1 Status of Cosmic Analysis Malcolm Ellis Imperial College London Wednesday 10 th March 2004.

Slides:



Advertisements
Similar presentations
Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Advertisements

Computing EVO meeting, January 15 th 2013 Status of the Tracking Code Gianluigi Boca, Pavia University.
1 Simulation Status/Plans Malcolm Ellis Sci Fi Tracker Meeting Imperial College, 10 th September 2004.
1Malcolm Ellis - Tracker Meeting - 18th May 2006 Reconstruction Plans  Staged process of building up Reconstruction over the rest of this year  Will.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
MICE-SciFi team, 14 October 2003 SciFi: progress report Progress: All stations shipped to FNAL … … assembly in progress Measurements: Effect of radiated.
1 Scintillating Fibre Tracker Simulation Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing.
1 Sci Fi Simulation and Reconstruction Status M.Ellis/C.Rogers Wednesday 31 st March 2004.
Tracker Software 1M.Ellis - CM23 - Harbin - 15th January 2009  Four key areas that currently need some work: u Digitisation u Decoding files u Unpacking.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Julia Sedgbeer Mice Collaboration Meeting, June SciFi Tracker – SW Status & Plans General SW status Simulation & Reconstruction Performance Studies.
Prototype Performance in D0 test stand M.Yoshida (Osaka Univ.)
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
Sci Fi Simulation Status Malcolm Ellis MICE Meeting Osaka, 2 nd August 2004.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
M. Ellis - 11th February 2004 Sci Fi Cosmic Light Yield 2 views 3 views.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Cosmic Ray Analysis 1M.Ellis - CM23 - Harbin - 15th January 2009  Not enough time to go into detail, so just a quick summary of the status since CM22:
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
Tracking Detectors Working Group MICE Collaboration Meeting March 30, 2004 A. Bross.
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
1 Status of the MICE SciFi Tracker Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
1 G4MICE Malcolm Ellis SciFi Tracker Meeting, KEK Thursday 31st March 2005.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
Simulation of a Magnetised Scintillating Detector for the Neutrino Factory Malcolm Ellis & Alan Bross Fermilab International Scoping Study Meeting KEK,
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
1 Recon tests, Sci Fi status and Sci Fi design iteration Malcolm Ellis MICE Software Phone Meeting Wednesday 28 th April 2004.
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
Status of TPC experiment ---- Online & Offline M. Niiyama H. Fujimura D.S. Ahn W.C. Chang.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
TPC online reconstruction Cluster Finder & Conformal Mapping Tracker Kalliopi Kanaki University of Bergen.
Optimising Cuts for HLT George Talbot Supervisor: Stewart Martin-Haugh.
1M. Ellis - MICE Tracker PC - 19th October 2007 Station QA Analysis (G4MICE)  For details of software see my previous talk here: u
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
1 Software for the KEK test Malcolm Ellis 13 th April 2005.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting Rutherford Appleton Lab Tuesday 25 th April 2006 M. Ellis.
Online Reconstruction 1M.Ellis - CM th October 2008.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
CBM ECAL simulation status Prokudin Mikhail ITEP.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
21 Sep 2009Paul Dauncey1 Status of Imperial tasks Paul Dauncey.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting U.C. Irvine Monday 21 st August 2006 M. Ellis & A. Bross.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
STAR SVT Self Alignment V. Perevoztchikov Brookhaven National Laboratory,USA.
T585 analysis status 2005/12/02 HIDEYUKI SAKAMOTO This analysis was done by RUN# (+1.0 GeV/c normal beam run) For the problem of small light yield.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
MICE Tracker Software A. Dobbs CM32 9 th Feb 2012.
M. Ellis - MICE Collaboration Meeting - Wednesday 27th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
1M. Ellis - Tracker PC - 7th March 2007 VLPC Cassette Characterisation  Third application (as described in past tracker meeting and CM17) is now working.
Requirements for the Software Group (and agreed actions)
Update of pattern recognition
Tracker Software Status
Cosmic ray test of RPC for the ATLAS experiment
Presentation transcript:

1 Status of Cosmic Analysis Malcolm Ellis Imperial College London Wednesday 10 th March 2004

2 Outline Status at Osaka Data-taking March 2004 Clustering Pattern Recognition Light Yield Efficiency Question mark over geometry/decoding/PR Further Work

3 Status at Osaka Makoto and I had received correct VLPC decoding and confirmed full decoding scheme. Tracks were successfully built and first light yield measurements with tracking look promising. Agreed need for more data…

4 Data-Taking March 2004 Paul set up new cassette (number 110) and modified trigger system Alan and I attached waveguides Data taking resumed on Friday (5 th ) Weekend spent doing timing scans and debugging DAQ (but data still useable for tracking and LY studies!) Date/Time of event added from Run 214 (taking now…) to check whether DAQ rate is flat in time.

5 Data-Taking Rate Over last 24 hours, taken approximately 2300 triggers. Of these 302 (13%) have a reconstructed track. Note, a simple estimate of rate of good triggers gives ~60%, so factor of 4 to be understood… Based on 10 more days of data-taking, we should add another triggers, and hence 3000 tracks. This gives an estimated total of 5500 tracks by the collaboration meeting! All plots in this talk are from sum of data taken up to and including Run 213 (finished just before lunch today). This comes to triggers and 2655 tracks.

6 Clustering I now build clusters first. All hits above 1.3 PE are considered. A hit on its own, or two neighbouring hits above 1.3 PE are merged into a cluster For a cluster to be retained, its total light must be more than the usual 2.6 PE. Clusters are then the basis for making points and tracks…

7 Pattern Recognition Once clusters are built, triplets are built in Station B. All unused hits in B (and of course A and C) are built into duplets. Points which are in a reasonable radius (or in the case of triplets, small residual) are kept for track building.

8 Track building All combinations of points are used to build a track The combination with the lowest chi2 is kept. The track is then re-fitted using a Least Squares fit. Still room for improvement to increase track-finding efficiency slightly

9 Extrap to Trigger Scintillator

10 Light Yield We have planes with different amounts of 3HF: –5000 ppm:A/X, A/V, B/X, C/W –3500 ppm: B/W –2500 ppm:B/V Plane W on Station C is a mixed plane and won’t be considered.

ppm 3HF

ppm 3HF

ppm 3HF

14 Efficiency Same algorithm as reported at Osaka, except now clusters are used, instead of single hits Results: –Plane X (5000 ppm) – ± 0.62 % –Plane W (3500 ppm) – ± 0.50 % –Plane V (2500 ppm) – ± 0.36 % 2500 ppm seems best of the three.

15 Geometry/Decoding OK? In general, scanning through events, they look good and can be broken down into 4 categories: –No hits at all, so cosmic didn’t go near the tracker –Some hits, which usually have a point in one or two trackers, but not all 3 –Hits and a track –7 or more hits, but no track…

16 No Hits

17 Some Hits – Grazing Track?

18 Good Track!

19 ??????

20 Further Work Now have gain data from channel-by-channel fit to LED data done by Juan for last year’s and this year’s data. I will incorporate this into code so that more accurate PE is estimated. Need to repeat Light Yield as function of space studies done at Osaka. Extend Efficiency calculation to all planes Check potential problem in geometry/decoding/PR Prepare and run G4MICE and present results at collaboration meeting…