Introduction Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar

Slides:



Advertisements
Similar presentations
 Project Overview & System Integration Ted Liu June 11th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting.
Advertisements

Final Commissioning Plan and Schedule Cheng-Ju Lin Fermilab Installation Readiness Review 09/27/2004 Outline: - Work to be done during shutdown - Work.
Slink TX Slink merger Teststand setup Slink merger firmware and testing Firmware features - DAQ RAMs for saving out input and output data - Possible to.
Resource Management with YARN: YARN Past, Present and Future
Pulsar Teststand Room -- Pulsar was initially designed as a teststand tool In God we trust, everything else we test Ted for the Pulsar Group(s) With Pulsar.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/20 New Experiences with the ALICE High Level Trigger Data Transport.
Initial Step to go beyond 200E30 Ted TDWG, Sept 1st 2006.
Title US-CMS User Facilities Vivian O’Dell US CMS Physics Meeting May 18, 2001.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
A presentation by Angela Little SULI Program 8/4/04 Pulsar Boards and the Level II Trigger Upgrade at CDF.
1 Pulsar firmware status March 12th, 2004 Overall firmware status Pulsar Slink formatter Slink merger Muon Reces SVT L2toTS Transmitters How to keep firmware.
1 Pulsar firmware status June 11th, 2004 Slink format Transmitter firmware Transmitter firmware status Receiver firmware overview Receiver firmware status.
Using the Trigger Test Stand at CDF for Benchmarking CPU (and eventually GPU) Performance Wesley Ketchum (University of Chicago)
Unit 5 Simple Present, Time Clauses, Used To, and Would.
W. Freeman, D0 PMG 25-Feb-03 1 Run IIb Schedule Status u Schedule Status u Update on near-term equipment expenditures u Budgeting Update u Summary.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
Outline: Current status Active splitter Plan Chris Neu, Daniel Whiteson, Rick Van Berg L2 Upgrade Meeting 11 June 2004 XCES Input Path: Status.
Joint Commissioning (2) Commissioning plan Gene Flanagan Purdue University.
Pulsar System Overview and Commissioning Plan Cheng-Ju Lin Fermilab Installation Readiness Review 02/08/2005 Outline: - Items from last review - Pulsar.
5 LISTING APPOINTMENT FUNDAMENTALS. TODAY’S WORKSHOP Intro 5 Listing Appointment Fundamentals CMA’S and Commissions How to get to the next level.
Input/ Output By Mohit Sehgal. What is Input/Output of a Computer? Connection with Machine Every machine has I/O (Like a function) In computing, input/output,
Burkard Reisert June 11 th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting Ted’s overview talk: Pulsar production/testing success !  all hardware.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
String-18 New-DAQ Commissioning Azriel Goldschmidt AMANDA Collaboration Meeting Berkeley, March 2002.
Technical Part Laura Sartori. - System Overview - Hardware Configuration : description of the main tasks - L2 Decision CPU: algorithm timing analysis.
27 July 2006Trigger Upgrades Review1 Status & Plans of the TDWG Mission Statement What Do We have to Guide Us ? Caveats & Concerns Current & Anticipated.
News Ted & Kirsten June 10, 2005 TDWG. Meet Trigger Reps today? Exotic Trigger Reps: Vadim and Oscar doing great work QCD Trigger Rep: Mary herself EWK.
Commissioning Experience and Status Burkard Reisert (FNAL) L2 installation readiness review:
D0 Taking Stock 11/ /2005 Calibration Database Servers.
Svtsim status Bill Ashmanskas, CDF simulation meeting, Main authors: Ashmanskas, Belforte, Cerri, Nakaya, Punzi Design goals/features: –main.
For more information on Pulsar board: Burkard Reisert (FNAL) Nov. 7 th, 2003 PULSAR Production Readiness.
L2 Upgrade review 19th June 2007Alison Lister, UC Davis1 XFT Monitoring + Error Rates Alison Lister Robin Erbacher, Rob Forrest, Andrew Ivanov, Aron Soha.
HEPiX FNAL ‘02 25 th Oct 2002 Alan Silverman HEPiX Large Cluster SIG Report Alan Silverman 25 th October 2002 HEPiX 2002, FNAL.
Simple ideas on how to integrate L2CAL and L2XFT ---> food for thoughts Ted May 25th, 2007.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
HIGUCHI Takeo Department of Physics, Faulty of Science, University of Tokyo Representing dBASF Development Team BELLE/CHEP20001 Distributed BELLE Analysis.
Project Overview Ted Liu Fermilab Sept. 27 th, 2004 L2 Pulsar upgrade IRR Review
L2 Status and Plan Matt Worcester, Heather Ray, Monica Tecchio, Myron Campbell, Jane Nachtman, David Saltzberg, Tom Wright, Steve Kuhlmann, Karen Byrum,
Wesley SmithMay 12, 2008 Trigger Budget Review - 1 US CMS Mid-Year Budget Review Trigger Wesley Smith May 12, 2008 Outline Overview of Activities FY 08.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)
New L2cal hardware and CPU timing Laura Sartori. - System overview - Hardware Configuration: a set of Pulsar boards receives, preprocess and merges the.
ATLAS Trigger Development
L2CAL Pulsar Upgrade Proposal in 24 minutes An Executive Summary Ted Liu For the L2CAL upgrade team Pisa/Purdue/Rockefeller/UC /Madrid/Padova/Academica.
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
Pulsar Status Report Ted Liu Friday Trigger Meeting, May 10th. 02 PULSAR: PULSer And Recorder Pulsar design overview:  from L2 teststand tool to a general.
The SVT Bypass (not for review) 1.Hardware description; 2.Possible applications; 3.Technical feasibility; 4.Hardware requirements/needs; estimate on firmware/software.
L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
First group planning meeting: Introduction Introduce new people A brief history of time Goals of this meeting Project overview Roadmap Guideline for the.
L2toTS Status and Phase-1 Plan and Pulsar S-LINK Data Format Cheng-Ju Lin Fermilab L2 Trigger Upgrade Meeting 03/12/2004.
L2 CAL Status Vadim Rusu For the magnificent L2CAL team.
Analysis Trains Costin Grigoras Jan Fiete Grosse-Oetringhaus ALICE Offline Week,
Pulsar Hardware Status Burkard Reisert (FNAL) March, 14 th 2003.
Hans Wenzel CDF CAF meeting October 18 th -19 th CMS Computing at FNAL Hans Wenzel Fermilab  Introduction  CMS: What's on the floor, How we got.
CMS Trigger Upgrades Phase-I (1) Muon Trigger Upgrades: – CSCTF (CSC TrackFinder) – MPC (Muon Port Card) Calorimeter Trigger Upgrades: – HCAL TPG – Calorimeter.
News and Related Issues Ted & Kirsten May 27, 2005 TDWG News since last meeting (April 29th) Organization Issues: how to improve communication Future Plans:
November 15, 2005M Jones1 Track Lists in Level 2 Outputs from SLAM provide lists of tracks faster than the current path to SVT and Level 2 via XTRP Sparsify.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Current Status of the Tracking Trigger Software Andrew W. Rose.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
Chapter Six.
Initial check-out of Pulsar prototypes
Pulsar WG Meeting (C-J Lin)
ProtoDUNE SP DAQ assumptions, interfaces & constraints
HLT Jet and MET DQA Summary
Chapter Six.
L2 CPUs and DAQ Interface: Progress and Timeline
SVT – SuperB Workshop – Frascati Sept. 2010
The Road Warrior: first use of the Pulsar for SVT
Presentation transcript:

Introduction Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar Materials for the review will be available at:

Last review was extremely useful! Are we ready for operation?  last time (Sept. 2004) I said no. this time: very close! What do we (pulsar group) expect from this review?  To review - Is the system robust enough for operation? - Is the current performance good enough for initial operation? - is there anything missing on our to-do-list in the coming month? (see Cheng-Ju’s talk) Our goal is still March …

Commissioning manpower One thing I am proud of:  many people are working on physics analysis, or taking class, or other tasks while commissioning the Pulsar L2 system in the past few months…even Sakari has been helping XFT and SVT upgrade work…  yet, we have achieved a lot Key to success: attract smart/talent young people!  highly productive and coherent team work …  need to keep the moment going …

L1 muon L1 XTRP L1 trigger L2 CAL (CLIST/Iso) PreFred ShowMax (RECES) PC SLINK TS SVT Muon Cluster Electron Merger SVT L2toTS To keep things simple: (1)Waiting for Reces data (2)Very simple PCI handling  Different from alpha case  Not optimal timing performance Baseline for operation Pulsar pre-processors

S32PCI64 allows CPU to process current event, while loading next (up to) 31 events … we only request one event at a time right now  will improve this later Alpha process current event, while loading next one… Slink to PCI Slink to PCI mem CPU PCI to Slink data L2 decision

The rest of the talks System Overview: Cheng-Ju 30 mins Control/Decision node software: Daniel 30 mins PulsarMon: Wojtek 10 mins SMX fiber splitting status: Chris 10 mins System robustness and performance: Vadim 30 mins Summary: Ted 15 mins