Regional Arterial Operation Traffic Responsive Control in Bellevue Washington State Intelligent Transportation Society 2008 ITS WA Annual Meeting Session.

Slides:



Advertisements
Similar presentations
ITE Western District 2012 Annual Meeting
Advertisements

Travel Time Estimation on Arterial Streets By Heng Wang, Transportation Analyst Houston-Galveston Area Council Dr. Antoine G Hobeika, Professor Virginia.
Forecasting OPS 370.
AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
Optimized Signal Timing Plans vs. InSync ® Adaptive Traffic Signals The Results of a New Microsimulation Study by Aleksandar Stevanovic, Ph.D, PE RhythmTraffic.com.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY San Francisco DTA Model: Working Model Calibration Part 2: Results Renee Alsup DTA Peer Review Panel Meeting.
11October 19, 2011 Comparison of Queue Estimation Models at Traffic Signals Jingcheng Wu October 19, 2011 Presented at the 18th World Congress on ITS.
Ramp Metering Pilot Project May 11th, 2010 E. Jason Sims, P.E. Kansas City Scout TMC Manager.
Real-time Estimation of Accident Likelihood for Safety Enhancement Jun Oh, Ph.D., PE, PTOE Western Michigan University March 14, 2007.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
Experience Implementing PORTAL: Portland Transportation Archive Listing Andrew M. Byrd Andy Delcambre Steve Hansen Portland State University TransNow 2.
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
Archived Data User Services (ADUS). ITS Produce Data The (sensor) data are used for to help take transportation management actions –Traffic control systems.
Implementing the ITS Archive Data User Service in Portland, Oregon Robert L. Bertini Andrew M. Byrd Thareth Yin Portland State University IEEE 7 th Annual.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
Mario Fiorillo – Transportation – Civil Mario Fiorillo Present work experience Florida If you have any questions please me at
Transportation Research Board 2004 Annual Meeting Adaptive Signal Control Workshop Session 2: Field Experience January 11, 2004.
1 Segment Level Analysis of Travel Time Reliability Meead Saberi K., Portland State University I-5 SB, San Diego, CA.
Applied Transportation Analysis ITS Application SCATS.
Chapter 4 Forecasting Mike Dohan BUSI Forecasting What is forecasting? Why is it important? In what areas can forecasting be applied?
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
An Intelligent Transportation System Evaluation Tool in the FSUTMS Regional Demand Modeling Environment By Mohammed Hadi, Florida International University.
USING PeMS DATA TO EMPIRICALLY DIAGNOSE FREEWAY BOTTLENECK LOCATIONS IN ORANGE COUNTY, CALIFORNIA Robert L. Bertini Portland State University Aaron M.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
Keeping Wisconsin Moving: An Overview of WisDOT’s DMS Travel Times Kelly Langer, WisDOT, Freeway Operations Supervisor.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
1 A Google-Map-Based Arterial Traffic Information (GATI) System Authors: Yao-Jan Wu Dr. Yinhai Wang Dr. Dalin Qian Date: 10/03/2007.
Congestion Causes and Solutions. Traffic Congestion Characteristics Slower speeds Longer trip time Increased queues More vehicles.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
NATMEC June 5, 2006 Comparative Analysis Of Various Travel Time Estimation Algorithms To Ground Truth Data Using Archived Data Christopher M. Monsere Research.
Moving People Overview. Key Themes Road Hierarchy/Classification Strategic freight corridors Strategic public transport corridors Review and implementation.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
Southwest Washington ITS Traffic Data Collection & Analysis: A Tale of 3 Projects Jill MacKay ITE Traffic Simulation Roundtable October 4, 2012.
November 15, 2005 Dr. Robert Bertini Dr. Sue Ahn Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System.
Highway Transportation Engineering ITS Case Study Component 1 – Student Guide.
Presented by: Pascal Volet, ing. City of Montreal TRB Technical Conference May 9, 2007 A Multi-resolution Modelling Framework in the Montréal Area A Multi-resolution.
Company LOGO Ramp Meters. Company LOGO What are Ramp Meters? Part of NaviGAtor, Georgia DOT’s Intelligent Transportation System (ITS) Also includes electronic.
1 Arterial AMS Deployment Case Study By Joseph Brahm (847)
AASHTO SCOTE Annual Meeting 2011 Dr. Nick Compin Caltrans Office of Systems Management Planning Performance Measurement and Traffic Data Branch Ph: (916)
Forecasting Chapter 9. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Define Forecast.
Using Signal Systems Data and Buses as Probes to Create Arterial Performance Measures Mathew Berkow, Michael Wolfe, John Chee, Robert Bertini,
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Daivamani Sivasailam TPB Technical Committee October 5,
1 based on Federal Highway Administration Capability Maturity Model Workshops Transportation Systems Management and Operations (TSM&O) Performance Measurement.
Wireless Sensor Network Solutions Regional Mobility Solutions Sensys Networks and the Sensys Networks logo are trademarks of Sensys Networks, Inc. Other.
2004 Transportation M etropolitan A tlanta P erformance Report – Congestion Measures Presentation to ITS Georgia August 29, 2005.
SCATS 6.10 Release Review SMUG, March 2013 Sydney.
1 Update on the Congestion Management Process (CMP) and Related Data Activities Wenjing Pu COG/TPB Staff Travel Management Subcommittee Meeting May 26,
Learning Objectives Describe what forecasting is Explain time series & its components Smooth a data series –Moving average –Exponential smoothing Forecast.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
Section 3: New and Experimental Technologies
Use of the Probability of Breakdown Concept in Ramp Metering Clark Letter Dr. Lily Elefteriadou October 30, 2012 University of Florida Transportation Research.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
The MnDOT Metro District Microsimulation Experience Kevin Sommers, PE Minnesota Department of Transportation
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Presentation to Transportation Planning Board October.
Guidance Tool for Implementation of Traffic Incident Management Performance Measures (NCHRP 07-20) December 16, 2014 Brian Hoeft Freeway and Arterial System.
Urban Energy Systems the infrastructure story Prof David Fisk Co-director BP-UES Imperial College London.
Mission Street Project Update Voyage 2070 Advance Operation Systems Using ASTRO Proactive Plan Selection Average and Split Variant operations Prepared.
Performance Measures Used in the DFW Region – How to Track and Report the M & O Investment and Results AMPO Management and Operations Work Group September.
CEE 495/771 – Fall 2008 Topic 9 Ramp Metering Ramp Metering.
Noah likes ramp meters And you should too Introducing Ramp Meters Ramp metering - the process of facilitating traffic flow on freeways by regulating.
Forecasting is the art and science of predicting future events.
Experience Implementing PORTAL: Portland Transportation Archive Listing Robert L. Bertini Steven Hansen Andy Rodriguez Portland State University Traffic.
Brian Kary Minnesota Department of Transportation.
SHRP2 C05: Understanding the Contributions of Operations, Technology, and Design to Meeting Highway Capacity Needs Freeway Data Freeway data has been collected.
Mission Street Project Update Voyage 2070 Advance Operation Systems Using ASTRO Proactive Plan Selection Average and Split Variant operations Prepared.
Mission Street Project Update Voyage 2070 Advance Operation Systems Using ASTRO Proactive Plan Selection Average and Split Variant operations Prepared.
Transportation Research Board 2004 Annual Meeting
Traffic Impact of Pedestrianisation in Stellenbosch
Presentation transcript:

Regional Arterial Operation Traffic Responsive Control in Bellevue Washington State Intelligent Transportation Society 2008 ITS WA Annual Meeting Session 1 November 12, 2008 Presented by Fred Liang City of Bellevue

Bellevue Major Arterial

Signal Pattern Implementation Time of day Scheduling Respond to demand fluctuation

Signal Pattern Implementation Time of day Scheduling Adaptive Control Respond to demand fluctuation

US Adaptive Systems

Signal Pattern Implementation Time of day Scheduling Adaptive Control Traffic Responsive Control (TRSP) Respond to demand fluctuation

TRSP Control Guiding Principles

If TOD plans don’t work, TRSP won’t work

TRSP Control Guiding Principles If TOD plans don’t work, TRSP won’t work If a section is “too responsive”, something could be wronged

TRSP Control Guiding Principles If TOD plans don’t work, TRSP won’t work If a section is “too responsive”, something could be wronged Keep it simple and manageable with defined limits

Selecting Detector(s) 250’- 300’ upstream Critical Approach – Queues Buildup Volume + K *Occupancy (V+KO) Use One or two detector locations Can switch location by different periods Select a different set of timing patterns for each period

Collecting and Plotting Data *V+KO data is smoothed between signal cycles and gathered every minute AMNoon PM

Determining Threshold using Historical V+KO Data

148 th Ave NE Threshold Values AMNoon PM

Determining Threshold using CCTV Identify the detector Monitor traffic and implement timing plan changes when congested Record the corresponding V+KO threshold values Using the threshold values to set up TRSP the next day Monitor the change Repeat the process is needed

Bellevue Square Traffic Detector

Bellevue Square Traffic No Right Turn Sign

I-405 Coal Creek SB Ramp Detector

I-405 Coal Creek SB Ramp

Factoria Blvd

116 th Ave SE

148th Arterial

SB Corridors From Redmond

2008 Halloween PM Traffic

Concluding Thoughts

Traffic Responsive Control “Manage” TOD plans effectively

Concluding Thoughts Traffic Responsive Control “Manage” TOD plans effectively Handle day to day traffic variation

Concluding Thoughts Traffic Responsive Control “Manage” TOD plans effectively Handle day to day traffic variation Handle regular events - weekend, holiday, school events, etc.

Concluding Thoughts Traffic Responsive Control “Manage” TOD plans effectively Handle day to day traffic variation Handle regular events - weekend, holiday, school events, etc. May handle unpredictable events - accident, sales, freeway backup, etc.

Concluding Thoughts Traffic Responsive Control “Manage” TOD plans effectively Handle day to day traffic variation Handle regular events - weekend, holiday, school events, etc. May handle unpredictable events - accident, sales, freeway backup, etc. Give “warning” for timing pattern update

The End