1 BMS activities and brick maniupulation Short summary of 2008 activities and results Extraction and filling activities foreseen in 2009 Black CS extraction.

Slides:



Advertisements
Similar presentations
20/01/09 OPERA general meeting Nagoya CNGS report.
Advertisements

1 STILL open points: lead, ECC Packaging, CS laminated film, skates Construction Strategy Working groups BAM design and construction BAM LNGS site preparation.
1 Brick and Wall dimensions S.Buontempo, J.Dupraz, A.Franceschi, D.Frekers, H.Pessard, P.Mugnier, E.Vanzanella. What do we call a “brick” ? Brick components.
REDUNDANT ARRAY OF INEXPENSIVE DISCS RAID. What is RAID ? RAID is an acronym for Redundant Array of Independent Drives (or Disks), also known as Redundant.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
T. Le Flour LAPP OPERA Collaboration Meeting Gran-Sasso 1 TRACKING THE BRICK HANDLING From extraction to development.
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
PEANUT 2nd RUN proposal Oct. 12, 2006 M. Komatsu.
Jan 16th 2009Spinetti1 Power plant Intervention done by Lngs All short term interventions Repair and deeper maintenance of UPS (Dec 08) Removal of diff.
1 Lecture 17: Basic Pipelining Today’s topics:  5-stage pipeline  Hazards and instruction scheduling Mid-term exam stats:  Highest: 90, Mean: 58.
Far Detector Data Quality Andy Blake Cambridge University.
CS LNGS Current status and perspectives.
November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components.
Location in CSD of electronic detector reconstructed events Scanning results from LNGS scanning lab N. D’Ambrosio, N. Di Marco, L.S. Esposito, P. Monacelli.
Brick Handling Meeting Nagoya T. Le Flour LAPP 1 BRICK HANDLING BMS/BMM Point of view D. Duchesneau T. Le Flour S. Lieunard.
CS LNGS Current status and perspectives Luigi Esposito (European CS Scanning Team)
1 Brick manipulation report BMS machines status Black CS extraction status CNGS brick candidate extraction and BMS planning for 2009 D.Duchesneau LAPP,
Youth Band Goals Sustainability Growth Spirituality Masses (1 st Priority)
CSd scanning report from LNGS Nagoya OPERA workshop January 22 nd, 2008.
CS Brick connection at Nagoya O.Sato
Status of the OPERA experiment Yoshiaki Nonoyama Nagoya Univ.
Scrap Convergence Plan Wuhan lens line #1 Update Feb 5 th Frédéric MORET Feb 5, 2007.
Cuff Account Dashboard
Considerations about the BMS links to other OPERA systems Brick Manipulation Manager Links to other computing systems Needs to define the general framework.
Gran Sasso, 19/03/2003 OPERA Project Board meetingH. Pessard / 1 Brick Manipulator System (BMS) project uEvolutions and final design n Brick sliding and.
Electronic Detector status and run organization Logistics and organization Updates on the electronic detector since last year run Conclusions.
Status of the Brick Manipulation database development Introduction: goal and principles System analysis –The brick life –Manipulation procedures Proposed.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
LNGS Scanning Station Nicola D’Ambrosio (LNGS group) Maiori, 4-6 June 2007.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Status of handling studies for PSB-LIU Caterina Bertone EN-HE LIU-PSB 17/09/2015 Courtesy: A. Newborough EDMS
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
OPERA bricks LNGS G.Rosa, C.Sirignano Emulsion Workshop, 7-9 December 2006.
Chapter 11 Heap. Overview ● The heap is a special type of binary tree. ● It may be used either as a priority queue or as a tool for sorting.
DT1 Gas Section Debrief of 2005 activities.. The Purpose of the Debrief  Compare plan and achievements.  Analyze how the work is done ? Do we meet the.
LNGS Scientific Committee Status of OPERA/CNGS1 April 8 th, 2005 Yves Déclais on behalf of the OPERA Collaboration.
PLATE CHANGER for OIL microscopes Gabriele Sirri INFN Bologna for INFN Bologna and LNGS.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
1 Brick Alternative Layout S.Buontempo on behalf of BAM Committee Present design (Baseline) and “minor modifications” New CS and CSS design Alternative.
Emulsion Development Activity C.Sirignano Opera CM - Mizunami - 20/01/2009.
CERN Meeting 23/09/03 L.A.P.P OPERA T. Le Flour 1 B M M Brick Manipulation Manager FunctionalitiesAndArchitecture D. Duchesneau T. Le Flour S. Lieunard.
Detector Status J. Brunner 12/09/2014. Highlights Line 3 Optical Margins Line 5 UPS Situation Data Taking Status Planned Operations.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
ATC/ABOC days, 24 January 2007Edda Gschwendtner1 CNGS : Status and Outlook Edda Gschwendtner, AB/ATB Summary of CNGS 2006 Reflector Repair OPERA Brick.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
LHCb MUON - ADDITIONNAL SHIELD BEHIND M5 – UNIT AREA Dimensions of 1 iron brick  100 x 100 x 200 mm3 1 ROW of 1200 mm length  12 iron blocks.
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
Glenn Lopez P0Dule Production Planning. Glenn Lopez Overview Eventually want a detailed procedure for P0Dule production Workspace layout is efficient.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
Software and Computing Status of Software development and MC production OpRoot-Fedra MC interface New CVS server Computing resources at CERN: present and.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
LHCb MUON - ADDITIONNAL SHIELD BEHIND M5 – UNIT AREA Dimensions of 1 iron brick  100 x 100 x 200 mm3 1 ROW of 1200 mm length  12 iron blocks.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Creighton University School of Medicine Elective Program Scheduling Instructions.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
Task # 3 Task # kW Target Station Layout proposal Presented by L.Bruno CERN AB Experimental Areas, Targets and Secondary Beams Group.
ICT Course Calendar and Personal Learning Checklist
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Update on the SVD construction
LS1 status 24/03/2014.
Agricultural Marketing
Agricultural Marketing
Agricultural Marketing
Presentation transcript:

1 BMS activities and brick maniupulation Short summary of 2008 activities and results Extraction and filling activities foreseen in 2009 Black CS extraction strategy D.Duchesneau LAPP, Annecy OPERA general meeting Mizunami January 20 th, 2009

2 Brick manipulation activities in 2008  End of initial loading on July 14 th 2008 with bricks in the detector The main achievements in 2008: now January 2007: start filling target July 2008 : end of filling target The BMS(Brick Manipulator System) one robot on each side of the detector bricks today  1.26 kton 6 m

3 Brick manipulation activities in 2008 The main achievements in 2008:  Brick Handling management via BMM tools extensively used successfully  From July 1 st to Dec. 31 st : 1479 bricks extracted following the brick finding requests  BMS extraction commissioned and running in production mode

4 Brick manipulation activities in 2008 Brick Handling management via BMM tools CS X-ray underground Cosmic exposure on surface Shielded area in Hall B

5 Brick Extraction status in 2008: Week : July 2nd – July 31 st CNGS events: 154 bricks Week 31-35: August 1 st – August 31 st CNGS events: 132 bricks Week 36-40: Sept. 1st – Sept. 30th CNGS events: 267 bricks Week 41-44: Oct. 1st – Oct. 31st CNGS events: 417 bricks Week 45-48: Nov. 1st – Nov. 30th CNGS events: 414 bricks Week 49-50: Dec. 1st – Dec. 14th CNGS events: 109 bricks. A number of 25 extraction/day is achievable in a regular way => it includes some recovery time for standard errors Total: 1493 bricks extracted for about 1700 events

6 BMS Machines: extraction and related problems For the 1493 extraction requests already treated, 3 really failed Extraction efficiency is then: ± 0.12 % 3 rows with candidate bricks inside are blocked. and are not yet recovered and no hope to easily recover them The target as of yesterday Those achievements were not done without pain:  BMS Extraction suffers from bad skates + glue + lost/destroyed CS cover  Unexpected and damaging LNGS power cuts on BMS systems and hardware + loss of BMM DB…  Hardware failures: motors, servo-control, vehicle, crashes due to external factors

7 Some numbers about brick handling activities The Brick X ray rate is identical to the CS scan result availability The ‘Sent to development’ is very close to the rate of cosmic pit delivery. Annual periodic effect BMS profibus network RS problem and VV tires BMS vehicle accident RS up to Dec. 15th BMS maintenance and RS VV mistuned

8 It was needed to add 4 additional shelves in Shielded area since the beginning: Storage capacity: 1000 bricks up to Dec. 15th # places on shelves

9 Work and planning organisation for the brick manipulation activities of  Extraction of the remaining CNGS brick candidate (1st and 2nd choice) about 625 in 2009  Extraction of bricks for CS doublet sheet replacement  Replacement of CS doublet sheets  Insertion of bricks with new CS doublet  Insertion of 4000 bricks from last BAM production  Re-insertion of about 650 bricks from CNGS back to the detector  Brick Handling of CNGS brick events

10 Schedule: There will never be mix of extraction of CNGS candidate with CS doublet exchange during shifts and even days; For similar reasons, we will not mix insertion and extraction for CSdoublet exchange during shifts and even days: separate days will be assigned to both activities. The extraction of candidate bricks can be envisaged on dedicated day/week only (possibly Monday during the 2 shifts only if drums are correctly handled). They will get highest priority during these activities. We start CS exchange beginning of February for 12 weeks with some periods devoted to extraction of 2nd brick (but absolutely not mixed as mentioned above). We fill the 4000 new bricks not later than 2 weeks before the start of CNGS using the 2 shift mode even if CS doublet exchange is not finished. They may also be inserted during insertion slots proposed in the following schedule. Brick manipulation activities in 2009 ‘theoretical’ upper limit achievable for the BMS if there is no major hardware failure during 2 shifts/day: BMS Insertion max. rate: 4500 bricks/week  4 drums/day BMS Extraction max. rate: 2/3 of insert rate = 3000 bricks/week

11 Week # in 2009CNGS extract candidate bricks Extract for CS treatment Brick insertionBricks on palette end of week (*) Trays to clean during weekend 3 (Jan 12 th -16 th )70 4 (Jan 19 th -23 th ) (Jan 16 th -30 th ) on Corridor 6 (Feb 2 nd -6 th )cancelled2400 (4days) (Feb 9 th -13 th )40 (1day)2400 (4days) (Feb 16 th -20 th )01200 (2days)2700 (3days) (Feb 23 rd -27 th )01800 (3days)1800 (2days) (Mar 2 nd -6 th )40 (1day)2400 (4days) (Mar 9 th -13 th )01800 (3days)1800 (2days) (Mar 16 th -20 th ) (1/2 prod) 13 (Mar23 rd -27 th )40 (1day) (Ma30 th -Apr3 rd )40 (1day) (Apr 6 th -10 th )01200 (2days)2700 (3 days) (Apr13 th -17 th )40 (1day) (end prod) 17 (Apr20 th -24 th )40 (1day)02200 (BAM prod RS)0 18 (Apr27 th -30 th ) cancelled ???) 40 (1day)1300 Rock side0 Total (*) in addition to the 4000 bricks sitting in Hall B which are produced by the BAM.

12 detector 4.1m6.8m2.7m door 2.7m 19 m drum 1.5m pall 1m table pall 1m fence 2 m 5 m pall 1m passage for pedestrians (>1.2m) about on scale rock of corridor side crane 5 ton crane 25 ton CS replacements layout (taken from Mario’s proposal) All the work of manipulation will be done in Hall C

13 Black CS extraction strategy: 2 groups have to be extracted:  The first bricks produced by the BAM for which there was no hole in the CS envelop: they will be easy to find as they were the first bricks loaded in the detector (Brick Id < 14400)  There are additional 4000 bricks for which there was a hole but stored during long time under vacuum. Those brick positions are not so sharply defined as in the first category. People interested should provide the Brick Ids to the BMS people asap. Extract the first group: concentrated mainly in SM1 bottom rows. The BMS will treat always complete rows of 26 bricks

14 To be careful: some rows contain good bricks or bricks which should not be treated: (0.3% candidate bricks and 0.6% not high fog bricks) : both types will be reinserted in the detector  However the priority will be given according to the rows where there is a maximum of CS to replace. We will use a BMM tool interface to the DB to do the bookkeeping of the extracted bricks (mandatory, about 10% of the target will come out) Activities foreseen on the working tables in Hall C: removal and replacement of the CS enveloppe the activity of replacing the sliding skates the perfect fixation of the CS cover to avoid the disastrous crashes we have presently on certain rows. the control of the brick shape and size in the special tunnel tool Black CS extraction strategy:

15 The END