CAMERA MATERIALS TEST CHAMBER Jack Singal 9/17/08 LSST Camera Workshop Turbo pump Optics table scroll pump and LN trap (for roughing A1, A3, and LL)

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

LAPD Run 2 Results and Notes Terry Tope
Fuel System The fuel system supplies the air and fuel necessary for an engine to produce power. The fuel system includes: Air Cleaner Fuel Supply Carburetor.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
MQXFS Coil Impregnation Procedure and Discussion 11/13/2014.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
SSRF1 ALUMINUM ALLOY VACUUM CHAMBERS FOR SSRF L.X. Yin, D.K. Jiang, H.W. Du, X.L. Jiang SSRF Vacuum Group Shanghai National Synchrotron Radiation Center.
ECE5320 Mechatronics Assignment#01: Literature Survey on Sensore and Actuators Topic: Quartz Crystal Microbalances Prepared by: Jack J Stepan Dept. of.
A Solder Reflow Oven Dylan Gifford David Cobler. A typical $30,000 Reflow Oven Solder Paste Surface Mount Technology.
1 VACUUM ATMOSPHERES Co NEW PRODUCT ANNOUNCEMENT November 28, 2001.
6/8/2006 Particle Physics Division Technical Centers 1 Vacuum Deposition Thin Film Coatings Facility at Lab 7 Eileen Hahn.
ISHELL Design Review Cryostat & Optics Bench Dan Kokubun 9/11/2013.
LIGO-G Z D. Ugolini, LSC March Progress Report on Charging Measurements at Trinity University Dennis Ugolini, Robert McKinney, Mark Girard.
Solar Cell conductive grid and back contact
CsI Photocathode Production and Testing
HBD Tasks Outline Thomas K Hemmick. New News  Second good QE result from Bob.  New quotes on reduced Glove Box:  $39,000 will not work (air lock too.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
Gusev Konstantin, Kurchatov Institute / JINR , Gerda meeting Some technical aspects of testing and adaptation of existing detectors.
Setting up the Ricoh C305 Press F5 to start the Presentation
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
LiH Casting & Testing1 Lithium Hydride Disc Casting & Testing Approaches C. M. Lei March 2, 2007.
SAXS/WAXS Conversion for Beamline Engineering Review.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Control of Contamination in The Cryostat Rafe Schindler SLAC Internal Camera Review October 14, 2008.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
1 Getting a Sample to Test your Board!. 2 Step 1: Opening the detector housing Open the detector housing and remove the lid.
EMAS Vacuum Testing June 2, 2011 Last 2 slides added after Feb 28, 2012 getter initiation Mike Watson.
Manual Density Business Today
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
Effects of Breathing on an Interferometer Susan Gosse Daniel Freno Junior Lab II.
May’02, TRT Workshop Jack Fowler – Duke University SEM Analysis of Wire from Aging Test #7 at Duke University Jack Fowler.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
Cs 2 Te Photocathodes for CTF3 Photoinjectors R. LOSITO - CERN 4/10/2006.
National Ignition Facility Vacuum Systems Presentation to OLAV Workshop, ORNL July 11-14, 2011 NIF Vacuum Subsystems Managers Igor Maslennikov* John Hitchcock.
BL SAXS End Station (Small Angle X-ray Scattering)
LARP Collaboration Meeting Racetrack Coil Fabrication
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Multiple Module Vacuum Oven Productivity Enhancement System.
Hygrometry Part 2.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
1 HMPID Project Assembly & Tests of CsI QE monitors: VUV-scanner and ASSET Milestone: December 2002.
Roughness and Electrical Resistivity of Thin Films Spencer Twining, Marion Titze, Ozgur Yavuzcetin University of Wisconsin – Whitewater, Department of.
New single-chip “box” to test laser soldering in vacuum WP6 meeting, 16/01/14.
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
AIR COOLING & PROFILOMETRY OXFORD SYSTEM IMPLEMENTATION P.A. COE – OXFORD THURS 08 SEPT 2016 AIR COOLING & PROFILOMETRY.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Installation of the T600 at Fermilab
Apparatus Setup Jason Quill Eric Richardson.
Presentation Short Title
Lab Equipment.
K. H. Lee, H. Y. Lee, Young-Gi Kim, J. Yang, S. M. Yang, K.J. Chung, Y.S. Na and Y. S. Hwang Residual Gas analysis during Glow discharge cleaning, Baking.
VELO Thermal Control System
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
ELECTRONIC CIRCUIT DESIGN & MANUFACTURE
Laboratoire des Matériaux Avancés - Lyon
VELO Thermal Control System
Test box for ProtoDUNE SP – Integration Test
iSHELL Design Review Cryostat & Optics Bench
By: Christopher Shing October 7, 2010
Wiring the Light and Relay
Photographs of Front of Detector
Prototyping with Micro-controllers, Sensors, and Materials
SNS PPU Cryomodule Instrumentation
Prototyping with Micro-controllers, Sensors, and Materials
Prototyping with Micro-controllers, Sensors, and Materials
Prototyping with Micro-controllers, Sensors, and Materials
SNS PPU Cryomodule Instrumentation
Presentation transcript:

CAMERA MATERIALS TEST CHAMBER Jack Singal 9/17/08 LSST Camera Workshop Turbo pump Optics table scroll pump and LN trap (for roughing A1, A3, and LL)

Refrigerator Andy’s metrology setup More lab this way KIPAC/HEPL room B02 CMTC on Stanford main campus Unrelated lab thru here

zoomed view C3C2 C1 A1 A3 A2

schematic

~ 1Wk Procedure for Each Sample ActionDuration 1)Material Sample Entered into Database, cleaned and dried as appropriate2 hr 2)Sample is measured and weighed, and exposed to 50% RH for 24 hrs. Sample is reweighed 1 day 3)Sample is baked in vacuum oven at max allowed temperature and reweighed2 day 4)Sample is introduced into A11 hr 5)Sample is re-baked in C1 at max allowed temperature0 – few days 6)If necessary, background ROR levels are taken in C2 (time depends on what temperatures are desired). RGA <1 day 7)Sample is moved to C2 and placed in sample box1 hr 8)ROR levels are taken in C2 (time depends on what temperatures are desired)1 day 9)Measure deposition in C2 with cold quartz balance monitor1 day in parallel 10)Glass disks introduced into A31 hr 11)Glass disk moved to C2 and cooled2 hr 12)Outgassing products deposit on glass disk1 day 13)Contaminated glass disk moved back to C3, stabilize light source1 hr 14)Light transmission through ‘clean’ and ‘contaminated’ glass disks measured in C31 day 15)Glass disks warm and outgas in C3. ROR measurements vrs temperatures RGA measurements 1 day in parallel 16)Glass disks removed through A31 hr 17)Sample and box removed through A21 hr

Work to complete CMTC Connect fluid lines from refrigerator Build sound dampening housing around refrigerator Commissioning…..microbalance, optical system Demonstrate with “dirty” sample ? FR4 ?

Materials to be tested (should discuss priority) Feed-thru epoxy (done with ROR) Airborn connector Misc Boards (with and without coating) Misc Cables Exposed Solder joints Other epoxies Misc Wire (thermocouples, etc…) ??

ROR results on feed-thru epoxy Just the standard products No ROR above background level at 20º C, only at 50º and 90º C

ROR results on feed-thru epoxy Outgas rate 55°C (torr-liters/sec/cm 2 ) Outgas rate 90°C (torr-liters/sec/cm 2 ) H2H2 6.2x x10 -7 H2OH2O1.6x x10 -7 N2N2 1.7x x10 -7 CO 2, IPA5.6x x10 -8 Volume of C2: 39.2 liters Surface area of epoxy puck: 2.1 cm 2 (2x)

ROR: compare feed-thru epoxy to coated circuit board

Douglas FEED THRU EPOXY Parylene-C COATED CIRCUIT BOARD 55°C (torr-liters/sec/cm 2 ) 90°C (torr-liters/sec/cm 2 ) Index60°C (torr-liters/sec/cm 2 ) 79°C (torr-liters/sec/cm 2 ) Index H2H2 6.2x x x x H2OH2O1.6x x x x N2N2 1.7x x x x CO 2 IPA 5.6x x x x Volume of C2: 39.2 liters Surface area of epoxy puck: 2.1 cm 2 (2x) Surface area of board: 2.6 cm 2 (3x)

C1 inside view Samples come in from A1 on mag. transport arm Heaters (2) Samples proceed to C2 Thermocouples (2)

C2 inside view Samples enter from C1 Sample boxes enter and exit thru A2 Glass disks come in from C3 clean and go back dirty RGA Glass disk stage Thermocouples (3) Heaters (2) refrigerant loop Cold strap Quartz balance (crystal is under stage) “Wobble stick” Sample box platform

C3 inside view Glass disks come in and go out thru A3 To C2 Light beam comes up thru bottom, passes thru disks and is detected above “wobble stick” Refrigerant loop Light beam Actuator piston moves basket back and forth Thermocouple (1) double glass disk stage Cold strap bent down in “U” to allow motion

Glass Disk Holder and Sample Box Glass Disk Holder (clamps glass and sits snuggly in baskets) Sample box (sliding lid and 2 holes for outgassing)

Optical setup overview Light source detector diode mounted here Beam goes through glass disks in C3 Repeated with each of 6 band passes: nm nm nm nm nm nm

Optical setup box Filter wheel Beam splitter Reference diode aperture TO C3

Final picture: some peripherals microbalance 50% RH environmentVacuum oven