Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.

Slides:



Advertisements
Similar presentations
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
Advertisements

Some cryostat scintillator slides for Monday’s meeting Michigan State University.
Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.
Introduction This project used cosmic rays to test a prototype Minimum Bias Trigger Scintillator (MBTS) that will be used in the ATLAS experiment at CERN.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
Minimum Bias Trigger Scintillators (MBTS) a project of: CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Run 2 Upgrade of the ATLAS Minimum Bias Trigger Scintillators Rachel Hyneman, College of William & Mary Advisor: Antonio Sidoti, Instituto Nazionale di.
Commissioning TileCal with Cosmic Ray Muons J. Pilcher University of Chicago.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
Early Commissioning of ATLAS First North American ATLAS Physics Workshop Tucson J. Pilcher University of Chicago.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Algorithms for the ROD DSP of the ATLAS Hadronic Tile Calorimeter
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
Adders in drawer Test of TileCal Level 1 Interface drawer patch panel trigger cable ca 70 m receiver pre-processor TileCal patch panel RP patch panel TileCal.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
ATLAS Tile Hadronic Calorimeter:
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
L1Calo Installation Status Murrough Landon, QMUL Level-1 Calorimeter Trigger (University of Birmingham, University of Heidelberg, University of Mainz,
MobiDAQ progress Paulo Vitor da Silva, Gerolf Schlager.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
CDMS II Shielding To Installation To Construction From Design.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Within ATLAS both TILECal and LAr are planning upgrades to the readout systems - current systems will reach limits on radiation exposure aging of components.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Sergio Vergara Limon, Guy Fest, September Electronics for High Energy Physics Experiments.
Minimum Bias Trigger Scintillators
Mini-drawers, FE-ASIC , Integrator
Setup for Cosmic Ray Test of VPA panel, using MiniDAQ
Maki KUROSAWA VTX Group 2014 Feb 20
RPC Front End Electronics
Digitally subtracted pulse between
BUCKEYE has internal shift register which controls calibration
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber assemblies for 1/8 of cryostat scintillators

MBTS trigger The goal of the trigger is to be able to define 1(2) filled bunches in conjunction with activity from the collision point ATLAS Tilecal trigger cables will run from extended barrel up to rack where signals will be distributed through patch panels  understanding is that gap scintillators will be separated out through own connector  Q: what is meant by gap scintillators? Sometimes cryo scintillators are termed gap. Will find out.  MBTS counters will be plugged into PMT#1 (E#) which uses the muon trigger output; this may be bundled with other Tilecal trigger signals and will require intervention to separate out

NB We will have to remove a cryostat scintillator for each MBTS counter in order to route the MBTS pigtail to the optical fiber assemblies Can re-install only between runs

Higain counts events 50 mV trigger threshold 4.6mV/pC at end of trigger cable X5 gain in coincidence board before descriminator 12.5pC = 1024 counts (higain) => 50mV threshold = 178 counts on higain output 50mV threshold Tests performed at Chicago test-bench with counter good separation between signal and noise offline; 30-40% efficiency per counter for mip at trigger level; trigger electronics not designed for this kind of signal See however next slide

Muon trigger outputs One of the PMT channels on each module has been modified to have a higher gain (X30) for the L1 trigger output The pigtails are long enough that inner and outer segments can be plugged into the modified channels on two adjacent Tilecal modules This will boost signal and will boost S/N by an unknown amount (how much of noise is upstream of additional gain?)  tests suggest 75% efficiency with 90% noise rejection Noise problems currently with finger supplies; would like to check once situation is stable again with new trigger cables

Trigger signals What to do with trigger signals once they leave patch panel? Is there a reason not to use the Chicago stand-alone boards?  I think Nick had an objection but I can’t remember what it was Otherwise, we discussed using a VME crate (either separate or sharing space with another system) and commercial logic boards that allow different combinations to be formed  A and C, A or C, etc  If need be I can look for money for buying components Output signal then goes to CTP

Issues From Nick’s to Ana  can test trigger outputs of EBC drawers in ~1 month  will get an idea of signal to noise using muon trigger outputs Sometime later (how much later?) can use temporary trigger cables to send signals up to USA15 Better to wait until final EBC extended barrel trigger cables are installed? How to test counters in place? Can we bring a source down to the cavern? How to measure radiation damage/aging? Keep track of average pulse heights from counters?