©2006 BAE Systems. COSYSMO Application At BAE Systems Gan Wang COSYSMO Workshop 23 rd International Forum on COCOMO and Systems/Software Cost Modeling.

Slides:



Advertisements
Similar presentations
Value-at-Risk: A Risk Estimating Tool for Management
Advertisements

The Right Answer When You Need Peace of Mind. Lone Star was Founded in 2004 in Dallas, Texas Clients Include Dept. of Defense, NASA, AT&T and Hewlett.
Desktop Business Analytics -- Decision Intelligence l Time Series Forecasting l Risk Analysis l Optimization.
On Representing Uncertainty In Some COCOMO Model Family Parameters October 27, 2004 John Gaffney Fellow, Software & Systems.
February Offerred by: C.E. Brockway Brockway Engineering Jim Brannon Leonard Rice Engineers, Inc John Koreny HDR Inc Willem Schreuder Principia.
Asset Optimization & Decision Support Services. 1 Overview of Service Program Proprietary service platform that marries 30+ years of Engineering & Subject.
Multi-Area Stochastic Unit Commitment for High Wind Penetration in a Transmission Constrained Network Shmuel Oren University of California, Berkeley Joint.
Tools Dr. Saeed Shiry Amirkabir University of Technology Computer Engineering & Information Technology Department.
COCOMO Suite Model Unification Tool Ray Madachy 23rd International Forum on COCOMO and Systems/Software Cost Modeling October 27, 2008.
COSYSMO 2.0 Workshop Summary (held Monday, March 17 th 2008) USC CSSE Annual Research Review March 18, 2008 Jared Fortune.
Cocomo II Constructive Cost Model [Boehm] Sybren Deelstra.
University of Southern California Center for Systems and Software Engineering ©USC-CSSE1 Ray Madachy, Ricardo Valerdi USC Center for Systems and Software.
© The Aerospace Corporation 2010 An Application of COCOMO and COSYSMO in Acquisition Research Dr. Peter Hantos and Nancy Kern The Aerospace Corporation.
11/08/06Copyright 2006, RCI1 CONIPMO Workshop Out-brief 21 st International Forum on COCOMO and Software Cost Modeling Donald J. Reifer Reifer Consultants,
Integration of Software Cost Estimates Across COCOMO, SEER- SEM, and PRICE-S models Tom Harwick, Engineering Specialist Northrop Grumman Corporation Integrated.
Some Experience With COSYSMOR At Lockheed Martin
Applying COCOMO II Effort Multipliers to Simulation Models 16th International Forum on COCOMO and Software Cost Modeling Jongmoon Baik and Nancy Eickelmann.
1 COSYSMO 3.0: Future Research Directions Jared Fortune University of Southern California 2009 COCOMO Forum Massachusetts Institute of Technology.
University of Southern California Center for Software Engineering CSE USC ©USC-CSE 10/23/01 1 COSYSMO Portion The COCOMO II Suite of Software Cost Estimation.
COSYSMO Reuse Extension 22 nd International Forum on COCOMO and Systems/Software Cost Modeling November 2, 2007 Ricardo ValerdiGan Wang Garry RoedlerJohn.
Affiliate Feedback and Discussion 1. Future Research: COSYSMO Updated data collection effort Quantifying the effect of schedule Harmonizing across software.
1 Systems Engineering Reuse Principles Jared Fortune, USC Ricardo Valerdi, MIT COSYSMO COCOMO Forum 2010 Los Angeles, CA.
1 Results of Reuse Survey Jared Fortune, USC Ricardo Valerdi, MIT Gan Wang, BAE COSYSMO COCOMO Forum 2008 Los Angeles, CA.
COSYSMO Reuse Extension 22 nd International Forum on COCOMO and Systems/Software Cost Modeling November 2, 2007 Ricardo ValerdiGan Wang Garry RoedlerJohn.
©2006 BAE Systems. A Proposed Systems Engineering Productivity Measure Gan Wang and John Deal 24 th International Forum on COCOMO and Systems/Software.
System-of-Systems Cost Modeling: COSOSIMO July 2005 Workshop Results Jo Ann Lane University of Southern California Center for Software Engineering.
COSYSMO Risk/Confidence Estimation Prototype John Gaffney March 14, 2005.
1 Discussion on Reuse Framework Jared Fortune, USC Ricardo Valerdi, MIT COSYSMO COCOMO Forum 2008 Los Angeles, CA.
Systems Engineering Reuse: A Report on the State of the Practice Jared Fortune, USC Ricardo Valerdi, MIT Gan Wang, BAE Systems COCOMO Forum 2008 Los Angeles,
1 COSYSMO 2.0: A Cost Model and Framework for Systems Engineering Reuse Jared Fortune University of Southern California Ricardo Valerdi Massachusetts Institute.
UNCLASSIFIED Schopenhauer's Proof For Software: Pessimistic Bias In the NOSTROMO Tool (U) Dan Strickland Dynetics Program Software Support
©2006 BAE Systems. Practical Implementation of COSYSMO Reuse Extension Gan Wang, Aaron Ankrum, Cort Millar, Alex Shernoff, Ricardo Valerdi.
Analysis Categories Base-case analysis What-if (sensitivity) analysis Breakeven Analysis Optimization Analysis Risk Analysis.
© 2002 Hulett & Associates, LLC Will YOUR Project Overrun? Do a Cost Risk Analysis Presented by David T. Hulett, Ph.D. Hulett & Associates, LLC Los Angeles,
Technical Integrity Assurance For Product Development W. Henson Graves Lockheed Martin Aeronautics Company Russ Campbell.
Cost Management Week 6-7 Learning Objectives
Monte Carlo Simulation 1.  Simulations where random values are used but the explicit passage of time is not modeled Static simulation  Introduction.
Lecture 11 Implementation Issues – Part 2. Monte Carlo Simulation An alternative approach to valuing embedded options is simulation Underlying model “simulates”
Dr. István Fekete: The Role of Integrated Risk Management in Organizations April11th, Budapest.
© Mahindra Satyam 2009 Project Metrics QMS Training.
PMT 257_Day 4_Risk Management
CRESCENDO Full virtuality in design and product development within the extended enterprise Naples, 28 Nov
Presentation Ling Zhang Date: Framework of the method 1 Using Distribution Fitting for Assumptions 2 monte – carlo simulation 3 compare different.
SIMULATION USING CRYSTAL BALL. WHAT CRYSTAL BALL DOES? Crystal ball extends the forecasting capabilities of spreadsheet model and provide the information.
Gan Wang BAE Systems Ricardo Valerdi University of Arizona Garry J. Roedler Lockheed Martin Mauricio Pena Boeing Systems Engineering Reuse Delphi – Workshop.
Software Project Management With Usage of Metrics Candaş BOZKURT - Tekin MENTEŞ Delta Aerospace May 21, 2004.
University of Southern California Center for Systems and Software Engineering COSATMO/COSYSMO Workshop Jim Alstad, USC-CSSE Gan Wang, BAE Systems Garry.
9/17/2002 COSYSMO Usage Experience Panel: What is Happening at Lockheed Martin Garry Roedler, Lockheed Martin Engineering Process Improvement Center
AMERICA’S ARMY: THE STRENGTH OF THE NATION Mort Anvari 1 Cost Risk and Uncertainty Analysis MORS Special Meeting | September.
Hybrid Simulation with Qualitative and Quantitative Integrated Model under Uncertainty Business Environment Masanori Akiyoshi (Osaka University) Masaki.
Gan Wang 22 October th International Forum on COCOMO® and Systems/Software Cost Modeling in conjunction with the Practical Software and Systems.
SCEC Workshop on Earthquake Ground Motion Simulation and Validation Development of an Integrated Ground Motion Simulation Validation Program.
University of Southern California Center for Systems and Software Engineering COCOMO Suite Toolset Ray Madachy, NPS Winsor Brown, USC.
Harmonizing Systems and Software Estimation 23 rd International Forum on COCOMO and Systems/Software Cost Modeling and ICM Workshop USC Campus, Los Angeles,
UNCLASSIFIED Approved for Public Release 07-MDA-2965 (26 OCT 07) Load Bearing Walls: Early Sizing Estimation In The NOSTROMO Tool (U) Dan Strickland Dynetics.
1 Reggie Cole Lockheed Martin Senior Fellow Garry Roedler Lockheed Martin Fellow
11/04/091 Some Topics Concerning The COSYSMOR Model/Tool John E. Gaffney, Jr Center For Process Improvement Excellence.
Overview of Addressing Risk with COSYSMO Garry Roedler & John Gaffney Lockheed Martin March 17, 2008.
Toward A Framework for Implementing Systems Engineering Development for Complex Systems Karl L. Brunson, GWU Thomas A. Mazzuchi, D.Sc., GWU Shahram Sarhani,
Probabilistic Slope Stability Analysis with the
© 2005 San Diego Gas and Electric Company and Southern California Gas Company. All copyright and trademark rights reserved Water Energy Nexus Calculator.
Project Cost Management
Systematic Project Management is our answer to the challenges in today’s project business We have the biggest portion of our business volume coming from.
Analysis Using Spreadsheets
Monte Carlo Simulation Managing uncertainty in complex environments.
Project Management Training
BAE SYSTEMS Electronics & Integrated Solutions (E&IS) Operating Group
CEM 515 Done by: Abdulkarim Sulais
Generalized Reuse Model for COSYSMO Workshop Outbrief
Presentation transcript:

©2006 BAE Systems. COSYSMO Application At BAE Systems Gan Wang COSYSMO Workshop 23 rd International Forum on COCOMO and Systems/Software Cost Modeling and ICM Workshop USC Campus, Los Angeles, CA Oct. 29 & 30, 2008

2 COSYSMO Implementation at BAE Systems Developed System Engineering Estimation Model and Process (SEEMaP) –Estimating end-to-end, system engineering and integration effort in a system development program –Company-wide, common estimating tool deployed across major sites, lines of business (LoBs) and operating groups (OGs), including New Hampshire, San Diego, New Jersey, New York… Desktop tool, calibrated with historical program data across LoBs –With organization and product line-specific calibrations Applied to –ROM estimates –Engineering bid & proposal –Trade studies SEEMaP Workbook: Encapsulating Tool and Process

3 Early Results Excellent Deployed in to E&IS OG –Applied to: ROM, bid & proposal, risk analysis –Mandated use by several organizations Outstanding correlation achieved between estimate and actual in calibrations SEEMaP (COSYSMO) Calibration Early experience shows excellent result: –Variance with other methods (bottom-up): 2–25% –Effort to create estimate: 2-8 hours –Cost saving and cycle time reduction: 85–95% –(Bottom-up may take up to weeks)

4 Quantitative Risk Analysis COSYSMO provides single-point estimates –With fixed driver counts and classification Integrating Crystal Ball quantifies the uncertainty and provides quantitative risk analysis through Monte Carlo Simulation –Crystal Ball will provide a quantified output range of the various scenarios, with a probability of occurrence –A sensitivity analysis provides insight into which inputs most effect the outcome Now it is possible to offer (true) 50/50, 80/20, 20/80 risk positions –Not just to claim them Degrees of Reuse and Difficulties Sizing Parameters

5 Monte Carlo Simulation Generates an Estimate Distribution Monte Carlo Simulation Input Distribution

6 In the Works Total Engineering Estimation Model and Process (TEEMaP) –Extending SEEMaP & COSYSMO capabilities to total engineering –Estimating the total, end-to-end engineering effort in development a system –Deployment in 2009 Apply to company LCM Framework Prepare Bid/No Bid Information Prepare Proposal Contract Accepted Mobilize Initial Design Design System Integration of System System Qualification Production, Installation and Commissioning In-Field Support Disposal Phase Reviews 1B2A2B2C3A3B4567 Milestone Reviews TEEMaP SRR SDR/PDR CDR TRR PRR ROM to determine Cost & Risk positions relative to PTW Develop cost targets & validation of total/functional engineering bids Validate contract pricing & quick trades for scope negotiation TEEMaP Develop engineering baselines and milestone reviews & ETCs TEEMaP Evaluate technology insertion, upgrades, & new opportunities

7 Gan Wang Questions and Comments