Project X: News & Strategy Steve Holmes Project X Working Group Meeting November 19, 2009.

Slides:



Advertisements
Similar presentations
1 Project X Proton Driver David Neuffer September 2011.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Project X: Project Status & Progress Steve Holmes Project X Working Group Meeting March 2, 2011.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Project X Update Steve Holmes SPAFOA Meeting November 13, 2012
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
Project X: Project Status Steve Holmes Project X Working Group Meeting December 15, 2011.
Project X: A multi-MW Proton Source at Fermilab Steve Holmes Extreme Beam Lecture Series June 11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
F Project X Overview Dave McGinnis October 12, 2007.
Project X: A Multi-MW Proton Source at Fermilab Manfred Wendt & Steve Holmes SPL/ESS Collaboration Meeting Lund June 30, 2010.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
An Integrated Intensity Frontier Strategy Steve Holmes & Bob Tschirhart LBNE Reconfiguration Workshop April 25, 2012.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
AAC Closeout Report Fermilab Accelerator Advisory Committee Meeting July 28-30, 2010.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Overview of the Project X RD&D Plan Sergei Nagaitsev AAC Meeting February 3, 2009.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beamline Development John Hill NSLS-II Experimental Facilities Division Director PAC Meeting November 20, 2007.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Project X Working Group Meeting January 15, :00 PM Snake Pit.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Project X Collaboration Plan Steve Holmes Accelerator Advisory Committee Meeting May 6-8, 2008.
Project X RD&D Plan 325 MHz Linac including High Intensity Neutrino Source (HINS) Program Bob Webber AAC Meeting February 3, 2009.
Project X Update Steve Holmes Accelerator Advisory Committee Meeting November 7, 2011.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Project X goals and organization Sergei Nagaitsev October 4, 2011.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
MCS meeting 20/11/2015 S. Guiducci. Introduction Yesterday meeting has shown an interest in a large physics community to incremental development of muon.
The Fermilab Roadmap, Project X, and Muon Facilities Steve Holmes NFMCC Meeting March 17, 2008.
Linac Design: Single-Spoke Cavities.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Project X as a Muon Facility Platform Keith Gollwitzer Fermilab Accelerator Advisory Committee November 7-9, 2011.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
Project X: Introduction, Strategy, and Collaboration Meeting Goals Steve Holmes Project X Collaboration Meeting September 11, 2009.
Project X/ILC/SRF Integrated Plan Steve Holmes Fermilab DOE Annual Science & Technology Review July 12-14, 2010.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
Head, Office of Project Management Oversight (OPMO)
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Implementing the Transportation/Land Use Connection Program
The DBD: Outline and Scope
Superbeams with SPL at CERN
Introduction to Jefferson Lab
ILC Cryogenics -- Technical Design Report Planning
MEIC Cost Estimate Overview
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Project X: News & Strategy Steve Holmes Project X Working Group Meeting November 19, 2009

Outline DOE Briefing AAC Meeting Strategy –FY2010 Plan –CD-0/Director’s Review 2PX Working Group Meeting, 11/19/09 – S. Holmes

DOE Briefing October 29 in Germantown –Fermilab: SH, EMcC, JK, SN, Phone: PO, Y2K –DOE: Dennis K, Dan L, Mike P, Bruce S, Ted L, Kurt F, Pepin C Presentations –IC-2 technical description – Sergei –IC-2 and IC-1 estimates – Jim –CD-0 strategy – Steve Reactions –Good appreciation of what we described –Dennis asked what an initial phase that only included the CW linac would save off the initial cost? Answer: saves $0.5B –Discussed strategies for broadening the customer base, beyond HEP and NP –Discussed how to get the mission need of Phase 1 validated  Probably requires going back to HEPAP/P5 –Informed us that FY12 is earliest PED funding, FY15 is earliest construction start PX Working Group Meeting, 11/19/09 – S. HolmesPage 3

AAC Meeting ICD-2 Primary messages Believe IC-2, with a CW linac operating in the range GeV, will meet the requirements outlined for the rare processes program. –Need a more detailed performance specification for the CW linac and splitting facility from the physics people. Either IC-1 or IC-2 will meet the needs of LBNE IC-2 does not have an associated R&D plan nor is it aligned with the SRF and HINS programs. IC-2 is dependent upon a beyond-state-of-the art beam chopper. –Recommend a pursuit of a two stage chopping scheme –Recommend utilization of the HINS facility for chopper development There is no complete concept for marrying a pulsed linac to a CW front end. The IC-2 linac has not been optimized relative to: types and numbers of cavities, frequencies, transition points, cavity gradients, operating temperature, cryogenic segmentation. RCS is feasible but challenging –Injection into the RCS is primary technical challenge, but also e-cloud, instabilities, etc. Utilization of Project X as the front end of a muon facility is best aligned with IC-1 and second best aligned with IC-2 with a pulsed linac substituting for the RCS. –The RCS is not particularly useful in a muon facility Suggestions/Recommendations Get a more detailed performance specification from the physics group. Complete testing of CM1 asap Look at a SC RFQ Optimize the entire linac system with regard to frequencies, beta transition points, gradients, and operating temperature. Need to look at HOM requirements and impacts through entire linac Update the RD&D plan for IC-2, including integration with other programs PX Working Group Meeting, 11/19/09 – S. HolmesPage 4

AAC Meeting HINS Primary messages Integrate directly within Project X and align with Project X needs –Better aligned with IC-1 than IC-2 –HINS will not be the IC-2 front end. Primary value to IC-2: –Chopper development –Diagnostics development –Both strongly supported by the committee –As a test facility, may be of interest to broader community Question the need for continued development on: –Solenoidal focusing –FVMs –Pulsed SSRs Continue SSR development but morph into CW. Suggestions Develop HINS as a test facility aligned with specific PX development issues. Primary focus should be on chopper and instrumentation development. –Need to go beyond 2.5 MeV, but only as far as rf capture –Need to tailor instrumentation to facilitate this new mission Evaluate the impact of Q degradation from fringe fields. Suggest two stage chopping PX Working Group Meeting, 11/19/09 – S. HolmesPage 5

CD-0 Strategy (DOE Briefing) Strategy –Complete ICD-2 and associated estimate: mid-October –Project X Physics Workshop: November 9-10  White paper –PAC discussion of physics: November –AAC technical evaluation of IC-2: November –Director's Review of cost estimate range: Jan/Feb 2010  Validate IC-2 estimate  Validate a cost range  DOE observers –OHEP/OPA briefing on cost range: February 2010 –Submit Mission Need (CD-0) document: winter/spring Are recommendations from IC-1 review still applicable PX Working Group Meeting, 11/19/09 – S. HolmesPage 6

Cost Range Strategy (DOE Briefing) Cost Range Strategy –Goal is to understand how to work downward from $1.5B: –Cost reductions, that do not change performance goals  Review assumptions on fabrication costs/learning curves of big ticket items  Assess possible reductions from the RD&D program  Value engineering, e.g., –Cavity Q, operating temp., rf power options, etc.  Examine strategies on overheads, both at Fermilab and the participating laboratories  Secure space bank offsets  Identify international in-kind contributions PX Working Group Meeting, 11/19/09 – S. HolmesPage 7

Cost Range Strategy (DOE Briefing) Cost Range Strategy –Cost (scope) reductions, that do change performance goals  Other operating scenarios, e.g., –0.5 mA cw (JLab upgrade configuration: IC-2)  Mix and match IC-1 and IC-2 –CW front end with pulsed linac into Recycler/MI –Pulsed linac front end with RCS into Recycler  Direct injection into the Main Injector (IC-1)  Lower Main Injector injection energy (IC-1) –Caveats (Director’s Review):  Escalation, schedule, and scope all hold PX Working Group Meeting, 11/19/09 – S. HolmesPage 8

Next Steps PX Working Group Meeting, 11/19/09 – S. HolmesPage 9 Develop an estimate for a 3 GeV CW linac operating at MW –Identify (cost) break points (with respect to beam power) on the rf system and cryogenics distribution system –Complete optimization study on the linac configuration: cavity types, cavity frequencies, and transition points Retain RCS within the estimate but limit work to the critical technical issue(s) –Injection Archive ICD-1 and associated cost estimate –Shelve Director’s Review recommendations that are not applicable to IC-2 Proposed strategy for CD-0 –Attempt to get cost of 3 GeV linac at or below $1.0 B –Carry along RCS to support an upper end of the cost range that would enable 2 MW to LBNE

Working Timeline FY2009 –Complete Initial Configuration Documents (ICD-1 and ICD- 2) and preliminary cost estimates –Develop Upgrade Concepts for 2-4 MW at 8 GeV –Form RD&D Collaboration –Establish Project Management team –Revise RD&D plan and initiate work FY2010 –CD-0 –Initiate work on Conceptual Design Report –Request PED funds for FY2012 –Develop NEPA strategy –Initiate permitting documentation –Draft of all CD-1 documentation Page 10PX Working Group Meeting, 11/19/09 – S. Holmes

Working Timeline FY2011 –CD-1 FY2013 –CD-2/3a FY2014 –CD-3: Initiate Construction ~FY2015~2018 –Construct Page 11PX Working Group Meeting, 11/19/09 – S. Holmes