waganer, June 2006 An Approach for Low Cost Fabrication of the Coil Structure L. M. Waganer With Support from Kevin Slattery.
Page 1 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Restructuring System Cost Accounts and Algorithms L. Waganer 3-4 March 2008 ARIES Project Meeting.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 Groundrules, Bases, and Definitions to Scope “The Next Step” L. Waganer The Boeing Company.
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
Status of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray ARIES Meeting PPPL, NJ Sept.
ARIES-CS Page 1 Summary of ARIES Power Core Unit Costs L. Waganer The Boeing Company 4-5 September 2004 ARIES Meeting at UCSD.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
ARIES-IFE Study L. M. Waganer, June 7, 2000 Page 1 Considerations of HI Beam and Vacuum System Arrangement L. Waganer The Boeing Company 7 June 2001 ARIES.
Maintenance Schemes for a DEMO Power Plant and related DCLL Designs Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
ARIES -AT Study L.M. Waganer ARIES 3/20-21/00 Page1 ARIES-AT Vacuum Vessel Design Approach L. M. Waganer The Boeing Company 20 March 2000 UCSD San Diego,
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
HAPL Concrete Shielding Requirements Mohamed Sawan UW Fusion Technology Inst. HAPL Project Meeting UW-Madison October 22-23, 2008.
ARIES Study L. M. Waganer, 9 August Power Cycle Modeling and Cost Validation L. M. Waganer The Boeing Company 7 October 1999 E-meeting.
ARIES- ACT, 21-22May 2013, Germantown, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting May 2013 Hampton Inn,
ARIES- Pathways, October 25-26, 2010 Bethesda, MD Page 1 L. Waganer Consultant for The Boeing Company ARIES-Pathways Project Meeting October 2010.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Page 1 HFP Workshop, RAMI Session, 2-4 Mar 2009k,UCLA Why Is Reliability, Availability, Maintainability, and Inspectability Important to the Future of.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
ITPA12 Diagnostics - PPPL - 3/26-30/07 1 US ITER Project Plans David Johnson Diagnostics Team Leader March 26, 2007 ITPA12 Design Basis US Scope Port Plugs.
ARIES- ACT, Sept, 2012, Bethesda, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting September 2012 Bethesda,
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintainability and Availability Analyses L. M. Waganer The Boeing Company ARIES Meeting University.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
Neutrino Factory Target Vessel Concept Update V. Graves Target Studies EVO June 12, 2012.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
Updates of the ARIES-CS Power Core Configuration and Maintenance
Description of Thin Liquid Wall Protection w/Porous Walls
University of California, San Diego
Trade-Off Studies and Engineering Input to System Code
Preliminary Studies of Plasma-Channel-Based Reactor Beam Transport Section P. LaMarche T. Brown P. Heitzenroeder Aries Project Meeting, UCSD, June.
Reactor Building Concept Assessment
Creating a Family Account/Profile
Status of ARIES-CS Power Core Engineering
Experimental equipment Edgar L. Black February 17, 2019
ARIES-CS Power Core Engineering: Status and Next Steps
University of California, San Diego
Presentation transcript:

ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintenance and Building Conceptual Approach L. M. Waganer The Boeing Company ARIES Meeting University of California, San Diego June 2006

ARIES Meeting, UCSD L. M. Waganer, June 2006 Page 2 Coordinated Design Approach The nominal maintenance approach has been selected and the power core design finalized. Next, the building and maintenance approach has to be developed in concert.

ARIES Meeting, UCSD L. M. Waganer, June 2006 Page 3 Power Core General Configuration These graphics represent our current 3-field period, port maintenance approach 19 m

ARIES Meeting, UCSD L. M. Waganer, June 2006 Page 4 Sequence of Port Maintenance Extractor is located inside the Transfer Chamber ready to remove and set aside the bioshield plug and then remove the auxiliary shielding inside the vacuum vessel port

ARIES Meeting, UCSD L. M. Waganer, June 2006 Page 5 Sequence of Port Maintenance The Extractor now moves inside the vacuum port and removes the port shield

ARIES Meeting, UCSD L. M. Waganer, June 2006 Page 6 Sequence of Port Maintenance The Extractor now access the port blanket for extraction and delivery to the transfer airlock

ARIES Meeting, UCSD L. M. Waganer, June 2006 Page 7 Sequence of Port Maintenance The Extractor now access the inner blanket modules for extraction and delivery to the transfer airlock Note that the opening created by the port blanket must be large than is currently shown to accommodate the large inner blanket modules.

ARIES Meeting, UCSD L. M. Waganer, June 2006 Page 8 Plan View of Maintenance Approach Three Transfer Chambers are permanently located outside the ports. The Extractor equipment enters through an access door The Extractor removes the Bioshield Port Plug and sets aside The Extractor then moves inside and removed the port shield, retracts it, rotates and places it in the mobile airlock Mobile Airlock goes to Hot Cell The sequence is repeated until all blanket modules are removed This can happen all ports simultaneously Transfer Chamber Extractor Access Door Mobile Transfer Airlock Power Core

ARIES Meeting, UCSD L. M. Waganer, June 2006 Page 9 Next Actions This level of detail probably suffices to prove feasibility Additional detail will be added to increase the confidence in the selected maintenance scheme and building definition Some consideration should be added for construction approach with Reactor Building Added details for Hot Cell, steam generators and turbines could be provided, if required.