Managed by UT-Battelle for the Department of Energy Follow-on MERIT Testing at ORNL Van Graves.

Slides:



Advertisements
Similar presentations
A Free Jet Hg Target Operating in a High Magnetic Field Intersecting a High Power Proton Beam Van Graves, ORNL P. Spampinato,T. Gabriel, ORNL H. Kirk,
Advertisements

NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
Harold G. Kirk Brookhaven National Laboratory Targetry Plans and Status MUTAC Review FNAL March 17, 2006.
Target System Transportation and Decommissioning P.T. Spampinato V.B. Graves Hg System Safety Review CERN June 19-20, 2006.
K. McDonald LEMC Workshop 22 Apr 2008 From MERIT to a Muon Collider (Front End) K.T. McDonald Princeton U. Low Emittance Muon Collider Workshop Fermilab,
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 11 Mar 2009 Neutrino Factory Cryostat 1 Concept V.B. Graves MERIT Videoconference.
1Managed by UT-Battelle for the U.S. Department of Energy NF/IDS Hg Vessel Layout 30 Jun 09 Cryostat 2 Front Drain Mercury Vessel Concept Matthew F. Glisson.
MERIT Equipment Disposal Van Graves MERIT Video Conference September 1, 2010.
Harold G. Kirk Brookhaven National Laboratory Targetry Program 5 Year Plan H.G. Kirk Muon Collaboration Meeting LBNL February 16, 2005.
MERIT Primary Containment Inspection Van Graves MERIT Video Conference October 13, 2010.
E951 POWER SUPPLY SAFETY REVIEW 9/06/02 IOANNIS MARNERIS Brookhaven National Labs.
Harold G. Kirk Brookhaven National Laboratory Hg Jet Quadrupole Distortions MERIT Collaboration Meeting Princeton November 17, 2005.
Managed by UT-Battelle for the Department of Energy Using Lead-Bismuth Eutectic in MERIT Syringe Pump Van Graves October, 2007.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Optics Cleaning Status 31 August 2011 MERIT Optics Cleaning Status V.B. Graves August 31,
IDS120f Field Contours Van Graves IDS Phone Conference Feb 22, 2011.
1Managed by UT-Battelle for the U.S. Department of Energy NMFCC Friday Meeting 10 Apr 2009 Neutrino Factory Nozzle Layouts V.B. Graves NFMCC Friday Meeting.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.
A recap of some in-class problems/questions dealing with charged particles accelerating across a potential difference and/or being steered or deflected.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
Managed by UT-Battelle for the Department of Energy Follow-on MERIT Testing at ORNL Van Graves NFMCC Friday Meeting Feb 29, 2008.
High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
MERIT Primary Containment Chamber Surface Inspection – Updated Dec 5, 2011 V. Graves MERIT EVO November 23, 2011.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
Managed by UT-Battelle for the Department of Energy Hg System Decommissioning Activities V.B. Graves NFMCC Friday Meeting Feb 29, 2008.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
TDS 210 BASIC INSTRUCTIONS. Measure 1. Push the MEASURE button to access the automated measurement. 2. capabilities. There are five measurements available.
IHEP participation in SIS300 production UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Institute for High Energy Physics Protvino, Russia FAIR meeting.
ORNL is managed by UT-Battelle for the US Department of Energy 2-K Pump Down Studies at SNS Presented at the CEC/ICMC 2015 – C3OrA Matthew Howell SCL Systems.
Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
EPICS for Neutron Scattering Beam Lines Steven Hartman EPICS Meeting, 2 May 2013.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
MERIT Primary Containment Chamber Surface Inspection V. Graves MERIT EVO November 23, 2011.
Managed by UT-Battelle for the Department of Energy Weatherization Assistant: Ramp Up Support Mark Ternes Mike Gettings Oak Ridge National Laboratory 2009.
Advance Procurement Plans Sonny Rogers Contract Services Group Manager Presented to: 2010 Capital PERT Annual Meeting February 24, 2010.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Fast Read Employee Experience (FREE) Teresa Cochran Operational Experience/Lessons Learned Program Manager UT-Battelle, LLC / Oak Ridge National Laboratory.
High-Intensity Focused Ultrasound Therapy Array May1005 Alex Apel Stephen Rashid Justin Robinson.
Oak Ridge National Laboratory Ted Fox Deputy Associate Laboratory Director Energy and Engineering Directorate March 19, 2009.
Thomas Jefferson National Accelerator Facility SensL 6-Oct CHL-2 12 GeV CEBAF Upgrade magnets and power supplies Two 1.1GV linacs Enhanced capabilities.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
October 9th, 2007 Daresbury – Positron Kick-Off Meeting Slide 1 Remote Handling Vinod K. Bharadwaj SLAC October 9th, 2007.
Electric field at 11 May. Near surface electric field at Aragats.
Neutrino Factory Target Vessel Concept Update V. Graves Target Studies EVO June 12, 2012.
Amateur Radio Licensure Week 5: Advanced Electronics Seth Price, N3MRA New Mexico Institute of Mining and Technology February 28, 2016.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Mike Anerella December 17, 2013
EPFL-SPC, 5232 Villigen PSI, Switzerland
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Cornwall Central School District
ESS RF Development at Uppsala University
Physics 114: Lecture 6 Measuring Noise in Real Data
PULSE PROTOCOL – P2 Capacity and organization GROUP NUMBER:
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Presentation transcript:

Managed by UT-Battelle for the Department of Energy Follow-on MERIT Testing at ORNL Van Graves

2Managed by UT-Battelle for the Department of Energy MERIT Testing at ORNL New Capabilities at ORNL  Discussions with Tim Bigelow, ORNL Fusion Energy Division, indicate some existing experimental power supplies will be moved from Y-12 to ORNL  Some of the power supplies will have capability to power MERIT solenoid –650V peak –15,000A pulsed > 5sec –Voltage and/or current can be controlled by SCR gate waveform control

3Managed by UT-Battelle for the Department of Energy MERIT Testing at ORNL 7627 Power Supply Building  New building  Final design complete  Located behind 7625 Schedule completion: Sept 2008 Several power supplies will be installed Bldg 7625 Bldg 7627

4Managed by UT-Battelle for the Department of Energy MERIT Testing at ORNL Bldg 7625  Pit capable of housing MERIT experimental equipment  LN2 dewar in place  20T overhead crane

5Managed by UT-Battelle for the Department of Energy MERIT Testing at ORNL Equipment Layout 7627 Vertical field power supplies 650V peak 15,000 A pulsed > 5 sec Voltage and/or current can be controlled by SCR gate waveform control

6Managed by UT-Battelle for the Department of Energy MERIT Testing at ORNL Comments  Major infrastructure should be available in late 2008, but connection costs may be incurred  Hazard analysis (radiation, Hg, LBE) will have to be performed, but no major obstacles envisioned  Other power supplies will be available (capabilities unknown at this time) that might be useful for other HEP experiments in the future