VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB VRVS session, Jan. 2006.

Slides:



Advertisements
Similar presentations
SMEtoLEAD Training of SMEs to Become Successful Coordinators of Framework Programme Projects Proposal Preparation & Submission FP6 Research & Innovation.
Advertisements

1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
VRVS, Jan. 2006CERN AB-ATB1 MERIT layout in TT2/TT2A/TT10 CERN AB-ATB VRVS session, Jan
VRVS session, 8th March 2006CERN AB-ATB-EA1 Layout of Passages between TT2 and TT2A Adrian Fabich, CERN AB-ATB-EA VRVS session, 8.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
©2009 Susan B. Harwood Grant Safety Management Systems Safety Management Worksite Analysis Management Commitment and Employee Involvement Hazard Prevention.
Social Inclusion by Proactive Design InclusiveByDesign Second project meeting June 2001 Florence, Italy.
CDIO Initiative Project Meeting #15 Location: University of Pretoria, Engineering Tower Building, Pretoria, South Africa February 16-18, 2005.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Project manager report paul drumm CM16 October 2006.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
Status meeting 3 – 28/29 April 2008 Sampler Education Pilot Project Deliverables: methods, templates and formats for examination material Anke Oberender.
Introduction Training on Safe Hospitals in Disasters.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Welcome to 6 th Grade NOW SHOWING STUDENT IMPROVEMENT IN Please enter quietly and find your desk! Thank you.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
ELG2336 Introduction to Laboratory
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Work Package Controls Inception Phase Review February 5th, 2010 Johannes Gutleber PR a-JGU, February 5th, 2010 J. Gutleber 1 R. Gutleber.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
SACM IETF-91Meeting November 10 and 14, 2014 Dan Romascanu Adam Montville.
Harry Carter – T4CM Meeting 7/13-14/2006 Type IV Cryomodule (T4CM) Design Meeting #2 H. Carter Fermilab Technical Division.
Paul Holleis Embedded Interaction Research Group University of Munich, Germany Dec. 7, 2005 Introducing the EIToolkit Albrecht SchmidtPaul HolleisMatthias.
1 ND280m Overview of the activities T. Nakaya (Kyoto) Nov 7,
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
AGS RSVP Weekly Meeting P. Pile 24 Mar 2005 AGS RSVP Weekly Meeting 24 Mar 2005 Useful Links: RSVP Project : C-AD.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
Virtual World Framework: Extending our World Augmented reality on the go or in the classroom Experience the interactive world Virtual World Framework workshop.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
FMD Concerns National Nutrition Council 4 th Management Conference December 2015 NNC Board Room 1.
January All Leader Call Mid-Winter Training & DEC Meeting.
Layout of the Front-End Test Stand Ajit Kurup UK Neutrino Factory Meeting 12 th January 2005.
1. Action now Register now and spread information to your team members/collaborators: y?confId=204269https://indico.cern.ch/confRegistrationFormDisplay.p.
Semester Exam 2015 Information for Success. Exam Dates Tuesday, December 8 th Wednesday, December 9 th Thursday, December 10 th Friday, December 11 th.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
+ Today’s Agenda Co-Teaching Institute. + End of Day Product #1 Classroom design plan (Poster Paper) Design your room (or suggestions for your room if.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
CLIC activity of S. Iija Feb 20121S. Iija, BE-RF-PM EDMS MTF Administrative work.
Semester Exam 2013 Information for Success. Dates Tuesday, December 10 th Wednesday, December 11 th Thursday, December 12 th Friday, December 13 th The.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
MERIT status A.Fabich CERN VRVS 9 th Oct A. Fabich, CERN, VRVS 9th Oct 2007.
Mass Casualty Incident Plan Training
CRG-TM: LS1 projects review
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
Status of the PANDA Magnet
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
The DBD: Outline and Scope
Collecting High-Quality Data
Workshop on Distributed Embedded Systems, Lorentz Center, 21–24 Nov.05
M&E Frameworks! Yesterday we reviewed the basics about ACSM and introduced some common terms that we will be using for the rest of this week. Today we.
DER Growth Scenarios and Load Forecasts Working Group
SPROW Sustainable Public Rights Of Way
Presentation transcript:

VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB VRVS session, Jan. 2006

VRVS, Jan CERN AB-ATB PS beam, 2 Agenda Friday 3 rd February 2006, 9:00 (room: Salle A) Agenda: Morning session Introduction to review 20′′ Magnet 40′′ Cryogenics 40′′ Lunch break Reviewers – recommendations/questions Summary Speakers should prepare a talk of 40 min. All preparations will be followed by discussion Expected end : 15:30

VRVS, Jan CERN AB-ATB PS beam, 3 Guidelines for Presentations Introduction of the system Key components and functionality Safety issues involved Production: status and tests at factory Installation Operational scheme Respect allocated time!

VRVS, Jan CERN AB-ATB PS beam, 4 Schedule until Review A set of documentation should be provided in advance, which will be submitted to the reviewers for preparation. Guidelines/skeleton will be distributed on 23.Jan. Documentation should be provided by Monday 30.Jan. to the reviewers Documentation should include: engineering drawings calculations specifications functionality description installation concerns