Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.

Slides:



Advertisements
Similar presentations
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Advertisements

January 11, Data Format for MICE Trackers Tracker Data Readout Basics Preliminary Tracker Data Format and Suitability for VME Data Transfers. Questions.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
Prototype Performance in D0 test stand M.Yoshida (Osaka Univ.)
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Feb 2006Jean-Sébastien Graulich PID Front End Electronics, Outlook after DAQ Workshop 02 Jean-Sebastien Graulich, Univ. Genève o Introduction o Tracker.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1 KEK test beam - introduction - M. Yoshida MICE CM tracker parallel 2005/10/ /10/22.
VME readout fro TOF MICE Tracker Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
Takeo Higuchi Institute of Particle and Nuclear Studies, KEK; On behalf of COPPER working group Jan.20, 2004 Hawaii, USA Super B Factory Workshop Readout.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Control, Monitoring and DAQ Makoto Yoshida Osaka Univ. MICE Frascati June 28, 2005.
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
DAQ for KEK beam test M.Yoshida (Osaka Univ.). Components VLPC readout –Stand Alone Sequencer (SASeq) Slow < 100Hz –Buffering VLPC data with VME interface.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
MICE Workshop Sept 2004 AFEII for MICE Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs between them. AFE has 8 identical.
Status of the preparation for KEK test beam M. Yoshida (Osaka Univ.) MICE VC 2005/9/14.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
Tracker Summary Makoto Yoshida Osaka Univ. MICE Frascati June 28 th, 2005.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
MICE Tracker Readout Status VLPC – Cryo – Front End Electronics A.Bross Berkeley, February 2005.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
1 Introduction to UniDAQ Makoto Yoshida (Osaka Univ.) MICE DAQ 2005/9/1.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Mice CM Oct 2005Jean-Sébastien GraulichSlide 1 MICE Collaboration Meeting Oct05 Review of DAQ Workshop and DAQ Issues Jean-Sebastien Graulich, Univ. Genève.
CKM Data Source System CKM Electronics Group July 2003.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
MICE Phase 1 Koji Yoshimura KEK June
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
KEK beam test in May 2005 Makoto Yoshida Osaka Univ. MICE Frascati June 27 th, 2005.
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
2005/10/24 MICE CM at RAL, KEK test beam, Makoto Yoshida 1 KEK Beam Test for MICE SciFi Tracker - KEK-PS T585 - M. Yoshida MICE 2005/10/ /10/24.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
KEK Test Beam Phase I (May 2005) Makoto Yoshida Osaka Univ. MICE-FT Daresbury Aug 30th, 2005.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
TPC electronics Status, Plans, Needs Marcus Larwill April
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
Tracker Summary M. Yoshida (Osaka Univ.) MICE 2005.Feb.12 th.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
1 DATE-based DAQ Hideyuki Sakamoto CM22, RAL 19/10/08.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
András László KFKI Research Institute for Particle and Nuclear Physics New Read-out System of the NA61 Experiment at CERN SPS Zimányi Winter School ‑ 25.
Tracker readout, DAQ, C&M and calibration
AFE II Status First board under test!!.
Preparation for Station Acceptance Test
Muon Recording Studies and Progress for the MICE Tracker
Tracker Software Status
Presentation transcript:

Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27

KEK beam test Test for the SciFi tracker with 1T solenoid magnetic field Test for the SciFi tracker with 1T solenoid magnetic field p/  /  test beam line in KEK-PS p/  /  test beam line in KEK-PS Slow extraction with 2-sec flat top in 4-sec cycle Slow extraction with 2-sec flat top in 4-sec cycle Typically, 1000 particles in a beam spill Typically, 1000 particles in a beam spill Newly developed Cryostat with Cryocooler Newly developed Cryostat with Cryocooler 2 VLPC cassettes embedded 2 VLPC cassettes embedded Newly developed buffer module, VLSB Newly developed buffer module, VLSB 4 VLSB modules for 4 AFEII boards 4 VLSB modules for 4 AFEII boards

DAQ Software for KEK beam test Will use Unix-based DAQ programs Will use Unix-based DAQ programs “ Unidaq ” developed by KEK “ Unidaq ” developed by KEK A lot of experience at the KEK beam tests A lot of experience at the KEK beam tests Work on Linux PC Work on Linux PC Network distributed system Network distributed system Transport data via NOVA buffer manager Transport data via NOVA buffer manager Processes can be distributed among PCs on the network. Processes can be distributed among PCs on the network. An Event Builder An Event Builder Collectors for TOF etc. and VLPC Collectors for TOF etc. and VLPC

VLPC backplane Linux PC PCI-VME SASeq #2 SASeq # LVDS-VME # 3 LVDS-VME # 4 AFE II (L) AFE II (R) VLPC Cassette #2 VLPC Cryostat AFE II (L) AFE II (R) VLPC Cassette #1 VME BUS System Overview VME ADC/TDC PMTs 6U Serialized ADC DATA Slow Control AFE II Control 1024 ch 8x64 ch 4 4x8bit = 32 bit / board 8x64 ch LVDS-VME #1 LVDS-VME # 2 4 4 4

Status Setup LinuxPC with Bit3 VME interface at Fermilab in Dec Setup LinuxPC with Bit3 VME interface at Fermilab in Dec Start porting the Windows VB routines to C codes on Linux PC Start porting the Windows VB routines to C codes on Linux PC Successful readout pedestal data on a AFEII board in the end of May. Successful readout pedestal data on a AFEII board in the end of May. Initialization AFE boards via 1553 Initialization AFE boards via 1553 Control SASeq Control SASeq Readout buffer module, VLSB Readout buffer module, VLSB GUI is prepared for the test GUI is prepared for the test VME ADC and TDC modules have been tested in May KEK beam test to readout TOF, ACC and other beam counters in UniDAQ framework VME ADC and TDC modules have been tested in May KEK beam test to readout TOF, ACC and other beam counters in UniDAQ framework

Tracker DAQ at Fermilab AFEII Backplane Cryocooler Bit VLSB SASeq

VME ADC/TDC at KEK beam test Multi-hit multi-event TDC (CAEN V1290) multi-event ADC (CAEN V792) UK colleagues provides VME ADC/TDC

To do for KEK beam test Extend slow-controller to handle 4 boards of AFEII Extend slow-controller to handle 4 boards of AFEII Implement AFEII readout routines on UniDAQ framework Implement AFEII readout routines on UniDAQ framework Merge AFEII data with the other ADC/TDC data Merge AFEII data with the other ADC/TDC data Integration test at Fermilab Integration test at Fermilab Time stamp of integration window on Trip chip Time stamp of integration window on Trip chip Tracker prototype will be shipped from UK in July Tracker prototype will be shipped from UK in July LED and Cosmic-ray data taking LED and Cosmic-ray data taking Setup the system in KEK in Aug. Setup the system in KEK in Aug.

KEK beam test triggering scheme Take coincidence of TOF counters Take coincidence of TOF counters Check the timing with charge integration window on Trip chip Check the timing with charge integration window on Trip chip Trip has 48 x 132ns time slots Trip has 48 x 132ns time slots Distribute trigger to CAMAC and VME modules Distribute trigger to CAMAC and VME modules Trip integration window TOF coincidence Event trigger  t : relative timing of trigger to integration window VLPC analog

Trigger (cnt ’ d) 132 ns x 53 = 6996 ns 396 ns x 12 = 4752 ns Live time = 132 ns x 36 / 21 usec = 23% 21 usec DG2020 TOF Trig trig Trig + CLK AFE SASeq sync trig

To do for MICE Event-buffering in VLSB Event-buffering in VLSB Need to trigger 1MHz (1k muons in 1msec from ISIS) Need to trigger 1MHz (1k muons in 1msec from ISIS) Implement zero suppression scheme Implement zero suppression scheme Bench mark test of readout speed Bench mark test of readout speed Establish event numbering scheme / synchronization to the other counters Establish event numbering scheme / synchronization to the other counters

Data Rate in KEK test Prototype has 2048ch readout channels Prototype has 2048ch readout channels Beam  2 beam line: continuous 1000 muons / 2 sec Beam  2 beam line: continuous 1000 muons / 2 sec AFEII  VLSB (VME LVDS SERDES Buffer) AFEII  VLSB (VME LVDS SERDES Buffer) 2 Bytes / channel 2 Bytes / channel 20 53MHz (multiplex 2 channel = 10bits + 10bits) 20 53MHz (multiplex 2 channel = 10bits + 10bits) 64 x 1/53MHz ~ 1  sec for a trigger 64 x 1/53MHz ~ 1  sec for a trigger VLSB  VME bus  PC VLSB  VME bus  PC Measured Transfer rate by KEK-online group with Bit3 Measured Transfer rate by KEK-online group with Bit3 23MB/s in DMA mode 23MB/s in DMA mode 2MB/s in PIO mode 2MB/s in PIO mode 4MB / 4-sec-spill 4MB / 4-sec-spill Need to transfer 4kBytes in 1 msec w/o buffering Need to transfer 4kBytes in 1 msec w/o buffering In case of zero suppression by DISCR, data rate could be reduced to ~1/10 In case of zero suppression by DISCR, data rate could be reduced to ~1/10

Summary We are preparing stand-alone DAQ system for tracker We are preparing stand-alone DAQ system for tracker VLPC readout VLPC readout VME ADC/TDC VME ADC/TDC Not yet on slow-control Not yet on slow-control To fit to MICE case To fit to MICE case Need event buffering (~1k muons / 1msec) Need event buffering (~1k muons / 1msec) Need trigger / event numbering scheme Need trigger / event numbering scheme