CMS ESR. May, 2004 HCAL TriDAS 1 HCAL TPG Status Tullio Grassi University of Maryland May 2004.

Slides:



Advertisements
Similar presentations
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Advertisements

Alice EMCAL meeting, July EMCAL jet trigger status Olivier BOURRION LPSC, Grenoble.
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
USCMS/HCAL/TriDas. October, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland October 2003.
USCMS/Rochester. Oct 20, 2001HCAL TriDAS1 HCAL TPG and Readout CMS HCal meeting at Rochester Oct Oct 2001 Tullio Grassi, Drew Baden University of.
CMS/HCAL/TriDas. Sept, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland September 2003.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HCAL Group.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
HCAL Trigger Primitive Generator Tullio Grassi University of Maryland September 2004.
UMD Jan Overview Fanout Card (in GLOBAL mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) Unique board for.
CMS/HCAL/TriDas. Dec, 2003 HCAL TriDAS 1 Clocking Drew Baden University of Maryland December 2003.
CMS/ESSC. May, 2002HCAL TriDAS1 HCAL FE/DAQ Overview Shield Wall CPUCPU DAQ RUI HPD FE MODULE DAQ DATA SLINK64 [1 Gbit/s]  18 HTRs per Readout Crate FRONT-END.
USCMS Mayl TriDAS Update Drew Baden University of Maryland USCMS HCAL.
CMS Electronics Week November Electronics Issues Drew Baden University of Maryland USCMS HCAL.
HCAL/TriDas. November, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland November 2003.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.
Boston University October 31, Technical Status and Progress Report D. Baden, T. Grassi HCAL Trigger.
CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland June 2004.
Drew Baden, UMD Nov HCAL Trigger/Readout Texas Tech Meeting February 2001 Drew Baden, Tullio Grassi University of Maryland.
UMD DOE Review - 30-Aug-05 Drew Baden1 CMS Trigger Elecctronics CMS HCAL TriDAS is a joint effort between: –University of Maryland – Drew Baden –Boston.
HTR status Tullio Grassi Univ. of Maryland Feb 2004.
CMS June TriDAS Update Drew Baden University of Maryland USCMS HCAL.
CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland March 2004.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL TPG and Readout CMS HCAL Readout Status CERN Tullio Grassi, Drew Baden University of Maryland Jim Rohlf Boston University.
Drew Baden, UMD Nov HCAL Trigger/Readout CMS/Tridas November 2000 Drew Baden, Tullio Grassi University of Maryland.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
21-Jun-2005 HCAL TriDAS 1 HCAL TriDAS Status Drew Baden, University of Maryland For the HCAL Group: Boston University Fermilab Princeton University University.
CMS Electronics Week November Electronics Issues Drew Baden University of Maryland USCMS HCAL.
CMS/HCAL/TriDas. Dec, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland December 2003 What’s new since September 2003…
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CMS/CERN. June, HCAL TPG and Readout CMS HCAL Readout Status CERN Drew Baden University of Maryland June 2002
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Wilco Vink 1 Outline Optical station Vertex processor board Output board Latency.
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
13-Feb-2004 HCAL TriDAS 1 HCAL Tridas SLHC Drew Baden University of Maryland February 2004.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
Possible SLHC Modifications to Clock Distribution Chris Tully, Dan Marlow Princeton Madison, Wisconsin February 13, 2003 Current SLB Clock Distribution.
Feb 2002 HTR Status CMS HCal meeting at FIT Feb. 7-9, 2002 Tullio Grassi University of Maryland.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
25 Sept 2001Tullio Grassi From MAPLD2001 ( space community conference ) Major causes of failures.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
HCAL DAQ Path Upgrades Current DCC Status New DCC Hardware Software
CCS Hardware Test and Commissioning Plan
CMS SLHC Calorimeter Trigger Upgrade,
ECAL OD Electronic Workshop 7-8/04/2005
Calorimeter Trigger Synchronization in CMS,
TTC system and test synchronization
Geneve The Alps Where is CERN? Jura Mountains Lake Geneva 18-Sep-18
HCAL Configuration Issues
Synchronization Policy: HCAL will follow ECAL as much as possible
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
USCMS HCAL FERU: Front End Readout Unit
PID meeting Mechanical implementation Electronics architecture
Data Concentrator Card and Test System for the CMS ECAL Readout
HCAL DAQ Interface Eric Hazen Jim Rohlf Shouxiang Wu Boston University
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

CMS ESR. May, 2004 HCAL TriDAS 1 HCAL TPG Status Tullio Grassi University of Maryland May 2004

CMS ESR. May, 2004 HCAL TriDAS 2 Clock & BC0 Distribution “RX_CLK” and “RX_BC0” signals for all CAL TPGs transmission Implement this requirement using 2 or 3-stage fanout scheme Details to be defined with ECAL. Rack-to-Rack CAT 6/7 HTRHTR DCCDCC HTRHTR HTRHTR HTRHTR FANOUTFANOUT HTRHTR DCCDCC HTRHTR HTRHTR HTRHTR FANOUTFANOUT FANOUTFANOUT FANOUTFANOUT FANOUTFANOUT TTC Minicrate 16 HCAL VME Crates ECAL (18 crates)

CMS ESR. May, 2004 HCAL TriDAS 3 Fanout board - features Built by J. Mans and C. Tully at Princeton Fanout 4 differential LVPECL signals over cat6 with RJ45 connectors: –RX_CLK, –RX_BC0 –TTC serial stream –80MHz Ref_Clk Board operates in 2 modes –Global (unique board for ECAL and HCAL) –Crate Successfully used in 2003 testbeam and all current HCAL R&D test stands J.C. da Silva received one board for evaluation and “blessing”

CMS ESR. May, 2004 HCAL TriDAS 4 Fanout Board - diagram TTC fiber Clk80 P1 P2 Input from GLOBAL Fanout 18 Identical Outputs (also as timing) 40MHz TTC_CLK RX_CLK RX_BC0 INT_BC0 RX_CLK RX_BC0 QPLL 80MHz QPLL can run stand-alone TTCrx EXT_BC0 TTC Broadcast QPLL implemented this way allows RX_CLK to be “cleaned” at each board if needed GCGC GCGC FPGA Progr. Delay Decoding GCGC G

CMS ESR. May, 2004 HCAL TriDAS 5 Complete path of a 40MHz RX_CLK TTC fiber CLK40_Des1 FPGA CAT7 (RX_CLK, RX_BC0) TTCrx QPLL FPGA TTCrx QPLL Fanout board in Crate-mode Fanout board in Global-mode 3.3V CMOS Path is 3.3V differential PECL unless otherwise stated. Path of RX_BC0 is similar but comes from the FPGA rather the QPLL In the Global-mode card, do not mount the buffers for CLK80 and TTC CAT7 (RX_CLK, RX_BC0, TTC, CLK80) HTR SLB Max skew on HTR traces is 0.7 ns. TPG spec is: Skew <  6 ns across HCAL and ECAL

CMS ESR. May, 2004 HCAL TriDAS 6 TTC-PMC mezzanine (UMD) –Carry TTCrx onto HCAL boards (HTR, DCC, Fanout) –Money-saver as it eliminated a lot of optical components and Fine-Line BGAs on 9U boards. Production is done (~350 boards) The assembly house mounted all LEDs backward Test in progress (100% yield so far)

CMS ESR. May, 2004 HCAL TriDAS 7 HTR Schematic RX_CLK40 SLB RX_BC0 TTC TTCrx mezzanine CLK80 Crystal Serial FE-Data Ref Clk Deserializers (8) 20 Recovered Clk TPG Path SYS40 Clk TTC Broadcast Async Fifo PLL TTC 40 Clk x2 XILINX LC Fiber Data SYS80 Clk Fanout Card (1/VME crate)

CMS ESR. May, 2004 HCAL TriDAS 8 HTR Rev4 Status Current (Rev4) board – 3 in lab now –Testing:  Links/Clocks (same as Rev3, no problems, no mystery at UMD)  DAQ path exactly same as Rev3  Trigger Primitive Generation (basic features)  Integration with SLB (next slide)

CMS ESR. May, 2004 HCAL TriDAS 9 Trigger link and SLB testing –Control of SLB (“Local Bus”) seems ok –JTAG working (connector on P3 area of motherboard) –Link tests between SLB and Wisconsin receiver board (STC) HP signal generator  120MHz clock for Receiver-STC 120MHz divided by 3 and injected into TTC system SLB runs with RX_CLK extracted from TTC+QPLL 1.2Gbaud copper link: verified –Some tests of Cat6 cable showed BER increases by ~10 compared to skew-clear cables. This could be fine, depending on the final cable length

CMS ESR. May, 2004 HCAL TriDAS 10 Trigger link and SLB testing Problems In our setup we have seen 2 problems, but we had not much time to investigate: 1.Two pairs seem swapped (we see A,B,D,C instead of A,B,C,D) 2.Data are mis-aligned from pair-to-pair. The mis- alignement changes every time we restart. We think that these are not a hardware or PCB problems, but cabling or firmware.

CMS ESR. May, 2004 HCAL TriDAS 11 Trigger Link testing So far, used Wisconsin STC boards. For commissioning and mass-production we need something different: –More channels –Programmable to optimize the test setup Layout underway for an SLB/Vitesse mezzanine transition –Allows to plug a Vitesse-Rx-mezzanine on each SLB post. –Run backwards into motherboard Board is now under design –Delays as an engineer left. HTR SLB site UW Vitesse receiver mezzanine card

CMS ESR. May, 2004 HCAL TriDAS 12 Production Issues Fiber Optics Some problems not fully understood. Seem more related to optical cables, connectors, laser Changing the receiver (HTR) is not considered Yield (excluding optics) Last year batch (Rev3) had 5 bad boards out of 30 Only 1 was fixed (assembler mounted wrong part) Not much time to find out the problems Assembler seems the best in the area.

CMS ESR. May, 2004 HCAL TriDAS 13 HTR Plans HTR-RCT Integration test in Wisconsin –Start on May 24 th –Will try to put energy on a given bunch and generate an L1A –Main goal is to validate all hardware If Wisconsin and Maryland groups are satisfied with the Integration Tests, we will launch the HTR production. Testbeam04 in CERN –At some point we want to use the last version (Rev4) –Issue: we only have 3 now. –HF needs 2 HTRs to run

CMS ESR. May, 2004 HCAL TriDAS 14 Level 1 Latency ItemHBHEHF BX to QIE input224 QIE to GOL (FE)998 Optical Link ( HTR → SLB12 SLB ?444 TPG Cables (15m)333 TOTAL HCAL O-E QIECCA HTR SLB RCT BX TOF To RBX DataTo RCT RBX HPD or PMT (HF) 46 clocks = 1,147.7ns GOL Nothing has changed (46 clock tick budget) –FPGA logic does not include summing! –Estimates: probably 1 more clock cycle in HF –Eliminating summing in overlap might be ok for MET/Jet triggers But would still have the 1→ 6 summing in HF 12-13

CMS ESR. May, 2004 HCAL TriDAS 15 TPG Alignment Align so that all ECAL and HCAL data from same bucket reaches RCT inputs at same time –Achieved by delaying each channel individually –Method for establishing this delay implemented inside SLB Histogram data over threshold, look for LHC structure pattern –Issue: For some detectors, occupancy is very low (HO, especially at low lumens) Ch N Ch N+1 Ch N+2 RX_BC0 (Global)

CMS ESR. May, 2004 HCAL TriDAS 16 Absolute (and Relative) Timing Relative timing within HCAL via: –Laser and LEDs Have to consider random latency variation after resynching optical links –Cross-check with BC0 from FE Absolute synchronization for Level 1 –SLB histograms E T –Looks for LHC beam structure –Does this work? (esp at low luminosity?) Salavat has been working on this –Min bias events, some with Orca and some with fast sim Occupancy at shown here –250MeV per ADC count Question: how many orbits to establish the LHC beam structure per detector?

CMS ESR. May, 2004 HCAL TriDAS 17 Summary (from Salavat) HCAL ElementCut (ADC counts) # LHC Orbits Required (88  s/orbit) HB,  ~0 ≥65x10 5 HB,  ~1.4 ≥610 5 HE,  ~1.6 ≥510 4 HE,  ~2.8 ≥510 2 HF, 13,  ~2.9 ≥510 4 HF, 13,  ~3.4 ≥510 3 HO, ring 2≥8>10 7 At 2x10 33

CMS ESR. May, 2004 HCAL TriDAS 18 Summary (from Salavat) For HB, HE, and HF probably easy to remeasure “on the fly” –Fill SLB histograms, read out over VME, calculate offset… For HO, probably will take few hours to maybe even a day –OK as long as absolute (non random) latency is stable over long periods –Need more simulation, checks…in progress

CMS ESR. May, 2004 HCAL TriDAS 19 Occupancy Implications and Alignment Bottom line: Will try to develop the following algorithm: –Whatever it takes, we measure the absolute alignment If it takes hours, then so be it... –We hope that this absolute alignment will not change over time –Keep track of the relative alignment by: Sending up a BC0 signal from the FE –Keep track of this. If the links go down and we reset, then we measure the relative alignment and adjust accordingly Problems: –If we are off by an order of magnitude or more...  Needs some more simulation, computing resources, etc. –Assumes long term stabilities which will have to be tracked

CMS ESR. May, 2004 HCAL TriDAS 20 Another Latency Issue TTCrx chip has a chip-to-chip variation in latency of ~20ns –Affect only the DAQ-path How well known is this? Need a scheme for insitu calibration of the TTCrx latency –Probably can come up with something for HTR/DCC/Fanout –Not sure what to do about TTCrx in FE...