Hubble Space Telescope Goddard Space Flight Center Hubble Ultra-Wide-Field Imager (HUFI) David Leckrone Senior Project Scientist for HST December 16, 2001.

Slides:



Advertisements
Similar presentations
General Astrophysics with TPF-C David Spergel Princeton.
Advertisements

Oct. 18, Review: Telescopes – their primary purpose… Across the full EM spectrum (radio through very high energy gamma- rays) telescopes fundamentally.
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
990901EIS_Opt.1 The Instrument: Optical Design Dr. John T. Mariska Data Coordination Scientist Naval Research Laboratory
National College RomaniaCassiopeiae Team Made by Alexandra Birladeanu and Gina Ioana Ursu.
Optical Astronomy Imaging Chain: Telescopes & CCDs.
HUBBLE SPACE TELESCOPE PROGRAM Sixth European Conference on Space Debris 1 Goddard Space Flight Center mk_overview.ppt Space Shuttle STS- 31 Deployment.
The Hubble Space Telescope (H.S.T.) By Jason Hunyar.
Swift 1 Swift Spacecraft and Instruments. Swift 2 Spacecraft Design 1 of 6 Reaction wheels Gyros Star Trackers.
James Webb Space Telescope and its Instruments George Rieke (MIRI Expert) & Marcia Rieke (NIRCam Expert) Steward Observatory, University of Arizona The.
James Webb Space Telescope and its Instruments John Stansberry Steward Observatory, University of Arizona The First Light in the Universe: Discovering.
Hubble 4-D: The telescope in space and time A conversation with Ed Weiler on the origins of servicing.
The Hubble Telescope Ashley Field. Hubble Facts The Hubble Telescope was launched into low Earth orbit in 1990 Four main instruments observe in the near.
Diffraction Limited Imaging from the Largest Ground-Based Telescopes in the Visible Craig Mackay, Jonathan Crass, David L. King Institute of Astronomy,
WISH upon a first galaxy….. WISH Wide-field Imaging Surveyor for High-Redshift WISH Working Group M31 Phot: R.Gendler.
The Hubble Space Telescope and Next Generation Space Telescope Duncan A. Forbes Centre for Astrophysics & Supercomputing, Swinburne University.
LIVE INTERACTIVE YOUR DESKTOP January 28, 2010 NASA/NSTA Web Seminar Series How Telescopes Have Changed Our View of the Universe Hubble’s Universe:
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
4. Telescopes Light gathering power and resolution Optical and radio telescopes Limitations of Earth’s atmosphere and satellite missions. Instruments (prism.
WISH upon a first galaxy….. WISH Wide-field Imaging Surveyor for High-Redshift WISH Working Group M31 Phot: R.Gendler.
24-Jun-2008K. Sembach 1 What’s Happening During Hubble Servicing Mission 4? Ken Sembach STScI Hubble Project Scientist.
A SEMINAR ON HUBBLE SPACE TELESCOPE PRESENTED BY: HARI OM ELECTRONICS & COMMUNICATION REG NO SECTION-C ROLL NO.– 123.
Fine Guidance Sensor 2010 HST Calibration Work Shop Ed Nelan Barbara McArthur STScI.
Hubble: Back in Business and Better Than Ever Dr. Frank Summers Space Telescope Science Institute September 9, 2009.
27-Apr-2009K. Sembach 1 Servicing Mission 4 - Revisited Ken Sembach STScI Hubble Project Scientist April 27, 2009.
20 Nov Jean-Paul KNEIB - prospective spatial PNG 1 A wide field imager for dark energy … and more ! SNAP-L Jean-Paul KNEIB LAM, Marseille, France.
The Hubble Space Telescope 1National College Iasi.
A Search for Earth-size Planets Borucki – Page 1 Roger Hunter (Ames Research Center) & Kepler Team March 26, 2010.
Science with the new HST after SM4 WFC3 slitless spectroscopy Harald Kuntschner Martin Kümmel, Jeremy R. Walsh (ST-ECF) WFC3-team at STScI and NASA.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
NORDFORSK Summer School, La Palma, June-July 2006 NOT: Telescope and Instrumentation Michal I. Andersen & Heidi Korhonen Astrophysikalisches Institut Potsdam.
DRM1 design description SDT 5/17/12 1. WFIRST DRM candidate design summary At SDT6 2/2-3/2012 consensus for full-up mission, aka “DRM1” was: 1.3m aperture,
Exploring the far reaches of the universe. Hubble Telescope By Blake Shaffer.
Hubble Space Telescope Coronagraphs John Krist JPL.
Weak Lensing from Space with SNAP Alexandre Refregier (IoA) Richard Ellis (Caltech) David Bacon (IoA) Richard Massey (IoA) Gary Bernstein (Michigan) Tim.
WFIRST IFU -- Preliminary “existence proof” Qian Gong & Dave Content GSFC optics branch, Code 551.
STS-125 Hubble Space Telescope(HST) Servicing Mission 4 (SM4) Overview Presented By: Jerry L. Ross October 6, 2009 Prague, Czech Republic 1.
Michael Levi (Lawrence Berkeley National Laboratory), M. Lampton (UCBerkeley Space Sciences Lab), and M. Sholl (UCBerkeley Space Sciences Lab) WFIRST:
Henry Heetderks Space Sciences Laboratory, UCB
The Future of the Hubble Space Telescope Steven Beckwith April 25, 2005 Space Telescope Science Institute.
Wide Field Astronomy from Space Steven Beckwith Space Telescope Science Institute January 9, 2002.
SNAP Calibration Program Steps to Spectrophotometric Calibration The SNAP (Supernova / Acceleration Probe) mission’s primary science.
TIPS - Oct 13, 2005 M. Sirianni Temperature change for ACS CCDs: initial study on scientific performance M. Sirianni, T. Wheeler, C.Cox, M. Mutchler, A.
Solar orbiter_______________________________________________.
WFIRST DRM2 candidate design – payload summary At SDT7 3/1-2/2012 consensus for concepts w/out overlap w/ other mission, aka “DRM2” was: 1.1m aperture,
The Second Generation of IR detectors for WFC3 Massimo Robberto European Space Agency and Space Telescope Science Institute.
The European Hubble Space Telescope Legacy Archive Wolfram Freudling.
SuperNova / Acceleration Probe System Engineering Mike Roberto and Mike Amato November 16, 2001.
Hubble Space Telescope By Brittany Bellows Physics 1040 – Spring 2011.
Astronomical Observational Techniques and Instrumentation
Astronomy 1010 Planetary Astronomy Fall_2015 Day-23.
SuperNova / Acceleration Probe Thermal System Wes Ousley November 16, 2001.
Introduction NICMOS (Near-Infrared Camera and Multi-Object Spectroscopy) was installed on the Hubble Space Telescope during SM2 in 1997 and has been the.
ISWG - December 7, Destiny, The Dark Energy Space Telescope.
Hubble clarity Groundbased… Hubble… Outline Dissecting nearby galaxies Studying galaxies when they were young What makes sense, and what doesn’t?
1 WFC3 – Critical Science Review Science Driven CEIs Requirements.
May 22, 2003WFC3 Report at the June 03 TIPS1 Optical alignment and image quality testing at GSFC Test lead: Bill Eichorn, GSFC Test conductors: George.
Hubble Update for “Teacher’s Thursday” on 10 April 2003 Max Mutchler Space Telescope Science Institute.
The Hubble Space Telescope (H.S.T.)
Increased Thermal Background for the post-NCS NICMOS TIPS – June 19, 2003 Megan Sosey NICMOS.
HST Cal Conf -- Oct 27, Calibration Status and Results for Wide Field Camera 3 – R. Kimble/GSFC, Calibration Status and Results.
Astronomical Spectroscopic Techniques. Contents 1.Optics (1): Stops, Pupils, Field Optics and Cameras 2.Basic Electromagnetics –Math –Maxwell's equations.
Incorporating Hubble Servicing with NASA’s Long-Term Vision
Astronomical Spectroscopic Techniques
Telescopes.
C.Baltay and S. Perlmutter December 15, 2014
XRT Performance Update
Astronomical Observational Techniques and Instrumentation
Observational Astronomy
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

Hubble Space Telescope Goddard Space Flight Center Hubble Ultra-Wide-Field Imager (HUFI) David Leckrone Senior Project Scientist for HST December 16, 2001

Hubble Space Telescope Goddard Space Flight Center 11/28/012

Hubble Space Telescope Goddard Space Flight Center 11/28/013

Hubble Space Telescope Goddard Space Flight Center 11/28/014 (69 arcmin 2 ) HUFI (90 arcmin 2 ) (5.7 arcmin 2 ) (11.3 arcmin 2 )

Hubble Space Telescope Goddard Space Flight Center 11/28/015 Field of View 4K x 4K CCD’s (3)

Hubble Space Telescope Goddard Space Flight Center 11/28/016 Optical Schematic M1 Mirror M3 Mirror M2 Mirror Radial “Pickle” Pick Off Mirror (POM) HST OTA CCD FPA Filters, CCD Shutter Location Pupil

Hubble Space Telescope Goddard Space Flight Center 11/28/017 Geometric ray trace compared to two-pixel and four-pixel width scale-bars shows a well-corrected design.

Hubble Space Telescope Goddard Space Flight Center 11/28/018 Optical Performance Diffraction PSF encircled =632.8 nm for center field and 4 other field positions show that PSF is diffraction-limited and is uniform over full FOV

Hubble Space Telescope Goddard Space Flight Center 11/28/019

Hubble Space Telescope Goddard Space Flight Center 11/28/0110 Instrument Layout Pick Off Mirror M3 M1 Corrector Mechanism Filter Mechanism Shutter Mechanism CCD Heat Pipes M1 Calibration Door Mechanism

Hubble Space Telescope Goddard Space Flight Center 11/28/0111 Instrument Layout CPL Saddle To AS Radiator Optical Bench Radiator Point C (Point B Opposite Side) Strut FGS Enclosure Side

Hubble Space Telescope Goddard Space Flight Center 11/28/0112 Instrument Layout M2 M2 Support FGS Enclosure

Hubble Space Telescope Goddard Space Flight Center 11/28/0113 +V2 SIDE OF HST FGS3 BAY NCS RADIATOR

Hubble Space Telescope Goddard Space Flight Center 11/28/0114 HUFI Design Features All-Reflective Design –Four surfaces – one flat, three powered Well-Corrected Aberrations –Wavefront error to waves rms at 632.8nm Flat Focal Surface –Requires three 4Kx4K CCD’s similar to ACS and WFC3 detectors Cooling Via HUFI External Radiator Plus Coupling To NCS Radiator Replaces FGS #3 Without Compromising Current Pointing Performance Does Not Interfere With Other Instruments –Amenable to parallel observing –Follow-up observations with WFC3, COS, ACS, STIS

Hubble Space Telescope Goddard Space Flight Center 11/28/0115 HUFI Scientific Performance FOV – 90 arcmin 2 (8xACS, 16xWFPC2) Pixel Scale – 0.10 arcsec (same as WFPC2) Sensitivity – Comparable to ACS in I-band, 5x WFPC2 in I-band Discovery Efficiency – 8xACS, 80xWFPC2 SNe Ia Discovery Rate - ~1 per day with follow-up

Hubble Space Telescope Goddard Space Flight Center 11/28/0116 POTENTIAL OBSERVING STRATEGY 3-6 Month campaigns dedicated to high galactic latitude fields Deep exposures with WFC3, COS, ACS broken into multiple visits – HUFI parallel exposures for “free” SN detected in HUFI fields followed with other HST instruments –STIS spectra for redshifts and classifications up to z=1.2 –WFC3 near-IR images and grism spectroscopy up to 1.7 microns –ACS higher resolution images for host galaxy morphology

200 SNe la +   M = 10% 200 SNe la

200 SNe la + MAP +  Ho = 10% 200 SNe la

Hubble Space Telescope Goddard Space Flight Center 11/28/0119 Wild Field Planetary Camera 2 COSTAR Gyros Solar Arrays Launch! Imaging Spectrograph Near Infrared Camera Fine Guidance Sensor Gyros Advanced Computer Fine Guidance Sensor Advanced Camera Solar Arrays Power Control Unit NICMOS Cooling System Wide Field Camera 3 Fine Guidance Sensor Aft Shroud Cooling System Batteries Gyros SM1 SM2 SM3A SM3B SM4 End of Mission ? HUBBLE MISSIONS

Hubble Space Telescope Goddard Space Flight Center 11/28/0120 RETIREMENT OPTIONS FOR HST One Shuttle flight allocated to HST after Servicing Mission 4 in 2004 Current baseline plan is to return HST to the ground in 2010 –Exhibit in National Air & Space Museum –Requires partial disassembly and disposal of multiple pieces in orbit (e.g. solar arrays, external radiators, possibly instruments) –5 EVA mission –Requires HST to be stable and commandable –Less than 50/50 chance that HST will function to 2010 Alternative option –“Light” servicing mission in 2007 instead of 2010 –Maximizes probability of zero downtime between HST and NGST –Attach propulsion module to HST for end-of-mission controlled re- entry –Provides possible opportunity for new instrument, e.g. HUFI

Hubble Space Telescope Goddard Space Flight Center 11/28/ Elapsed Time - Years Probability Probability of HST Science Operations vs. Time Since Last Servicing Mission 9/10/01 HST Reliability Indicator from the Refined Aerospace Corporation Model

Hubble Space Telescope Goddard Space Flight Center 11/28/0122 SUMMARY We’ve identified an instrument design which provides a major increase in FOV compared to prior HST cameras A systematic campaign should yield ~1 SNe per day with follow up provided by full suite of HST instruments Flight opportunity requires change in current baseline retirement plan for HST and willingness of Code S to support a new HST instrument

Hubble Space Telescope Goddard Space Flight Center 11/28/0123 Thermal Block Diagram NCS Radiator Existing Inserts 40 watts to AS 120 watts to NCS Radiator using HP/VCHP to carry heat from CEB and CCDs 90 watts electronics to modified “door radiator” using HPs HUFI Radial SI “New” Radiator/ Door

Hubble Space Telescope Goddard Space Flight Center 11/28/0124 Power Flow NCS Radiator Diode Box Auxilary Power Ports 60 watts From HST 190 watts from NCS Radiator auxiliary power supply HUFI Radial SI Total estimated power requirement of 250 W