1 Transportation Operations Group Utility Installation Review (UIR) System Internet-Based Utility Permit Implementation
2 Transportation Operations Group Why is It Important? Large number of utilities within the ROW Thousands of utility permits per year Hundreds of utility agreements per year Institutional memory at TxDOT Quality of information provided by utilities TTI Research Project Prototype GIS-based utility inventory model Prototype Internet-based utility permitting system
3 Transportation Operations Group Workflow Diagram - Overview Submitting Reviewing Approval/Pre-construction Construction Post-construction Notice of Proposed Installation Approval 48-hr Notification Traffic Control Plan As-Built Certification
4 Transportation Operations Group Workflow Diagram (Part 1) Submitting Reviewing Approval
5 Transportation Operations Group Workflow Diagram (Part 2) Pre-construction Construction Post-construction
6 Transportation Operations Group User System Requirements Desktop/Laptop with Pentium Processor or higher Internet Explorer 6.0 Adobe Acrobat Reader 6.0 Internet connection account UIR active account
7 Transportation Operations Group Additional Information (demo) Cesar Quiroga – TTI (RS): Jesse Cooper – ROW (PD): John Campbell – ROW (PC): Online help system User manual Training materials
8 Transportation Operations Group Project Status Pilot implementation in San Antonio Four utility companies Water utility Electric utility Major telecom Cable TV company All utility permits within Bexar County Lessons learned for statewide implementation
9 Transportation Operations Group Implementation Issues Utility company acceptability Detailed utility installation coordinates Buy-in from administration Concern about Internet-based procedures Proprietary information security DOT concerns System scalability Ability to capture district-level procedures
10 Transportation Operations Group Project Status (as of 09/24/08) Online Future
11 Transportation Operations Group Project Status (as of 09/24/08) DistrictStartedTotalActive San Antonio09/054,9451,777 Pharr06/063,650 1,372 Bryan05/ Fort Worth06/07 1, Houston09/ Total 11,104 4,798
12 Transportation Operations Group Major System Functionality Database-driven Interactive GIS-based permit location Permit event and document tracking PDF file conversion Utility company/DOT user management Tabular and map-based reports Performance measures
13 Transportation Operations Group
14 Transportation Operations Group
15 Transportation Operations Group Benefits Automation More thorough, faster reviews Reporting and accountability Institutional memory Document retention practices
16 Transportation Operations Group Challenges Garbage in / garbage out … Automation does not “automatically” result in better, more reliable deliverables DOT and utility company training Utility company compliance Utility Accommodation Rules Notification to DOT prior to construction