ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.

Slides:



Advertisements
Similar presentations
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Advertisements

Frequency Scanning Interferometry (FSI) measurements
Stephen Gibson, ATLAS Offline Alignment, 2 nd July Incorporating FSI with the Offline Alignment Overview ATLAS Group, University of Oxford Stephen.
S. M. Gibson, IWAA7 November ATLAS Group, University of Oxford, UK S. M. Gibson, P. A. Coe, A. Mitra, D. F. Howell, R. B. Nickerson Geodetic Grids.
MONALISA: Interferometric Position Monitor at the Nanometre Scale David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
AMULET Advanced Metrology Using LasEr Tracers John Dale.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
MONALISA installation at the ATF2 ATF2 weekly meeting.
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
The Linear Collider Alignment and Survey (LiCAS) Project Richard Bingham*, Edward Botcherby*, Paul Coe*, Grzegorz Grzelak*, Ankush Mitra*, Johannes Prenting.
Initial Calibration and Stability Results from the LiCAS RTRS FSI System John Dale for the LiCAS Collaboration IWAA February 2008.
Final Doublet Stability and in-detector Interferometry MONALISA David Urner Oxford University.
Sta bilization of the F inal F ocus : Stabilization with Nano-Meter Precision.
25/06/2015Robert King, Oxford University - Graduate Seminar Series 1 Electronic speckle pattern interferometry at the SLHC.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
StaFF: Motion Stabilization with Nano-Meter Precision Proposed experiment conducted within framework of StaFF (Stabilization of Final Focus for ILC). Funded.
S. M. Gibson, P. A. Coe, Photon02, 5 th September Coordinate Measurement in 2-D and 3-D Geometries using FSI Overview ATLAS Group, University of.
MONALISA David Urner, Armin Reichold, Paul Coe, Matthew Warden, Geoff Rayner Monitoring Alignment and Stabilisation with high Accuracy (Previously known.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
MONALISA LiCAS D.Urner +, A. Reichold +, G. Grzelak* P. Coe +, C. Uribe-Estrada +, Y. Han + M. Warden +, J. Dale +, G. Moss + P. Brockill +, S. Cohen +,
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
1 StaFF Progress Report David Urner University of Oxford.
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
Tue 31 Mar :50 (CEST) 13:50 UTC CLIC stabilisation day 5 - LAPP OXFORD MONALISA 1 Options for interferometric monitoring of CLIC test magnet M.
Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November,
MONALISA an Update David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Stabilization of Focus at ATF2 David Urner University of Oxford.
MONALISA David Urner Oxford University. Straightness Monitor Build from Distance Metres Decision taken this workshop to move from existing extraction.
Welcome to MONALISA A brief introduction. Who we are... David Urner Paul Coe Matthew Warden Armin Reichold Electronics support from CEG Central Electronics.
CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting Status of the R3B-GLAD Magnet DIRAC-Phase-1 Annual Report Meeting 26 September 2006 Bernard Gastineau.
The stabilisation of the final focus (StaFF) system Sun 12 th March 2006 MDI – LCWS06 at I I Sc Bangalore David Urner, Paul Coe, Armin Reichold.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 1 / 26 MONALISA Laser based alignment and stability monitoring.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
MONALISA Update David Urner ATF2 Meeting Dec
FD Movers and Alignment Methods Superconducting Magnet Division, BNL IRENG07 Workshop: September 19, 2007.
Laser Alignment System for LumiCal and BeamCal Arkadiusz Moszczyński, Wojciech Wierba, Leszek Zawiejski Institute of Nuclear Physics PAN, Cracow 22nd FCAL.
ATF2 weekly meeting 4 July 2007 MONALISA: Attachment of Vacuum Vessels for ATF2 David Urner.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
FP7: EuCARD after a year of preparation… A.Jeremie.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA Double Bellow System Forces test results Oxford: June 2009.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
Alignment and stability session
David Urner Oxford University/JAI
Summary FD Support System
on behalf of the CLIC active pre-alignment team
David Urner Paul Coe Matthew Warden Armin Reichold Oxford University
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
CLIC-ILC BDS & MDI work.
SCU Next Phase Meeting July 8, 2014.
Andrei Seryi Materials for discussion TILC-08
Isotropic View Conceptual Design for MONALISA setup at CERN Magnet
IP configuration session
David Urner, Armin Reichold , Paul Coe, Matthew Warden, Geoff Rayner
BDS EDR Discussion EDR Organisation? Discussion of WP distribution
Presentation transcript:

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 2 M.S. Warden, P. A. Coe, D. Urner and A. Reichold MONALISA ILC roles and requirements Interferometer measurements Recent results Highlights 2009/10

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 3 Roles at ILC Monitor most position sensitive magnets –Final focus quadrupoles –Energy chicane magnets –Beam delivery system Provide independent monitor of position –Cross check beam-based measurements –Provides measurement when beams absent –Help relocation after push-pull ILC roles

Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 4 (Random example) ILD Letter of Intent QD0 alignment ILC roles

Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 5 ILC detectors All 3 concepts call for interferometer system –letters of intent mention the idea –19 Apr push pull ACFA and GDE/BDS session Later detailed engineering –where and how to arrange lines of sight –trade off between different options studies at ATF-2 and CLIC will inform this process –other outstanding issues would include: monitoring cold mass non-trivial opening / closing lines of sight not yet mentioned in push-pull plans – probably too early to discuss now ILC roles

Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 6 LHC lessons Routing fibre –coupled interferometers requires more space than you might think ATLAS FSI Put lines of sight into the design as early as possible CMS ILC roles

Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 7 Narrow lines favoured through detector Platform attached To Detector 5cm vacuum tubes ILC roles

Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 8 Interferometer: Distance meter Absolute distance Displacement Operates in two modes –Absolute Distance (<  m resolution) –Displacement measurement (nm resolution) Two modes combined –Displacements referred to absolute distance –Tolerant to interruption of measurements Interferometry

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 9 1.Simulated fringe pattern – read out with parallel fibre array 2.Converted to interferometer phase reading 3.Measurements all based on phase values Interferometer: Distance meter Interferometry

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 10 Interferometer head Prototype tested at Oxford Interferometry

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 11 Interferometers: Make relative measurements Distance Meters measure point to point –Range and displacements (  changes) 2 lasers reduce systematic errors of range –We use FSI laser and the FFI laser Compact Straightness monitor –Combines distance meters to measure object to object 3 translational degrees of freedom 3 rotational degrees of freedom Interferometry

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 12 Instruments: CSM Compact Straightness Monitor Example from ATF2 –Measures plane to plane Internal displacements and rotations measured CSM always blind to 6 external DoF Interferometry

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 13 Recent tests Verified laser frequency stability –EUROTeV-Report (EPAC08 Paper: TUPC121) Demonstrated FFI and FSI agreement inside vacuum vessel –see next slide Results

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 14 Changing pressure atmvac Good agreement between FSI and FFI Strong correlation between pressure and measured OPD Displacement (microns) Calculated overall change: 62  m Results

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 15 Highlights 2009 / 2010 Installation at ATF-2 –July 09 install, test vacuum vessel at ATF2 –Autumn install, test optics at ATF2 –Commissioned system by Jan/Feb 2010 Test magnet at CLIC –Simple initial interferometers mid 2010 –Upgrade to CSM tests 2011 Laser stabilisation system at Oxford –to provide Rb frequency reference –commissioning in / 2010

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 16 ATF-2 installation / 2010 Double bellow system –encloses vacuum in centre –high pressure outer Shintake table QD0 CSM interferometers –lines of sight along centre –reflectors on Shintake –launch heads on QD0

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 17 Monitoring CLIC magnet 2010 Floor Magnet Test several points along the magnet –at first independent DMs Compare readings with accelerometers –on the magnet –and on the floor 2009 / 2010

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 18 Summary Installation at ATF / 2010 Installation at CLIC test magnet 2010/11 System testing / development ongoing at Oxford Valuable information from this programme feeds directly into ILC and CLIC requirements for interferometric monitoring

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 19 Thank you for listening

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 20 Back up slides – beyond this point

ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 21 Ideal Case: Direct View of QD0 Yoke QD0 Enclosure Needs retraction mechanism 2d laser grid QD0 Only small connection force required to kick-start vacuum. ILC roles

Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 22 Separation of Tasks: No direct view Yoke QD0 Enclosure 2d laser grid In air: unclear how accurate this can be. In vacuum Produces fairly difficult to understand region. 4cm ILC roles