DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Cruisin’ Over the UP Mainline 8:27 / 9.1 miles 2005 Grand Challenge Course 8:27.

Slides:



Advertisements
Similar presentations
GPS Tracks & Timings of Prospect Eleven’s Autonomous Run of DARPA’s 2005 Course October 31, 2005.
Advertisements

GPS Tracks & Timings of Prospect Eleven’s Autonomous Rerun of Beer Bottle Pass November 1, 2005.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 The Finish 19:36 / 132 miles 2005 Grand Challenge Course 19:36.
Prospect Eleven Fixin’ One Line of Code UNLV October 30, 2005.
DAPRPA Grand Challenge, Unfinished Business, November 2, :50 11:08 10:50 / 43 miles 2004 Grand Challenge Course.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Prospect Eleven As Rescue Vehicle, 11:56 / 48.6 miles 2005 Grand Challenge Course 11:56 11:33.
DAPRPA Grand Challenge, Unfinished Business, November 2, 2005 The Finish 18:44 / 143 miles 2004 Grand Challenge Course.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Back by Primm 8:18 PST 2005 Grand Challenge Course 8:18.
DAPRPA Grand Challenge, Unfinished Business, November 2, :19 / 63 miles 2004 Grand Challenge Course 12:19.
National Qualifying Event (NQE) California Speedway, Fontana, CA September 27 – Oct 5, 2005.
Prospect Eleven’s Autonomous Run of DARPA’s 2005 Course October 31, 2005.
DAPRPA Grand Challenge, Unfinished Business, October 31, :53 / 11.8 miles 2005 Grand Challenge Course 8:53.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Cruisin’ Autonomously, 10:31 /36 miles 2005 Grand Challenge Course.
DAPRPA Grand Challenge Event, October 08, 2005 The Launch of Prospect Eleven 2005 Grand Challenge Event Launch Movie.
DAPRPA Grand Challenge, Unfinished Business, November 1, 2005 Beginning the Assent: 16:57 Rerun to Beer Bottle Pass.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Dry Again Lake Bed 8:05 PST 2005 Grand Challenge Course 8:05.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Approaching Beer Bottle Pass 19:02 / miles 2005 Grand Challenge Course 19:02.
DAPRPA Grand Challenge Event, October 07, 2005 The Day Before; “E-119” Garage 2005 Grand Challenge Event.
DAPRPA Grand Challenge, Unfinished Business, November 2, :22 / 77.2 miles 2004 Grand Challenge Course.
DAPRPA Grand Challenge, Unfinished Business, November 2, :08 / Start 2004 Grand Challenge Course 7:08.
DAPRPA Grand Challenge, Unfinished Business 2004 Grand Challenge Course 143 miles The ’04GC Team 2004 Grand Challenge Course.
DAPRPA Grand Challenge, Unfinished Business, November 2, : Grand Challenge Course.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Dry Lake Bed 8:13 PST 2005 Grand Challenge Course 8:13.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Another Narrow Gate, 11:12 / 46 miles 2005 Grand Challenge Course 11:12.
Exponential Technology, Disruption and Public Safety Rick Smith Founder & CEO TASER Exponential Advisory Board.
DAPRPA Grand Challenge, Unfinished Business, November 1, 2005 Back & Forth Return to Beer Bottle Pass Route to/from Beer Bottle Pass from Start of 2005.
DAPRPA Grand Challenge, October 8, 2005 Grand Challenge Event Autonomous Run, 9.4 miles Finish, 9.4 miles Start PassBy.
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1 © 2011 Cisco and/or its affiliates. All rights reserved. 1 Snorre Kjesbu.
Embedded Systems Development and Applications Terrence Mak The Chinese University of Hong Kong CENG4480 Fall 2014/15.
Your family is taking a trip across the USA starting this afternoon. In fact, your family is picking you up right from school and you are going to be.
BEFORE THE SURFACE TRANSPORTATION BOARD WASHINGTON, DC _______________________________________________ STB DOCKET NO. AB X _______________________________________________.
Michigan Road Trip. Round Trip AB 0 50 Your trip starts at point A, and you drive to point B. That is considered “one way”. You have to drive back from.
GPS Tracks & Timings of Prospect Eleven’s Autonomous Run of DARPA’s 2004 Course November 2, 2005.
The Fourth Annual 2004 Edition. Mississippi Valley 24 Hour Challenge August 14-15, 2004 New Baden Village Park New Baden, Illinois.
Collision Course An Investigation Collision Course Two cars are on a collision course, heading straight at each other. One car is traveling at 50 miles.
ID:wood 1-3. October 2013, Innovation Course in Belgrade I n n o v a t i v e w o o d p r o d u c t d e s i g n at Department of Technology, Management.
Grade Level Physical Challenges. The Concept: Each student in EACH grade level completes a rigorous TEAM challenge that is also personally challenging.
CJA 304 Week 5 Course Summary Post a summary of what you learning in this course. What did you find that was useful or that challenged your thinking? To.
ETH 557 Week 3 DQ 1 To purchase this material link 557/ETH-557-Week-3-DQ-1 For more courses visit our website
IT 242 Week 3 DQ 1 To purchase this material link 242-Week-3-DQ-1 For more courses visit our website
IT 242 Week 7 DQ 2 To purchase this material link 242-Week-7-DQ-2 For more courses visit our website
WS/FCS Market Share Marty Ward, PhD
BICYCLE AND PEDESTRIAN MASTER PLAN FINAL PRESENTATION
Linux Kernel fun with the Eudyptula Challenge
Business Management Courses Gives Competitive Edge.
ACCT 244 MENTOR Education for Service--acct244mentor.com.
You’re Invited To William’s You’re Invited To William’s
فصل نهم از کتاب طراحی آموزشی تألیف :آر.ام گانیه
James Pflum, P.E. Traffic Safety and Blueprint Conference
The Challenge of Seamless Access National Forest
Natural and Human Changes to Rocks
Meeting the Needs of TAG and Accelerated Students (Secondary)
Paintings, Drawings and Prints by Rachel Glittenberg & Pauline Smith
A 175 mile “race” through the desert
HANCEVILLE CROSS COUNTRY INVITATIONAL (5K)
The Basics Subtitle.
Machine Learning Course.
General Membership Meeting ATAC-5036 ( Lakehead campus)
Title of you poster here
Mixed Up Multiplication Challenge
POWER CHALLENGES Several Ways To Solve 7 CHALLENGES.
August 31-September 3.
AWS course in bangalore.
Data science course in Bangalore.
Data Analytics course.
Business Plan Document: Analyst: Date:
Calculus M 31 October 2011.
Public sector Martin Kellaway
Technical proposal Challenges and Opportunities of Private real-state development in Mekelle.
Presented By : Project Management CoursesProject Management Courses.
Presentation transcript:

DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Cruisin’ Over the UP Mainline 8:27 / 9.1 miles 2005 Grand Challenge Course 8:27

DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Cruisin’ on Private Road 8: Grand Challenge Course

DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Cruisin’ Over the UP Mainline 8: Grand Challenge Course

DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Over the UP Mainline 8: Grand Challenge Course